Salarios Cuadrillas Costos Base Materiales 2

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 75

UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN

PRESUPUESTOS
NOMBRE DEL ESTUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR
PROYECTO: DIRECCIÓN:

Percepcion Prima
SALARIO REAL INTEGRADO
Total
Cargo Salario Base Total Vacacional Gratificacion Devengado Cuota IMSS I.S.R.P. Guarderia INFONAVIT
Almacenista $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Aluminero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Aux. de Topografo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Ayudante A $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Ayudante B $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Azulejero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Barretero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Bombero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cabo de oficiales $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cabo de peones $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cadenero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Carpintero de Banco $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Carpintero Obra Negra $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Checador de materiales $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Chofer de Camion $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Electricista $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fierrero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Herrero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Jefe de Almacen $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Maestro $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Maniobrista $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mecánico $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mecanico montador de equipo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Montador de equipo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Oficial Albañil $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Oficial electrico "C" $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Oficial Especializado $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Oficial Plomero "C" $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Operador $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Operador de Equipo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Operador de Maquinaria "A" $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Operador de Maquinaria "B" $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Peon $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Pintor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Plomero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Poblador $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Rastrillero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sobreestante de terraceria $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sobrestante de tuberia soldada $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Soldador $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Soldador Calificado $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Tomador de Tiempo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Tornillero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Tubero de primera $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Tubero de segunda $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Velador $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Vidriero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Yesero $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PAN

I -2019

S.A.R. Suma Total Salario Real


$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
Cuadrilla No. (1 peon) 1 Cuadrilla No. (6 peon) 6
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 1 $0.00 $0.00 Peon Jor. 6 $0.00 $0.00

Mando Intermedios Mando Intermedios


Cabo de Peones Jor. 0.05000 $0.00 $0.00 Cabo de Peones Jor. 0.30000 $0.00 $0.00
Maestro Jor. 0.01667 $0.00 $0.00 Maestro Jor. 0.10000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta menor Dep. Herramienta menor
y equipo de seguridad % 7% $0.00 $0.00 y equipo de seguridad % 7% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. (2 peon) 2 Cuadrilla No. (7 peon) 7


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 2 $0.00 $0.00 Peon Jor. 7 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.10000 $0.00 $0.00 Cabo de Peones Jor. 0.35000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.11667 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta menor Dep. Herramienta menor
y equipo de seguridad % 7% $0.00 $0.00 y equipo de seguridad % 7% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. (3 peon) 3 Cuadrilla No. (8 peon) 8


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 3 $0.00 $0.00 Peon Jor. 8 $0.00 $0.00

Mando Intermedios Mando Intermedios


Cabo de Peones Jor. 0.15000 $0.00 $0.00 Cabo de Peones Jor. 0.40000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.13333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta menor Dep. Herramienta menor
y equipo de seguridad % 7% $0.00 $0.00 y equipo de seguridad % 7% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. (4 peon) 4 Cuadrilla No. 9 (1 ayudante "B")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 4 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00

Mando Intermedios Mando Intermedios


Cabo de Peones Jor. 0.20000 $0.00 $0.00 Cabo de Peones Jor. 0.05000 $0.00 $0.00
Maestro Jor. 0.06667 $0.00 $0.00 Maestro Jor. 0.01667 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta menor Dep. Herramienta menor
y equipo de seguridad % 7% $0.00 $0.00 y equipo de seguridad % 7% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. (5 peon) 5 Cuadrilla No.10 ( 1 ayudante "A")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 5 $0.00 $0.00 Ayudante "A" Jor. 1 $0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.25000 $0.00 $0.00 Cabo de Peones Jor. 0.05000 $0.00 $0.00
Maestro Jor. 0.08333 $0.00 $0.00 Maestro Jor. 0.01667 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta menor Dep. Herramienta menor
y equipo de seguridad % 7% $0.00 $0.00 y equipo de seguridad % 7% $0.00 $0.00
Total $0.00 Total $0.00
Cuadrilla No. 11(Azulejero+Ayud"B") Cuadrilla No.16 (Of. Alb+4ayd "B")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Azulejero Jor. 1 $0.00 $0.00 Ayudante "B" Jor. 4 $0.00 $0.00
Ayudante "B" Jor. 1 $0.00 $0.00 Oficial Albañil Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.10000 $0.00 $0.00 Cabo de Peones Jor. 0.25000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.08333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta menor Dep. Herramienta menor
y equipo de seguridad % 7% $0.00 $0.00 y equipo de seguridad % 7% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 12(oficial alb+ peon) Cuadrilla No.17 (Of. Albañil+5peon)


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 1 $0.00 $0.00 Peon Jor. 5 $0.00 $0.00
Oficial Albañil Jor. 1 $0.00 $0.00 Oficial Albañil Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.10000 $0.00 $0.00 Cabo de Peones Jor. 0.30000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.10000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta menor Dep. Herramienta menor
y equipo de seguridad % 7% $0.00 $0.00 y equipo de seguridad % 7% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No.13 (Of. Alb+2 peon) Cuadrilla No.18 (Of.Alb+ Ayud "B")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 2 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Ofical albañil Jor. 1 $0.00 $0.00 Oficial Albañil Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.15000 $0.00 $0.00 Cabo de Peones Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 14(OfAlb+3 peon) Cuadrilla No.19 (Of. Esp+ayud "B")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 3 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Ofical albañil Jor. 1 $0.00 $0.00 Oficial Especializado Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.20000 $0.00 $0.00 Cabo de Peones Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.06667 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 15(OfAlb+4 peon) Cuadrilla No.20 (2Of. Esp+2ayud "B")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 4 $0.00 $0.00 Ayudante "B" Jor. 2 $0.00 $0.00
Ofical albañil Jor. 1 $0.00 $0.00 Oficial Especializado Jor. 2 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.25000 $0.00 $0.00 Cabo de Peones Jor. 0.20000 $0.00 $0.00
Maestro Jor. 0.08333 $0.00 $0.00 Maestro Jor. 0.06667 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00
Cuadrilla No. 21(Carp.Ob.Neg+Ayud"B") Cuadrilla No.26 (Pintor+ayud "B")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Carpintero de Obra Negra Jor. 1 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Ayudante "B" Jor. 1 $0.00 $0.00 Pintor Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.10000 $0.00 $0.00 Cabo de Peones Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 22(Carp Banco+ Ayud "A") Cuadrilla No.27 (Herrero+ Ayud"B")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "A" Jor. 1 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Carpintero de Banco Jor. 1 $0.00 $0.00 Herrero Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.10000 $0.00 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No.23 (Fierrero+Ayud "B") Cuadrilla No.28 (Herrero+ Ayud"A")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "B" Jor. 1 $0.00 $0.00 Ayudante "A" Jor. 1 $0.00 $0.00
Fierrero Jor. 1 $0.00 $0.00 Herrero Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.10000 $0.00 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 24(Fierrero+2Ayud "B") Cuadrilla No.29 (Soldador+ayud "B")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "B" Jor. 2 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Fierrero Jor. 1 $0.00 $0.00 Soldador Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.15000 $0.00 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 25(yesero+ ayud "B") Cuadrilla No.30 (Sold.Calif+ayud "A")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "B" Jor. 1 $0.00 $0.00 Ayudante "A" Jor. 1 $0.00 $0.00
Yesero Jor. 1 $0.00 $0.00 Saldador Calificado Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.10000 $0.00 $0.00 Cabo de Peones Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.05000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00
Cuadrilla No. 31(1 Aluminero) Cuadrilla No.36 (Plomero+2ayud "A")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Aluminero Jor. 1 $0.00 $0.00 Ayudante "A" Jor. 2 $0.00 $0.00
$0.00 Plomero Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
$0.00 Cabo de Oficiales Jor. 0.15000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.07500 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 32(Alum.+ Ayud "A") Cuadrilla No.37 (Electric+ Ayud"A")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "A" Jor. 1 $0.00 $0.00 Ayudante "A" Jor. 1 $0.00 $0.00
Aluminero Jor. 1 $0.00 $0.00 Electricista Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
$0.00 Cabo de Oficiales Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.10000 $0.00 $0.00 Maestro Jor. 0.05000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No.33 (Vidriero+Ayud "B") Cuadrilla No.38(Electric+ 2Ayud"A")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "B" Jor. 1 $0.00 $0.00 Ayudante "A" Jor. 2 $0.00 $0.00
Vidriero Jor. 1 $0.00 $0.00 Electricista Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
$0.00 Cabo de Oficiales Jor. 0.15000 $0.00 $0.00
Maestro Jor. 0.10000 $0.00 $0.00 Maestro Jor. 0.07500 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 34(Vidriero+Ayud "A") Cuadrilla No.39 (Operador Equipo)


