The document outlines a 7-month work plan for upgrading a 36km road in Mwanza region, Tanzania from single to double surface dressing, including conducting a feasibility study and preliminary design in the first 2 months, detailed engineering design in months 3-4, and submission of documents and reports in months 5-7.
The document outlines a 7-month work plan for upgrading a 36km road in Mwanza region, Tanzania from single to double surface dressing, including conducting a feasibility study and preliminary design in the first 2 months, detailed engineering design in months 3-4, and submission of documents and reports in months 5-7.
The document outlines a 7-month work plan for upgrading a 36km road in Mwanza region, Tanzania from single to double surface dressing, including conducting a feasibility study and preliminary design in the first 2 months, detailed engineering design in months 3-4, and submission of documents and reports in months 5-7.