INDIAN PLUMBING ASSOCIATION with

BVIRT ENGINEERING COLLEGE jointly


conducting WEBINAR on PLUMBING FOR
HIGH RISE BUILDING AND TIPS on
I SAVE WATER
High Rise Building

National Building Code :


Building Greater than 15 meter
height

However, in this paper we shall


address building greater than 25
meter in height; say about 8
stories or more.

6/14/2020 2
PLUMBING

 The pipes, fixtures and other apparatus inside a


building for bringing the water supply and removing
the liquid, water born wastes.

The installation of the foregoing pipes, fixtures and


other apparatus.

Plumbing is a discipline founded in hydraulics and


legal issues governed by codes and standards.

6/14/2020 3
This discipline includes, the design of hot and cold
water, rain/storm, drainage ,venting Systems,
rainwater harvesting, water reclamation, grey water,
green plumbing and so on.

An efficient plumbing system starts with a design that


saves water and energy resources. A good design
incorporates short runs between plumbing fixtures
and uses state-of-the art materials.

A plumbing design must include two systems: the


system that supplies water and the system that gets
rid of waste.

4
However, the drawback of vertical piping is the
multiple penetrations through structural slabs. Each of
these penetrations must be sealed or protected to fulfil
the requirements of building codes, in term of
protecting the building pressurization and also to
prevent vertical migration of fire and smoke.

The location of these multiple penetrations is critical


to the integrity of the structure and the function of the
fixtures even more than the aesthetics of the built
environment. Tall buildings require more robust
structures, further limiting the allowable space for
penetrations.

6/14/2020 5
Functional / Desirable Requirement
Efficient Water Supply & Drainage System

 Availability of adequate water supply at desirable


pressure of about 1.75 Kg/Sq.cm (25 PSI)

 Availability of water of desirable potable quality for


domestic use

 Efficient hot water supply & distribution installation

 High hygiene standard for Soil & Waste Disposal

 Adequately designed vent piping system

6/14/2020 6
Unacceptable Situation

 Low water pressure and surges in water


supply

 Poor quality of water

 Inadequate temperature of Hot water

 Poor soil & waste piping installation resulting


in backflow, chock-age & seepage

 Foul smell in the complex due to poor vent


design.
6/14/2020 7
Water Supply System
Design of Piping & Distribution network
depends upon:

Demand Flow

Velocity

Pressure

6/14/2020 8
Consideration for High
Rise Building
 Zoning of Water Supply & Distribution System

Building may be divided into two, three or more zones

Water supply pumping system or gravity feed system should be


independently provided for each zone

In a pumping system installation, pump duty is dependent upon


respective zone requirement

– Q - Flow : Calculation based on fixtures installed and its


probable simultaneous use

– H - Head : Static height of zone; friction loss (depending upon


6/14/2020
pipe length) & residual pressure (fixture dependent) 9
6/14/2020 10
6/14/2020 11
6/14/2020 12
6/14/2020 13
6/14/2020 14
6/14/2020 15
6/14/2020 16
6/14/2020 17
6/14/2020 18
6/14/2020 19
6/14/2020 20
6/14/2020 21
6/14/2020 22
WATER SUPPLY ZONING FOR
25 STORIED BUILDING -DWS

6/14/2020
WATER SUPPLY ZONING
FOR 25 STORIED BUILDING -FWS

24
6/14/2020 25
6/14/2020 26
6/14/2020 27
6/14/2020 28
6/14/2020 29
6/14/2020 30
6/14/2020 31
6/14/2020 32
6/14/2020 33
6/14/2020 34
6/14/2020 35
6/14/2020 36
6/14/2020 37
6/14/2020 38
6/14/2020 39
COST OF PLUMBING WORKS

TOTAL COST OF CONSTRUCTION – 100%


COST OF PLUMBING WORKS – 12 TO 15%

BREAK UP OF PLUMBING WORKS:

COST OF SANITARY FIXTURES – 40%


COST OF WATER SUPPLY PIPING – 20%
COST OF SANITARY PIPING – 20%
COST OF LABOUR – 20%
PLUMBING MATERIALS

WATER SUPPLY PIPING


PUMPS AND VALVES
SANITARY PIPING
FIXTURES
CERAMICS
BRASS / METALS
STAINLESS STEEL
PLASTIC & COMPOSITES
SYNTHETIC MATERIALS
PLUMBING PIPE MATERIALS

METAL PIPING SYSTEMS :

LEAD PIPES– THE OLDEST & OBSOLETE


IRON – GALVANISED & BLACK MS PIPES
COPPER PIPES
STAINLESS STEEL PIPES
CAST IRON PIPES
DUCTILE IRON PIPES
PLUMBING PIPE MATERIALS

PLASTIC PIPING SYSTEMS :

UPVC PIPES
CPVC PIPES
POLYETHYLENE (PE) – LIGHT, MEDIUM & HIGH DENSITY
PPR (POLYPROPYLENE WITH POLYETHYLENE AT
RANDOM)
POLYBUTYLENE (PB)
PLUMBING PIPE MATERIALS

COMPOSITE PLASTIC PIPING SYSTEMS :

PE – ALUMINIUM – PE
HDPE – ALUMINIUM – PE
PPR – ALUMINIUM
PPR - COPPER
PLUMBING PIPE MATERIALS

NON METALLIC PIPING SYSTEMS :

ASBESTOS CEMENT PIPE

CONCRETE PIPES
RCC PIPES
PSC PIPES
HUME STEEL PIPES
GALVANISED IRON PIPES

 WELDED MS TUBES, WELDED BY


ERW, HFIW OR FM PROCESS
(FRETZ MOON).
 HOT DIP GALVANISED
 PIPES – IS : 1239 PART – 1
 FITTINGS – IS : 1239 PART - 2
GI PIPES

6/14/2020 47
CPVC PIPES & FITTINGS
PPR PIPING SYSTEM
COMPOSITE PIPE - KITEC
UPVC/PVC(SWR) PIPES

6/14/2020 51
CAST IRON PIPES

6/14/2020 52
SWG PIPES

6/14/2020 53
RCC HUME PIPES

6/14/2020 54
6/14/2020 55