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "A" Jor. 1 $0.00 $0.00 Operador de Equipo Jor. 1 $0.00 $0.00
Vidriero Jor. 1 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
$0.00 Cabo de Oficiales Jor. 0.05000 $0.00 $0.00
Maestro Jor. 0.10000 $0.00 $0.00 Maestro Jor. 0.01667 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 35(Plomero+ ayud "A") Cuadrilla No.40 (Op. Equipo+ peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "A" Jor. 1 $0.00 $0.00 Operador de Equipo Jor. 1 $0.00 $0.00
Plomero Jor. 1 $0.00 $0.00 Peon Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.10000 $0.00 $0.00 Cabo de Oficiales Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00
Cuadrilla No. 41(Op. Equipo+2peones) Cuadrilla No.46 (Chofer Camio+peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Operador de Equipo Jor. 1 $0.00 $0.00 Peon Jor. 1 $0.00 $0.00
Peon Jor. 2 $0.00 $0.00 Chofer de Camion Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.15000 $0.00 $0.00 Sobrestante de Terraceria Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 42(Op. Equ + 3 peon) Cuadrilla No.47 (Chofer Camion+ Ayud"B")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Operador de Equipo Jor. 1 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Peon Jor. 3 $0.00 $0.00 Chofer de Camion Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.20000 $0.00 $0.00 Sobrestante de Terraceria Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.06667 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No.43 (Op.Equ+4peon) Cuadrilla No.48(Aux. Topografo+ 4Ayud"A")


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Operador de Equipo Jor. 1 $0.00 $0.00 Ayudante "A" Jor. 4 $0.00 $0.00
Peon Jor. 4 $0.00 $0.00 Aux. Topografo Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.25000 $0.00 $0.00 $0.00
Maestro Jor. 0.08333 $0.00 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 44(Op.Maq"B"+Ayud"B") Cuadrilla No.49 (2 Of. Albañil+ 4 peones)


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "B" Jor. 1 $0.00 $0.00 Peones Jor. 4 $0.00 $0.00
Op. Maquinaria "B" Jor. 1 $0.00 $0.00 Oficial. Albañil Jor. 2 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Sobrestante de Terraceria Jor. 0.10000 $0.00 $0.00 Cabo de Oficiales Jor. 0.30000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.10000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 45(Op.Maq"A"+ayud "A") Cuadrilla No.50 (2Oficial Albañil+ 9peon)


Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "A" Jor. 1 $0.00 $0.00 Oficial. Albañil Jor. 2 $0.00 $0.00
Operador de Maquinaria " Jor. 1 $0.00 $0.00 Peon Jor. 9 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Sobrestante de Terraceria Jor. 0.10000 $0.00 $0.00 Cabo de Oficiales Jor. 0.55000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00 Maestro Jor. 0.18333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00
Cuadrilla No. 51(2Oficial Albañil+5peones) Cuadrilla No.56 (9 peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Oficial. Albañil Jor. 2 $0.00 $0.00 Peon Jor. 9 $0.00 $0.00
Peon Jor. 5 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.35000 $0.00 $0.00 Cabo de Peones Jor. 0.45000 $0.00 $0.00
Maestro Jor. 0.11667 $0.00 $0.00 Maestro Jor. 0.15000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 52(2 Oficial Albañil + 10 peon) Cuadrilla No.57 (Poblador + Ayud"A")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Oficial. Albañil Jor. 2 $0.00 $0.00 Ayudante "A" Jor. 1 $0.00 $0.00
Peon Jor. 10 $0.00 $0.00 Poblador Jor. 1 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.60000 $0.00 $0.00 Cabo de Oficiales Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.20000 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No.53 (Plomero + Ayudante "B"+ Peon) Cuadrilla No.58(Oficial Albañil+ 1Ayud"B"+ 7 Peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Plomero Jor. 1 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Peon Jor. 1 $0.00 $0.00 Oficial Albañil Jor. 1 $0.00 $0.00
Ayudante "B" Jor. 1 $0.00 $0.00 Peon Jor. 7 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.15000 $0.00 $0.00 Cabo de Oficiales Jor. 0.45000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.15000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 54(Oficial Electrico "C"+Ayud"B" + Peon) Cuadrilla No.59 (Oficial Albañil+ 1Ayud"B"+ 3 Peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Ayudante "B" Jor. 1 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Oficial Electrico "C" Jor. 1 $0.00 $0.00 Oficial Albañil Jor. 1 $0.00 $0.00
Peon Jor. 1 $0.00 $0.00 Peon Jor. 3 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.15000 $0.00 $0.00 Cabo de Oficiales Jor. 0.25000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00 Maestro Jor. 0.08333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 55(10 Peon) Cuadrilla No.60 (Oficial Albañil+ Ayudante "A" + peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Peon Jor. 10 $0.00 $0.00 Oficial. Albañil Jor. 1 $0.00 $0.00
$0.00 Peon Jor. 1 $0.00 $0.00
$0.00 Ayudante "A" Jor. 1 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.50000 $0.00 $0.00 Cabo de Oficiales Jor. 0.15000 $0.00 $0.00
Maestro Jor. 0.16667 $0.00 $0.00 Maestro Jor. 0.05000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00
Cuadrilla No. 61(Oficial Albañil +Tubero 2da.+2peones) Cuadrilla No.66 (Tubero 1ra+ 2Tubero 2da + 4 peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Oficial. Albañil Jor. 1 $0.00 $0.00 Peon Jor. 4 $0.00 $0.00
Peon Jor. 2 $0.00 $0.00 Tubero de segunda Jor. 2 $0.00 $0.00
Tubero de segunda Jor. 1 $0.00 $0.00 Tubero de primera Jor. 1 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.20000 $0.00 $0.00 Cabo de Oficiales Jor. 0.35000 $0.00 $0.00
Maestro Jor. 0.06667 $0.00 $0.00 Maestro Jor. 0.11667 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 62(Oficial Albañil +Tubero 1ra.+2peones) Cuadrilla No.67 (Tubero 1ra+ 2Tubero 2da + 6 peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Oficial. Albañil Jor. 1 $0.00 $0.00 Peon Jor. 6 $0.00 $0.00
Peon Jor. 2 $0.00 $0.00 Tubero de segunda Jor. 2 $0.00 $0.00
Tubero de primera Jor. 1 $0.00 $0.00 Tubero de primera Jor. 1 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.20000 $0.00 $0.00 Cabo de Oficiales Jor. 0.45000 $0.00 $0.00
Maestro Jor. 0.06667 $0.00 $0.00 Maestro Jor. 0.15000 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No.63 (Oficial Albañil +Tubero 1ra.+4peones) Cuadrilla No.68(Tornillero + 4 Rastrillero+ 5 Peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Oficial. Albañil Jor. 1 $0.00 $0.00 Tornillero Jor. 1 $0.00 $0.00
Peon Jor. 4 $0.00 $0.00 Rastrillero Jor. 4 $0.00 $0.00
Tubero de primera Jor. 1 $0.00 $0.00 Peon Jor. 5 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.30000 $0.00 $0.00 Cabo de Oficiales Jor. 0.50000 $0.00 $0.00
Maestro Jor. 0.10000 $0.00 $0.00 Maestro Jor. 0.16667 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 64(Oficial Albañil +Tubero 1ra.+7peones) Cuadrilla No.69 (4Oficial Albañil+ 4Ayud"B")
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Oficial. Albañil Jor. 1 $0.00 $0.00 Ayudante "B" Jor. 4 $0.00 $0.00
Peon Jor. 7 $0.00 $0.00 Oficial Albañil Jor. 4 $0.00 $0.00
Tubero de primera Jor. 1 $0.00 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Oficiales Jor. 0.45000 $0.00 $0.00 Cabo de Oficiales Jor. 0.40000 $0.00 $0.00
Maestro Jor. 0.15000 $0.00 $0.00 Maestro Jor. 0.13333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00

