Professional Documents
Culture Documents
Quotation 09212018 Option 3B
Quotation 09212018 Option 3B
Quotation 09212018 Option 3B
A. BUILDING COST
ITEM NO PARTICULARS QTY UNIT U/C AMOUNT
I. PRELIMINARIES
1 Hauling of Debris 1.00 lot 28,750.00 28,750.00
2 Construction Bond 1.00 lot 52,459.00 52,459.00
3 Processing Fee 1.00 lot 2,000.00 2,000.00
4 Barangay Permit 1.00 lot 970.00 970.00
5 Worker's ID (7) 1.00 lot 700.00 700.00
V. ELECTRICAL WORKS
1 Roughing Ins, Accessories & Wires 1.00 lot 28,271.26 28,271.26
2 Electrical Devices
2.1 One Gang Switch 2.00 pc 690.00 1,380.00
2.2 Two Gang Switch 4.00 pc 690.00 2,760.00
2.3 Three Gang Switch 3.00 pc 747.50 2,242.50
2.4 Convenience Outlet 4.00 pc 747.50 2,990.00
2.5 Range Convenience Outlet 1.00 pc 1,092.50 1,092.50
2.6 Refrigerator Convenience Outlet 1.00 pc 1,092.50 1,092.50
2.7 Waterproof Convenience Outlet 4.00 pc 1,092.50 4,370.00
3 Lighting Fixtures
3.1 Pinlights 100 dia 29.00 pc 1,104.00 32,016.00
3.2 Pinlights 50 dia 6.00 pc 977.50 5,865.00
3.3 T5 Light ( Below Overhead Cabinet) 3.00 pc 747.50 2,242.50
3.4 Ordinary Pinlight 100 dia 1.00 pc 862.50 862.50
Exclusions :
1.0 Furniture
1.1 Bed
1.2 Chairs
1.3 Side Table
2.0 Accessories