Test Report: Measurement of Turns Ratio
Test Report: Measurement of Turns Ratio
Phase A Phase B
Phase C
Procedure:
1. All busbar connections were removed from the terminals of the transformer.
2. Measurement settings were verified according to the test requirements.
3. Measurement was started from the tap no 1 to no 17 and the tap was changed manually/Automatically.
4. Connection was given according to the above connection diagram.
5. Assessment was conducted & the result was recorded automatically in the CPC 100.
Report No: JTR-20003
TEST REPORT Date
Page No.
1/7/2020
6
Comments:
The transformer turns ratio test, or TTR test is hereby confirming that the transformer has the correct ratio
of primary turns to secondary turns. Above all using this test it has become possible to identify tap changer
performance, shorted turns, open windings, incorrect winding connections and other faults inside
transformers.