Cuadrilla No. 65(Oficial Albañil +Tubero 1ra.+9peones) Cuadrilla No.70 (Montador de Equipo + Ayudante "B" )
Mano de obra Unidad Cantidad Salario Real Imp. Total Mano de obra Unidad Cantidad Salario Real Imp. Total
Oficial. Albañil Jor. 1 $0.00 $0.00 Montador de Equipo Jor. 1 $0.00 $0.00
Peon Jor. 9 $0.00 $0.00 Ayudante "B" Jor. 1 $0.00 $0.00
Tubero de primera Jor. 1 $0.00 $0.00 $0.00
$0.00 $0.00
Mando Intermedios Mando Intermedios
Cabo de Peones Jor. 0.55000 $0.00 $0.00 Cabo de Oficiales Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.18333 $0.00 $0.00 Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00 Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00 Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00 Total $0.00
Cuadrilla No. 71(Montador de Equipo + Ayudante "B"+ Peon)
Mano de obra Unidad Cantidad Salario Real Imp. Total
Montador de Equipo Jor. 1 $0.00 $0.00
Ayudante "B" Jor. 1 $0.00 $0.00
Peon Jor. 1 $0.00 $0.00
$0.00
Mando Intermedios
Cabo de Oficiales Jor. 0.15000 $0.00 $0.00
Maestro Jor. 0.05000 $0.00 $0.00
Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00

Cuadrilla No. 72(Barretero + Ayudante "A")


Mano de obra Unidad Cantidad Salario Real Imp. Total
Barretero Jor. 1 $0.00 $0.00
Ayudante "A" Jor. 1 $0.00 $0.00
$0.00
$0.00
Mando Intermedios
Cabo de Oficiales Jor. 0.10000 $0.00 $0.00
Maestro Jor. 0.03333 $0.00 $0.00
Sub-Total $0.00
Dep. Herramienta Menor % 4% $0.00 $0.00
Total $0.00
UNIVERSIDAD DEL VAL
PR
NOMBRE DEL ESTUDIANTE:
GRUPO:
PROYECTO:
MATERIALES Y OTROS

CONCEPTO PRECIO UNITARIO UNIDAD


Cemento gris $0.00 Ton
cemento Blaco $0.00 Ton
Cemento Crest $0.00 Ton
Yeso $0.00 Ton
Grano de Marmol (marmolina) $0.00 Ton
SIKALITE $0.00 kg
Arena #5 $0.00 M3
Arena #4 $0.00 M3
Agua $0.00 M3
Grava 3/4 $0.00 M3

Gasolina Magna $0.00 Lt


Gasolina Premium $0.00 Lt
Diesel $0.00 Lt
Lubricante $0.00 Lt

Taza de Interes 0.00%

Alambre recocido # 16 $0.00 kg.


Clavo 3/4", 2 1/2", y 4" $0.00 kg.
Malla electrosoldada 6-6/10-10 $0.00 kg.
Alambron 1/4" (2) F'y= 3000 Kg/cm2 $0.00 ton.
Varilla 5/16" (2.5) $0.00 ton.
Varilla 3/8" (3) $0.00 ton.
Varilla 1/2" (4) $0.00 ton.
Varilla 5/8" (5) $0.00 ton.
Varilla 3/4" (6) $0.00 ton.
Varilla 1" (8) $0.00 ton.
Varilla 1 1/4" (10) $0.00 ton.
Varilla 1 1/2" (12) $0.00 ton.
NIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
SEMESTRE:
DIRECCIÓN:

Costo de
Material Unidad proveedor Costo del flete
Cemento gris Ton $0.00 $0.00
cemento Blaco Ton $0.00 $0.00
Cemento Crest Ton $0.00 $0.00
Yeso Ton $0.00 $0.00
Grano de Marmol (marmolina) Ton $0.00 $0.00
SIKALITE kg $0.00 $0.00
Arena #5 M3 $0.00 $0.00
Arena #4 M3 $0.00 $0.00
Agua M3 $0.00 $0.00
Grava 3/4 M3 $0.00 $0.00

Gasolina Magna Lt $0.00 $0.00


Gasolina Premium Lt $0.00 $0.00
Diesel Lt $0.00 $0.00
Lubricante Lt $0.00 $0.00

Alambre recocido # 16 kg. $0.00 $0.00


Clavo 3/4", 2 1/2", y 4" kg. $0.00 $0.00
Malla electrosoldada 6-6/10-10 kg. $0.00 $0.00
Alambron 1/4" (2) F'y= 3000 Kg/cm2 ton. $0.00 $0.00
Varilla 5/16" (2.5) ton. $0.00 $0.00
Varilla 3/8" (3) ton. $0.00 $0.00
Varilla 1/2" (4) ton. $0.00 $0.00
Varilla 5/8" (5) ton. $0.00 $0.00
Varilla 3/4" (6) ton. $0.00 $0.00
Varilla 1" (8) ton. $0.00 $0.00
Varilla 1 1/4" (10) ton. $0.00 $0.00
Varilla 1 1/2" (12) ton. $0.00 $0.00
CICLO ESCOLAR I -2019

Costo de Costo de Costo real


acarreos mermsas de material
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00

$0.00 $0.00 $0.00


$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00

$0.00 $0.00 $0.00


$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALP
PRESUPUESTOS
ESTUDIANTE:
GRUPO: SEMESTRE:
PROYECTO: DIRECCIÓN:

DESCRIPCION: CAMION PETROLIZADORA,MARCA FORD ,MODELO 48-826,INCLUYE EQUIPO CON


PETROLIZADORA SEAMANN-GUNISSON

precio de (Pa)= 745800 horas trabajadas(Ha)= 1680 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 122.8 lubricante (aL)=
adicional
valor de (Vn)= 13800 potencia (Hp)= 61.400 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 724000 salario (So)CUA=47 244.3 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 149160 combustible (c) = 0.1514 prima anual (S)=
rescate de seguro
vida economica (Ve)= 8400 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 1800 capacidad de (C) = 7 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION:
REVOLVEDORA DE GASOLINA MARCA KOHLER ,MODELO K-181 DE 8 H.P.

precio de (Pa)= 13000 horas trabajadas(Ha)= 1400 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 8 lubricante (aL)=
adicional
valor de (Vn)= 0 potencia (Hp)= 6.000 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 13000 salario (So)CUA =39 96.448 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 11700 combustible (c) = 0.2271 prima anual (S)=
rescate de seguro
vida economica (Ve)= 4200 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 1 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: VIBRADOR DE AGUJA PARA CONCRETO MARCA MECSA MODELO K-8 MOTOR DE GASOLINA KOHLER
K-181 ,8 H.P. 3600 RPM

precio de (Pa)= 9900 horas trabajadas(Ha)= 1475 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 4 lubricante (aL)=
adicional
valor de (Vn)= 0 potencial (Hp)= 3.000 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 9900 salario (So)CUA=9 105.336 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 8910 combustible (c) = 0.2271 prima anual (S)=
rescate de seguro
vida economica (Ve)= 4425 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 1.7 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: MALACATE MARCA MECSA ,MODELO M -1000 1 TONELADA DE CAPACIDAD
MOTOR DE GASOLINA WISCONSIN S14D-R DE 14 H.P. 3600 RPM.

