Lateral Earth Pressure
ITB Lecture
2011
Reference: 
1. Das, Braja M., Principles of Geotechnical Engineering, Brooks/Cole, USA, 2002. 
CHAPTER 12
2. The Canadian Foundation Engineering Manual, 2006

’h = K ’v

’’v ’’v ’’v

’h = Ko ’v ’h = Ka ’v ’h = Kp ’v

Note: All stresses in effective stress , NOT in total stress

1
9/28/2013

 Lp >>  La

At Rest, Ko
• Jaky, 1944 (good for loose sand)
Ko = 1 –sin ’
• Sherif, Fang, 1984 (dense sand)
Ko = 1 –sin ’ + 5.5 [ (d/d min) ‐ 1]
• Massarsch, 1979 (NC clays)
Ko = 0.44 + 0.42 [PI(%)/100]
• OC Clays: Ko, OC = Ko NC OCR

2
9/28/2013

Practice on Partially Submerged Wall
• Practice on board!!
• See example 12.1  in text book.

3
9/28/2013

4
9/28/2013

5
9/28/2013

 X

6
9/28/2013

The Pole Method 

(q,q) a

POLE
a
b
a b  = a
a
b 
b
(p,p)

Watch for the sign 
convention
Switch to 35 mm screen

Rankine Ka – The Pole Method

 v

A
h

A ff

h h h v 
POLE ff

A

7
9/28/2013

Rankine Kp – The Pole Method

 v
A

h
A

h v h h 

ff

A POLE
ff

Rankine Ka
45o + ’/2

c’/tan ’ (’v + ’h)/2  ’’
 v

h

ff
c’
’ (90o+’)/2
’h ’v 
(90o‐’)
 ff
’ POLE (’v ‐ 
( ’h)/2 
)/2
sin ’ =
c’/tan ’ + (’v + ’h)/2 

’h = ’v Ka – 2c’  Ka


Ka = tan2 (45o ‐ ’/2)

8
9/28/2013

Rankine Kp
45o ‐ ’/2


c’/tan ’ (’v + ’h)/2  ’
 v

h

ff
c’ (90o‐)
’
’v ’h 
’ff
 POLE (’h ‐ 
( ’v)/2 
)/2
sin ’ =
c’/tan ’ + (’v + ’h)/2 

’h = ’v Kp + 2c’  Kp


Kp = tan2 (45o + ’/2)

Why Effective Stress??
• ’ = t – u
• utot = uhydro static + uexcess

•  h’ = K x  v ’ h = K x v’ + utot

K < or > 1:
h = K x v
h = K x v’ + K x utot

9
9/28/2013

Practice in Class with p.384
q  [F/L2]

‐ +

Rankine Active with Sloping Backfill

’v = ’ h 

10
9/28/2013

Do the passive exercise!!

’v = ’ h

Coulomb’s Active Pressure

11
9/28/2013

12
9/28/2013

Culmann’s solution of Coulomb

13
9/28/2013

14
9/28/2013

15
9/28/2013

16
9/28/2013

17
9/28/2013

18
9/28/2013

19
9/28/2013

20
9/28/2013

Coulomb’s Passive Pressure

21
9/28/2013

Coulomb’s Passive + EQ

0 5 ’ H2 ( 1 – kv) Kp’
Ppe = 0.5

22
9/28/2013

Log Spiral Failure Plane

23
9/28/2013

24
9/28/2013

25
9/28/2013

26
9/28/2013

27
9/28/2013

Caquot & Kerisel

Active and Pasive Coefficients

28
9/28/2013

Morrison & Ebeling 1995

29
9/28/2013

Braced Cuts
From Canadian Foundation Engineering Manual, 4th Ed, 2006

30
9/28/2013

31
9/28/2013

32
9/28/2013

Peck et al.

Teng

Wayne Teng

33
9/28/2013

Catatan FXT:

Hanya betul
kalau
Ka = 1;

dan
conservative 
kalau negative 
pp

Catatan FXT:
Cideng:

( H + q) / cb = 

(90 + 40)/ (0.25 x 6 
x 5) =  17!!

SF Base heave:
5 x 7.5 ~ 15 
/(
/(90+40) )
= 0.3 to 0.6

34
9/28/2013

British Practice (Tomlinson, Foundation Design and 
Construction, 7th Ed, page 421)

35
9/28/2013

36
9/28/2013

37
9/28/2013

Tanjung Priok – Basin 1

38
9/28/2013

39
9/28/2013

40
9/28/2013

41
9/28/2013

42
9/28/2013

43
9/28/2013

T. Priok Basin 1
+ Built 1877‐1883
+ Quay L= 1100 m, D = 7.5 m
+ 1910 Dredged to 8.5 m
spoil dumped on East side,
helping reduce the malaria
inhabited swamps. In 1908, 
out of 139 servicemen, 14 died
of malaria.

44
9/28/2013

45
9/28/2013

46
9/28/2013

Dubai Infinity Tower 2007

..and one day the workers heard a loud crack and felt the 
movement, and saw sand coming in, and then water…

47
9/28/2013

…2 minutes later ..

…. 4 minutes later

48
9/28/2013

…at the end …

49