precio de (Pa)= 6900 horas trabajadas(Ha)= 1600 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 12.5 lubricante (aL)=
adicional
valor de (Vn)= 0 potencial (Hp)= 9.380 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 6900 salario (So)CUA=39 96.448 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 6210 combustible (c) = 0.2271 prima anual (S)=
rescate de seguro
vida economica (Ve)= 4800 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 2.7 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: PLUMA PARA MALACATE DE 1 TONELADA DE CAPACIDAD COMPLETA

precio de (Pa)= 5300 horas trabajadas(Ha)= 1600 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 0 lubricante (aL)=
adicional
valor de (Vn)= 0 potencial (Hp)= 0.000 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 5300 salario (So)CUA=9 105.336 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 0 combustible (c) = 0 prima anual (S)=
rescate de seguro
vida economica (Ve)= 8000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 0 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: CAMION DE VOLTEO MARCA FORD ,MOTOR DIESEL DE 170 H.P. ,8M3 DE CAPACIDAD

precio de (Pa)= 489000 horas trabajadas(Ha)= 1700 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 122.8 lubricante (aL)=
adicional
valor de (Vn)= 13800 potencial (Hp)= 61.400 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 474800 salario (So)CUA=46 230.599 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 97800 combustible (c) = 0.1514 prima anual (S)=
rescate de seguro
vida economica (Ve)= 8500 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 1800 capacidad de (C) = 6.6 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: CAMION PIPA MARCA FORD ,MOTOR DIESEL DE 170 H.P.INCLUYE TANQUE DE
10000 LITROS DE CAPACIDAD.

precio de (Pa)= 469000 horas trabajadas(Ha)= 1700 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 122.8 lubricante (aL)=
adicional
valor de (Vn)= 13800 potencial (Hp)= 61.400 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 455400 salario (So)CUA=46 230.599 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 93800 combustible (c) = 0.1514 prima anual (S)=
rescate de seguro
vida economica (Ve)= 8500 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 1800 capacidad de (C) = 7.5 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: MOTONIVELADORA CATERPILLAR ,MODELO 120 B ,MONTADO SOBRE BASTIDOR
DE LLANTAS ,MOTOR DIESEL DE 125 H.P.

precio de (Pa)= 1367800 horas trabajadas(Ha)= 2000 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 125 lubricante (aL)=
adicional
valor de (Vn)= 135000 potencial (Hp)= 93.750 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 1282300 salario (So)CUA=45 252.673 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 205100 combustible (c) = 0.1514 prima anual (S)=
rescate de seguro
vida economica (Ve)= 10000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 1000 capacidad de (C) = 27 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: APLANADORA MARCA COPACTO - HUMBER MODELO CT - 1014 DE 10 A 14
TONELADAS,DE RODILLOS ,MOTOR DE 73 H.P.

precio de (Pa)= 643700 horas trabajadas(Ha)= 2000 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 73 lubricante (aL)=
adicional
valor de (Vn)= 0 potencial (Hp)= 54.750 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 643700 salario (So)CUA=45 252.673 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 128750 combustible (c) = 0.1514 prima anual (S)=
rescate de seguro
vida economica (Ve)= 10000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 12 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: PAVIMENTADORA BARBER GREEN MODELO BG -220 ,MOTOR JOHN DEERE ,78 HP.
REGLA MAESTRA 2.44 M. ANCHO BASICO 3.05

precio de (Pa)= 1282300 horas trabajadas(Ha)= 1500 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 81 lubricante (aL)=
adicional
valor de (Vn)= 0 potencial (Hp)= 60.750 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 1282300 salario (So)CUA=45 252.673 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 256400 combustible (c) = 0.1514 prima anual (S)=
rescate de seguro
vida economica (Ve)= 6000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 19 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: RETROEXCAVADORA HIDRAULICA CASE MODELO 580 H, MOTOR DIESEL PERKINS
4,236 ,73 HP. ,2200 RPM

precio de (Pa)= 554100 horas trabajadas(Ha)= 2000 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 73 lubricante (aL)=
adicional
valor de (Vn)= 27800 potencia (Hp)= 54.750 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 527700 salario (So)CUA=44 239.431 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 110800 combustible (c) = 0.1514 prima anual (S)=
rescate de seguro
vida economica (Ve)= 14000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 1000 capacidad de (C) = 8 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION:NIVEL NATIONAL ,MODELO DUMPY(EQUIPO PARA MEDICION )

precio de (Pa)= 8300 horas trabajadas(Ha)= 1400 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 0 lubricante (aL)=
adicional
valor de (Vn)= 0 potencia (Hp)= 0.000 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 8300 salario (So)CUA=48 540.815 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 1660 combustible (c) = 0 prima anual (S)=
rescate de seguro
vida economica (Ve)= 14000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 0 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: TRANSITO NATIONAL K-E ,CHS (EQUIPO PARA MEDICION )

precio de (Pa)= 17800 horas trabajadas(Ha)= 1400 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 0 lubricante (aL)=
adicional
valor de (Vn)= 0 potencia (Hp)= 0.000 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 17800 salario (So)CUA=48 540.815 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 3560 combustible (c) = 0 prima anual (S)=
rescate de seguro
vida economica (Ve)= 14000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 0 capacidad de (C) = 0 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 5.89


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
DESCRIPCION: CARRETILLA DE VOLTEO BUGGY ,MODELO JPR -175 , 160 LITROS DE CAPACIDAD ,
MONTADA SOBRE NEUMATICOS

precio de (Pa)= 2580 horas trabajadas(Ha)= 2000 Cambio (T)=


adquisicion al año de lubricante
equipo (Ea)= 0 potencia (j)= 0 lubricante (aL)=
adicional
valor de (Vn)= 520 potencia (Hp)= 0.000 precio del (Pl)=
llantas del equipo lubricante
valor (Va)= 2060 salario (So)CUA=1 91.805 tasa de interes (i)=
inicial de operación anual
valor de (Vr)= 0 combustible (c) = 0 prima anual (S)=
rescate de seguro
vida economica (Ve)= 2000 precio de (Pc)= 0 factor de (Q)=
de maquinaria combustible mantenimiento
vida economica (Hv)= 1000 capacidad de (C) = 0 factor de (Fo)=
de llantas carter operacion
Procedimiento de Calculo

Depreciacion = (13000 - 11700) + 4200 =


Cargos Intereres = [(13000 + 11700) + 2 (Ha) ] i
fijos Seguro = (13000 - 11700) + 2 (s+ha) =
Mantenimiento = 0.8 68.43 =
SUMA =

cargos por combustible 0.2271 6 0


cargos de cargos por lubricante c/t (pl) +(al)(hp)(pl)
consumo cargos por llantas vn /hv 0
SUMA =

cargos por so/ha *286.5 SUMA =


operación
costo total hora equipo TOTAL
CO CAMPUS TLALPAN
OS
CICLO ESCOLAR I -2019

O CON

200

0.00358

0.00%

0.01

0.8

0.5

68.43
0.00
2.60
54.75
125.78

0.00
0.000
7.67
7.67

41.63

175.07
50

0.00307

0.00%

0.01

0.9

0.75

0.31
0.00
0.09
0.28
0.68

0.00
0.000
0.00
0.00

19.72

20.40
SOLINA KOHLER

50

0.00307

0.00%

0.01

0.9

0.75

0.22
0.00
0.06
0.20
0.49

0.00
0.000
0.00
0.00

20.44

20.93
DAD

50

0.00307

0.00%

0.01

0.8

0.75

0.14
0.00
0.04
0.12
0.30

0.00
0.000
0.00
0.00

17.26

17.55
A

0.00307

0.00%

0.01

0.75

0.66
0.00
0.02
0.66
1.34

0.00
0.000
0.00
0.00

18.85

20.19
PACIDAD

200

0.00358

0.00%

0.01

0.8

0.5

44.35
0.00
1.68
35.48
81.52

0.00
0.000
7.67
7.67

38.83

128.01
E DE

200

0.00358

0.00%

0.01

0.8

0.5

42.54
0.00
1.62
34.03
78.19

0.00
0.000
7.67
7.67

38.83

124.68
IDOR

200

0.00358

0.00%

0.01

0.8

0.75

107.72
0.00
3.72
86.18
197.61

0.00
0.000
135.00
135.00

36.16

368.78
14

200

0.00307

0.00%

0.01

0.8

0.75

51.50
0.00
1.93
41.20
94.62

0.00
0.000
0.00
0.00

36.16

130.79
,78 HP.

200

0.00307

0.00%

0.01

0.8

0.75

170.98
0.00
5.13
136.79
312.90

0.00
0.000
0.00
0.00

48.22

361.12
ERKINS

200

0.00307

0.00%

0.01

0.8

0.75

29.78
0.00
1.60
23.82
55.20

0.00
0.000
27.80
27.80

34.27

117.27
0

0.00307

0.00%

0.01

0.8

0.9

0.47
0.00
0.04
0.38
0.89

0.00
0.000
0.00
0.00

110.58

111.47
0

0.00307

0.00%

0.01

0.8

0.9

1.02
0.00
0.08
0.81
1.91

0.00
0.000
0.00
0.00

110.58

112.48
ACIDAD ,

0.00307

0.3972

0.01

0.75

1.03
0.20
0.01
1.03
2.27

0.00
0.000
0.52
0.52

13.14

13.14
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
STUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:

Mortero cemento-arena 1:2 Mortero cemento-arena 1:6


Mano de obra Unid. Cant. P.U. Importe Mano de obra Unid. Cant. P.U. Importe
Cemento gris(0.605+5%) Ton. 0.63525 $0.00 $0.00 Cemento gris(0.298+5%) Ton. 0.31290 $0.00 $0.00
Arena #5 (1.004+10%) m3 1.10440 $0.00 $0.00 Arena #4 (1.184+10%) m3 1.30240 $0.00 $0.00
Agua (0.276+20%) m3 0.3312 $0.00 $0.00 Agua (0.259+20%) m3 0.3108 $0.00 $0.00

SUB-TOTAL $0.00 SUB-TOTAL $0.00


Mano de obra y equipo Mano de obra y equipo

SUB-TOTAL SUB-TOTAL
TOTAL $0.00 TOTAL $0.00

Mortero cemento-arena 1:3 Mortero cemento-arena 1:7


Mano de obra Unid. Cant. P.U. Importe Mano de obra Unid. Cant. P.U. Importe
Cemento gris(0.496+5%) Ton. 0.52080 $0.00 $0.00 Cemento gris(0.248+5%) Ton. 0.26040 $0.00 $0.00
Arena #4 (1.104+10%) m3 1.21440 $0.00 $0.00 Arena #4 (1.265+10%) m3 1.39150 $0.00 $0.00
Agua (0.271+20%) m3 0.3252 $0.00 $0.00 Agua (0.252+20%) m3 0.3024 $0.00 $0.00

SUB-TOTAL $0.00 SUB-TOTAL $0.00


Mano de obra y equipo Mano de obra y equipo

SUB-TOTAL SUB-TOTAL
TOTAL $0.00 TOTAL $0.00

Mortero cemento-arena 1:4 Mortero cemento-arena 1:8


Mano de obra Unid. Cant. P.U. Importe Mano de obra Unid. Cant. P.U. Importe
Cemento gris(0.421+5%) Ton. 0.44205 $0.00 $0.00 Cemento gris(0.209+5%) Ton. 0.21945 $0.00 $0.00
Arena #4 (1.129+10%) m3 1.24190 $0.00 $0.00 Arena #4 (1.305+10%) m3 1.43550 $0.00 $0.00
Agua (0.268+20%) m3 0.3216 $0.00 $0.00 Agua (0.247+20%) m3 0.2964 $0.00 $0.00

SUB-TOTAL $0.00 SUB-TOTAL $0.00


Mano de obra y equipo Mano de obra y equipo

SUB-TOTAL SUB-TOTAL
TOTAL $0.00 TOTAL $0.00

Mortero cemento-arena 1:5 Mortero yeso-agua


Mano de obra Unid. Cant. P.U. Importe Mano de obra Unid. Cant. P.U. Importe
Cemento gris(0.351+5%) Ton. 0.36855 $0.00 $0.00 Yeso (0.682+5%) Ton. 0.71610 $0.00 $0.00
Arena #4 (1.154+10%) m3 1.26940 $0.00 $0.00 Agua (0.451+20%) m3 0.54120 $0.00 $0.00
Agua (0.261+20%) m3 0.3132 $0.00 $0.00

SUB-TOTAL $0.00 SUB-TOTAL $0.00


Mano de obra y equipo Mano de obra y equipo

SUB-TOTAL SUB-TOTAL
TOTAL $0.00 TOTAL $0.00

Mortero yeso-arena-agua Lechada cemento gris-agua


Mano de obra Unid. Cant. P.U. Importe Mano de obra Unid. Cant. P.U. Importe
Yeso (0.433+5%) Ton. 0.45465 $0.00 $0.00 Cemento gris(1.305+5%) Ton. 1.37025 $0.00 $0.00
Arena #5 (0.539+10%) m3 0.59290 $0.00 $0.00 Agua (0.988+20%) m3 1.18560 $0.00 $0.00
Agua (0.290+20%) m3 0.348 $0.00 $0.00

SUB-TOTAL $0.00 SUB-TOTAL $0.00


Mano de obra y equipo Mano de obra y equipo

SUB-TOTAL SUB-TOTAL
TOTAL $0.00 TOTAL $0.00

Pasta cemento blanco-cemento crest-marmolina Lechada cemento blanco-agua


Mano de obra Unid. Cant. P.U. Importe Mano de obra Unid. Cant. P.U. Importe
Cemento bla (0.322+5%) Ton. 0.33810 $0.00 $0.00 Cemento bla (1.305+5%) Ton. 1.37025 $0.00 $0.00
Cemento cres(0.107+5%) Ton. 0.11235 $0.00 $0.00 Agua (0.988+20%) m3 1.18560 $0.00 $0.00
Marmolina (1.194+10%) Ton. 1.3134 $0.00 $0.00
Agua (0.507+20%) m3 0.6084 $0.00 $0.00
SUB-TOTAL $0.00 SUB-TOTAL $0.00
Mano de obra y equipo Mano de obra y equipo

SUB-TOTAL SUB-TOTAL
TOTAL $0.00 TOTAL $0.00
Pasta cemento gris-agua
Mano de obra Unid. Cant. P.U. Importe
Cemento gris(2.008+5%) Ton. 2.10840 $0.00 $0.00
Agua (0.953+20%) m3 1.1436 $0.00 $0.00

SUB-TOTAL $0.00
Mano de obra y equipo

SUB-TOTAL
TOTAL $0.00

Pasta cemento blanco-agua


Mano de obra Unid. Cant. P.U. Importe
Cemento bla (2.008+5%) Ton. 2.10840 $0.00 $0.00
Agua (0.953+20%) m3 1.1436 $0.00 $0.00

SUB-TOTAL $0.00
Mano de obra y equipo

SUB-TOTAL
TOTAL $0.00
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALP
PRESUPUESTOS
NOMBRE DEL ESTUDIANTE:
GRUPO: SEMESTRE:
PROYECTO: DIRECCIÓN:

Concreto f´c=100 kg/cm2, con resistencia normal Concreto f´c=200 kg/cm2, con resistencia normal
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx. 3/4", fabricado en obra c/revolvedora 1 saco
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.267+5%) Ton. 0.28 $0.00 $0.00 Cemento gris (0.359+5%) Ton 0.38 $0.00
Arena #4 (0.509+10%) m3 0.56 $0.00 $0.00 Arena #4 (0.498+10%) m3 0.55 $0.00
Grava #3/4 (0.616+10%) m3 0.68 $0.00 $0.00 Grava 3/4" (0.603+10%) m3 0.66 $0.00
Agua (0.217+20%) m3 0.26 $0.00 $0.00 Agua (0.202+20%) m3 0.24 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00
Revolvedora (8/13) Hr. 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL

Concreto f´c=125 kg/cm2, con resistencia normal Concreto f´c=225 kg/cm2, con resistencia normal
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.293+5%) Ton 0.31 $0.00 $0.00 Cemento gris (0.380+5%) Ton 0.40 $0.00
Arena #4 (0.506+10%) m3 0.56 $0.00 $0.00 Arena #4 (0.500+10%) m3 0.55 $0.00
Grava #3/4 (0.613+10%) m3 0.67 $0.00 $0.00 Grava #3/4 (0.600+10%) m3 0.66 $0.00
Agua (0.214+20%) m3 0.26 $0.00 $0.00 Agua (0.198+20%) m3 0.24 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00
Revolvedora (8/13) Hr. 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr. 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL

Concreto f´c=150 kg/cm2, con resistencia normal Concreto f´c=250 kg/cm2, con resistencia normal
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.318+5%) Ton 0.33 $0.00 $0.00 Cemento gris (0.401+5%) Ton 0.42 $0.00
Arena #4 (0.503+10%) m3 0.55 $0.00 $0.00 Arena #4 (0.502+10%) m3 0.55 $0.00
Grava #3/4 (0.610+10%) m3 0.67 $0.00 $0.00 Grava #3/4 (0.598+10%) m3 0.66 $0.00
Agua (0.211+20%) m3 0.25 $0.00 $0.00 Agua (0.195+20%) m3 0.23 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00
Revolvedora (8/13) Hr. 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr. 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL

Concreto f´c=175 kg/cm2, con resistencia normal Concreto f´c=275 kg/cm2, con resistencia normal
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.338+5%) Ton 0.35 $0.00 $0.00 Cemento gris (0.416+5%) Ton 0.44 $0.00
Arena #4 (0.500+10%) m3 0.55 $0.00 $0.00 Arena #4 (0.504+10%) m3 0.55 $0.00
Grava #3/4 (0.606+10%) m3 0.67 $0.00 $0.00 Grava #3/4 (0.606+10%) m3 0.67 $0.00
Agua (0.206+20%) m3 0.25 $0.00 $0.00 Agua (0.195+20%) m3 0.23 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00
Revolvedora (8/13) Hr. 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr. 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL
Concreto f´c=300 kg/cm2, con resistencia normal
máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe
Cemento gris (0.431+5%) Ton 0.45 $0.00 $0.00
Arena #4 (0.507+10%) m3 0.56 $0.00 $0.00
Grava #3/4 (0.614+10%) m3 0.68 $0.00 $0.00
Agua (0.196+20%) m3 0.24 $0.00 $0.00

SUB-TOTAL $0.00
Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor. 0.07692 $0.00 $0.00
Revolvedora (8/13) Hr. 0.61538 $20.40 $12.55
SUB-TOTAL $12.55
TOTAL $12.55
MÉXICO CAMPUS TLALPAN
UESTOS
CICLO ESCOLAR I -2019

mal
aco
Importe
$0.00
$0.00
$0.00
$0.00

$0.00

$0.00
$12.55
$12.55
$12.55

mal
aco.
Importe
$0.00
$0.00
$0.00
$0.00

$0.00

$0.00
$12.55
$12.55
$12.55

mal
aco.
Importe
$0.00
$0.00
$0.00
$0.00

$0.00

$0.00
$12.55
$12.55
$12.55

mal
aco.
Importe
$0.00
$0.00
$0.00
$0.00

$0.00

$0.00
$12.55
$12.55
$12.55
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
STUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:

Concreto f´c=100 kg/cm2, con Imp. integral agr. Concreto f´c=200 kg/cm2, con Imp. integral, agr.
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx. 3/4", fabricado en obra c/revolvedora 1 saco
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.267+5%) Ton 0.28 $0.00 $0.00 Cemento gris (0.359+5%) Ton 0.38 $0.00
Arena #4 (0.509+10%) m3 0.56 $0.00 $0.00 Arena #4 (0.498+10%) m3 0.55 $0.00
Grava #3/4 (0.616+10%) m3 0.68 $0.00 $0.00 Grava 3/4" (0.603+10%) m3 0.66 $0.00
Agua (0.217+20%) m3 0.26 $0.00 $0.00 Agua (0.202+20%) m3 0.24 $0.00
Sikalite (3.204+5%) kg 3.36 $0.00 $0.00 Sikalite (4.308+5%) kg 4.52 $0.00
SUB-TOTAL $0.00 SUB-TOTAL
Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00
Revolvedora (8/13) Hr 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL

Concreto f´c=125 kg/cm2, con Imp. Integral, agr. Concreto f´c=225 kg/cm2, con Imp. Integral, agr.
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.293+5%) Ton 0.31 $0.00 $0.00 Cemento gris (0.380+5%) Ton 0.40 $0.00
Arena #4 (0.506+10%) m3 0.56 $0.00 $0.00 Arena #4 (0.500+10%) m3 0.55 $0.00
Grava #3/4 (0.613+10%) m3 0.67 $0.00 $0.00 Grava #3/4 (0.600+10%) m3 0.66 $0.00
Agua (0.214+20%) m3 0.26 $0.00 $0.00 Agua (0.198+20%) m3 0.24 $0.00
Sikalite (3.516+5%) kg 3.69 $0.00 $0.00 Sikalite (4.560+5%) kg 4.79 $0.00
SUB-TOTAL $0.00 SUB-TOTAL
Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00
Revolvedora (8/13) Hr 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL

Concreto f´c=150 kg/cm2, con Imp. Integral, agr. Concreto f´c=250 kg/cm2, con Imp. Integral, agr.
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.318+5%) Ton 0.33 $0.00 $0.00 Cemento gris (0.401+5%) Ton 0.42 $0.00
Arena #4 (0.503+10%) m3 0.55 $0.00 $0.00 Arena #4 (0.502+10%) m3 0.55 $0.00
Grava #3/4 (0.610+10%) m3 0.67 $0.00 $0.00 Grava #3/4 (0.598+10%) m3 0.66 $0.00
Agua (0.211+20%) m3 0.25 $0.00 $0.00 Agua (0.195+20%) m3 0.23 $0.00
Sikalite (3.816+5%) kg 4.01 $0.00 $0.00 Sikalite (4.812+5%) kg 5.05 $0.00
SUB-TOTAL $0.00 SUB-TOTAL
Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00
Revolvedora (8/13) Hr 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL

Concreto f´c=175 kg/cm2, con Imp. Integral, agr. Concreto f´c=275 kg/cm2, con Imp. Integral, agr.
máx.3/4", fabricado en obra c/revolvedora 1 saco. máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Cemento gris (0.338+5%) Ton 0.35 $0.00 $0.00 Cemento gris (0.416+5%) Ton 0.44 $0.00
Arena #4 (0.500+10%) m3 0.55 $0.00 $0.00 Arena #4 (0.504+10%) m3 0.55 $0.00
Grava #3/4 (0.606+10%) m3 0.67 $0.00 $0.00 Grava #3/4 (0.606+10%) m3 0.67 $0.00
Agua (0.206+20%) m3 0.25 $0.00 $0.00 Agua (0.195+20%) m3 0.23 $0.00
Sikalite (4.056+5%) kg 4.26 $0.00 $0.00 Sikalite (4.992+5%) kg 5.24 $0.00
SUB-TOTAL $0.00 SUB-TOTAL
Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00 $0.00 Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00
Revolvedora (8/13) Hr 0.61538 $20.40 $12.55 Revolvedora (8/13) Hr 0.61538 $20.40
SUB-TOTAL $12.55 SUB-TOTAL
TOTAL $12.55 TOTAL
Concreto f´c=300 kg/cm2, con Imp. Integral, agr.
máx.3/4", fabricado en obra c/revolvedora 1 saco.
Material Unid. Cant. P.U. Importe
Cemento gris (0.431+5%) Ton 0.45 $0.00 $0.00
Arena #4 (0.507+10%) m3 0.56 $0.00 $0.00
Grava #3/4 (0.614+10%) m3 0.68 $0.00 $0.00
Agua (0.196+20%) m3 0.24 $0.00 $0.00
Sikalite (5.172+5%) kg 5.43 $0.00 $0.00
SUB-TOTAL $0.00
Mano de obra y equipo
Cuadrilla No. 4 (1/13) Jor 0.07692 $0.00 $0.00
Revolvedora (8/13) Hr 0.61538 $20.40 $12.55
SUB-TOTAL $12.55
TOTAL $12.55
I -2019

gr.
aco
Importe
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$12.55
$12.55
$12.55

gr.
aco.
Importe
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$12.55
$12.55
$12.55

gr.
aco.
Importe
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$12.55
$12.55
$12.55

gr.
aco.
Importe
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$12.55
$12.55
$12.55
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
ESTUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:

COLADO DE COLADO DE
Concreto f´c=100 kg/cm2, con resistencia normal con agr. Concreto f´c=200 kg/cm2, con resistencia normal con agr.
máx.3/4", vaciado con carretillas y botes en elems. de cim. máx.3/4", vaciado con carretillas y botes en elems. de cim.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=100kg/ (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=200k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL

COLADO DE COLADO DE
Concreto f´c=125 kg/cm2, con resistencia normal con agr. Concreto f´c=225 kg/cm2, con resistencia normal con agr.
máx.3/4", vaciado con carretillas y botes en elems. de cim. máx.3/4", vaciado con carretillas y botes en elems. de cim.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=125kg/ (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=225k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL

COLADO DE COLADO DE
Concreto f´c=150 kg/cm2, con resistencia normal con agr. Concreto f´c=250 kg/cm2, con resistencia normal con agr.
máx.3/4", vaciado con carretillas y botes en elems. de cim. máx.3/4", vaciado con carretillas y botes en elems. de cim.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=150kg/ (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=250k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL

COLADO DE COLADO DE
Concreto f´c=175 kg/cm2, con resistencia normal con agr. Concreto f´c=275 kg/cm2, con resistencia normal con agr.
máx.3/4", vaciado con carretillas y botes en elems. de cim. máx.3/4", vaciado con carretillas y botes en elems. de cim.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=175kg/ (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=275k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL
COLADO DE
Concreto f´c=300 kg/cm2, con resistencia normal con agr.
máx.3/4", vaciado con carretillas y botes en elems. de cim.
Material Unid. Cant. P.U. Importe
Conc.f´c=300kg/ (1.00+5%) m3 1.05 $12.55 $13.18
Agua (0.800+20%) m3 0.96 $0.00 $0.00

SUB-TOTAL $13.18
Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47
SUB-TOTAL $10.47
TOTAL $23.64
I -2019

on agr.
de cim.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64

on agr.
de cim.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64

on agr.
de cim.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64

on agr.
de cim.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
STUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:
Colado de Concreto con Impermeabilizacion Integral en elementos de Cimentacion

Colado de Concreto f´c=100 kg/cm2, con Imp. integral en elem. De Cimentacion Colado de Concreto f´c=200 kg/cm2, con Imp. integral en elem. De Cimentacion
Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=100k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=200k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL

Colado de Concreto f´c=125 kg/cm2, con Imp. integral en elem. De Cimentacion Colado de Concreto f´c=225 kg/cm2, con Imp. integral en elem. De Cimentacion
Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=125k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=225k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL

Colado de Concreto f´c=150 kg/cm2, con Imp. integral en elem. De Cimentacion Colado de Concreto f´c=250 kg/cm2, con Imp. integral en elem. De Cimentacion
Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=150k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=250k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL

Colado de Concreto f´c=175 kg/cm2, con Imp. integral en elem. De Cimentacion Colado de Concreto f´c=275 kg/cm2, con Imp. integral en elem. De Cimentacion
Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=175k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=275k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00 Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47 Vibrador (4/8) Hr. 0.50000 $20.93
SUB-TOTAL $10.47 SUB-TOTAL
TOTAL $23.64 TOTAL
Colado de Concreto f´c=300 kg/cm2, con Imp. integral en elem. De Cimentacion
Agregado máx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado
Material Unid. Cant. P.U. Importe
Conc.f´c=300k (1.00+5%) m3 1.05 $12.55 $13.18
Agua (0.800+20%) m3 0.96 $0.00 $0.00

SUB-TOTAL $13.18
Mano de obra y equipo
Cuadrilla No. 49 (1/8) Jor. 0.12500 $0.00 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.23500 $0.00 $0.00
Vibrador (4/8) Hr. 0.50000 $20.93 $10.47
SUB-TOTAL $10.47
TOTAL $23.64
I -2019

gral en elem. De Cimentacion


s. Incluye vibrado y curado
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64

gral en elem. De Cimentacion


s. Incluye vibrado y curado
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64

gral en elem. De Cimentacion


s. Incluye vibrado y curado
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64

gral en elem. De Cimentacion


s. Incluye vibrado y curado
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$10.47
$10.47
$23.64
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
STUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:
COLADO DE COLADO DE
Concreto f´c=100 kg/cm2, con Resistencia normal, agr. Concreto f´c=200 kg/cm2, con Resistencia normal, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=100k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=200k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL

COLADO DE COLADO DE
Concreto f´c=125 kg/cm2, con Resistencia normal, agr. Concreto f´c=225 kg/cm2, con Resistencia normal, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=125k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=225k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL

COLADO DE COLADO DE
Concreto f´c=150 kg/cm2, con Resistencia normal, agr. Concreto f´c=250 kg/cm2, con Resistencia normal, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=150k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=250k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL

COLADO DE COLADO DE
Concreto f´c=175 kg/cm2, con Resistencia normal, agr. Concreto f´c=275 kg/cm2, con Resistencia normal, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=175k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=275k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL
COLADO DE
Concreto f´c=300 kg/cm2, con Resistencia normal, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe
Conc.f´c=300k (1.00+5%) m3 1.05 $12.55 $13.18
Agua (0.800+20%) m3 0.96 $0.00 $0.00

SUB-TOTAL $13.18
Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74
SUB-TOTAL $16.74
TOTAL $29.92
I -2019

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
STUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:
COLADO DE COLADO DE
Concreto f´c=100 kg/cm2, con Impermea. Integral, agr. Concreto f´c=200 kg/cm2, con Impermea. Integral, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=100k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=200k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL

COLADO DE COLADO DE
Concreto f´c=125 kg/cm2, con Impermea. Integral, agr. Concreto f´c=225 kg/cm2, con Impermea. Integral, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=125k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=225k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL

COLADO DE COLADO DE
Concreto f´c=150 kg/cm2, con Impermea. Integral, agr. Concreto f´c=250 kg/cm2, con Impermea. Integral, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=150k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=250k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL

COLADO DE COLADO DE
Concreto f´c=175 kg/cm2, con Impermea. Integral, agr. Concreto f´c=275 kg/cm2, con Impermea. Integral, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural. máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Conc.f´c=175k (1.00+5%) m3 1.05 $12.55 $13.18 Conc.f´c=275k (1.00+5%) m3 1.05 $12.55
Agua (0.800+20%) m3 0.96 $0.00 $0.00 Agua (0.800+20%) m3 0.96 $0.00

SUB-TOTAL $13.18 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00 Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00 Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74 Vibrador (4/5) Hr. 0.8000 $20.93
SUB-TOTAL $16.74 SUB-TOTAL
TOTAL $29.92 TOTAL
COLADO DE
Concreto f´c=300 kg/cm2, con Impermea. Integral, agr.
máx.3/4", vaciado con carretillas y botes en elems. estructural.
Material Unid. Cant. P.U. Importe
Conc.f´c=300k (1.00+5%) m3 1.05 $12.55 $13.18
Agua (0.800+20%) m3 0.96 $0.00 $0.00

SUB-TOTAL $13.18
Mano de obra y equipo
Cuadrilla No. 50 (1/5) Jor. 0.2000 $0.00 $0.00
Cuadrilla No. 1(0.0235*10) Jor. 0.2350 $0.00 $0.00
Vibrador (4/5) Hr. 0.8000 $20.93 $16.74
SUB-TOTAL $16.74
TOTAL $29.92
I -2019

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92

agr.
estructural.
Importe
$13.18
$0.00

$13.18

$0.00
$0.00
$16.74
$16.74
$29.92
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
STUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
cimentacion alambron 1/4" (2) fy =3000 kg/cm2 cimentacion varilla 1/2" (4) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Alambron 1/4"n (1.00+4%) m3 1.04 $0.00 $0.00 varilla 1/2"no.4 (1.00+6%) m3 1.06 $0.00
alambre recocido (43+7%) m3 46.01 $0.00 $0.00 alambre recoci (18+7%) m3 19.26 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.15) Jor. 6.6667 $0.00 $0.00 Cuadrilla No 24 (1/0.20) Jor. 5.00000 $332.82

SUB-TOTAL $0.00 SUB-TOTAL


TOTAL $0.00 TOTAL

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
cimentacion varilla 5/16" (2.5) fy =4200 kg/cm2 cimentacion varilla 5/8" (5) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
varilla 5/16"no. (1.00+5%) m3 1.05 $0.00 $0.00 varilla 5/8"no.5 (1.00+6%) m3 1.06 $0.00
alambre recoci (28kg+7%) m3 29.96 $0.00 $0.00 alambre recoci (16+7%) m3 17.12 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.17) Jor. 5.88235 $332.82 $1,957.76 Cuadrilla No 24 (1/0.22) Jor. 4.54545 $332.82

SUB-TOTAL $1,957.76 SUB-TOTAL


TOTAL $1,957.76 TOTAL

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
cimentacion varilla 3/8" (3) fy =4200 kg/cm2 cimentacion varilla 3/4" (6) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
varilla 3/8"no.3 (1.00+6%) m3 1.06 $0.00 $0.00 varilla 3/4"no.6 (1.00+6%) m3 1.06 $0.00
alambre recoci (22+7%) m3 23.54 $0.00 $0.00 alambre recoci (10+7%) m3 10.70 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.18) Jor. 5.55556 $332.82 $1,849.00 Cuadrilla No 24 (1/0.24) Jor. 4.16667 $332.82

SUB-TOTAL $1,849.00 SUB-TOTAL


TOTAL $1,849.00 TOTAL

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
cimentacion varilla 1" (8) fy =4200 kg/cm2 cimentacion varilla 1 1/2" (12) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
varlla 1"no.8 (1.00+7%) m3 1.07 $0.00 $0.00 varlla 1 1/2 "no (1.00+7%) m3 1.07 $0.00
alambre recoci (15+7%) m3 16.05 $0.00 $0.00 alambre recoci (14+7%) m3 14.98 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.26) Jor. 3.84615 $332.82 $1,280.08 Cuadrilla No 24 (1/0.30) Jor. 3.33333 $332.82

SUB-TOTAL $1,280.08 SUB-TOTAL


TOTAL $1,280.08 TOTAL
Habilitado y armado de acero de refuerzo en elementos de
cimentacion varilla 1 1/4" (10) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe
varlla 1 1/4" no (1.00+7%) m3 1.07 $0.00 $0.00
alambre recoci (14+7%) m3 14.98 $0.00 $0.00

SUB-TOTAL $0.00
Mano de obra y equipo
Cuadrilla No 24 (1/0.28) Jor. 3.57143 $332.82 $1,188.64

SUB-TOTAL $1,188.64
TOTAL $1,188.64
I -2019

ntos de

Importe
$0.00
$0.00

$0.00

$1,664.10

$1,664.10
$1,664.10

ntos de

Importe
$0.00
$0.00

$0.00

$1,512.82

$1,512.82
$1,512.82

ntos de

Importe
$0.00
$0.00

$0.00

$1,386.75

$1,386.75
$1,386.75

ntos de

Importe
$0.00
$0.00

$0.00

$1,109.40

$1,109.40
$1,109.40
UNIVERSIDAD DEL VALLE DE MÉXICO CAMPUS TLALPAN
PRESUPUESTOS
STUDIANTE:
GRUPO: SEMESTRE: CICLO ESCOLAR I -2019
PROYECTO: DIRECCIÓN:

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
estructurales alambron 1/4" (2) fy =3000 kg/cm2 estructurales varilla 1/2" (4) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
Alambron 1/4"n (1.00+4%) m3 1.04 $0.00 $0.00 varilla 1/2"no.4 (1.00+6%) m3 1.06 $0.00
alambre recoci (43+7%) m3 46.01 $0.00 $0.00 alambre recoci (18+7%) m3 19.26 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.12) Jor. 8.33333 $0.00 $0.00 Cuadrilla No 24 (1/0.18) Jor. 5.55556 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


TOTAL $0.00 TOTAL

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
estructurales varilla 5/16" (2.5) fy =4200 kg/cm2 estructurales varilla 5/8" (5) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
varilla 5/16"no. (1.00+5%) m3 1.05 $0.00 $0.00 varilla 5/8"no.5 (1.00+6%) m3 1.06 $0.00
alambre recoci (28kg+7%) m3 29.96 $0.00 $0.00 alambre recoci (16+7%) m3 17.12 $8.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.14) Jor. 7.14286 $0.00 $0.00 Cuadrilla No 24 (1/0.20) Jor. 5.00000 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


TOTAL $0.00 TOTAL

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
estructurales varilla 3/8" (3) fy =4200 kg/cm2 estructurales varilla 3/4" (6) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
varilla 3/8"no.3 (1.00+6%) m3 1.06 $0.00 $0.00 varilla 3/4"no.6 (1.00+6%) m3 1.06 $0.00
alambre recoci (22+7%) m3 23.54 $0.00 $0.00 alambre recoci (10+7%) m3 10.70 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.16) Jor. 6.25000 $0.00 $0.00 Cuadrilla No 24 (1/0.22) Jor. 4.54545 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


TOTAL $0.00 TOTAL

Habilitado y armado de acero de refuerzo en elementos de Habilitado y armado de acero de refuerzo en elementos de
estructurales varilla 1" (8) fy =4200 kg/cm2 estructurales varilla 1 1/2" (12) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe Material Unid. Cant. P.U.
varlla 1"no.8 (1.00+7%) m3 1.07 $0.00 $0.00 varlla 1 1/2 "no (1.00+7%) m3 1.07 $0.00
alambre recoci (15+7%) m3 16.05 $0.00 $0.00 alambre recoci (14+7%) m3 14.98 $0.00

SUB-TOTAL $0.00 SUB-TOTAL


Mano de obra y equipo Mano de obra y equipo
Cuadrilla No 24 (1/0.24) Jor. 4.16667 $0.00 $0.00 Cuadrilla No 24 (1/0.28) Jor. 3.57143 $0.00
SUB-TOTAL $0.00 SUB-TOTAL
TOTAL $0.00 TOTAL

Habilitado y armado de acero de refuerzo en elementos de


estructurales varilla 1 1/4" (10) fy =4200 kg/cm2
Material Unid. Cant. P.U. Importe
varlla 1 1/4" no (1.00+7%) m3 1.07 $0.00 $0.00
alambre recoci (14+7%) m3 14.98 $0.00 $0.00

SUB-TOTAL $0.00
Mano de obra y equipo
Cuadrilla No 24 (1/0.26) Jor. 3.84615 $0.00 $0.00

SUB-TOTAL $0.00
TOTAL $0.00
I -2019

ntos de

Importe
$0.00
$0.00

$0.00

$0.00

$0.00
$0.00

ntos de

Importe
$0.00
$136.96

$136.96

$0.00

$0.00
$136.96

ntos de

Importe
$0.00
$0.00

$0.00

$0.00

$0.00
$0.00

ntos de

Importe
$0.00
$0.00

$0.00

$0.00
$0.00
$0.00

You might also like