CBS(ROPAG) SAM PROGRAMMING DATASHEET AND GRAPHICS SYSYEM DATA

Project: _______G+ 4+ G__________


CKT#________01______________
Project Location______Meydan____ Total# of CKT’S______________
Project Job#____________ Total# of SAM’S_______________
Prepared by: ___________ Panel # &Location: __________
Signature: _____________ Area: _____________________
Contractor: _______ATC_____ Date: _______20-05-
2020______________

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 1 GF LV Room EDB-1 ELCB-1 1 1 Exit GF staircase -1 entrance Ground
2 1 GF LV Room EDB-1 ELCB-1 1 2 EM GF staircase -1 entrance Ground
2 1 GF LV Room EDB-1 ELCB-1 1 3 EM Staircase -1 down level 1st 1st floor
Floor
2 1 GF LV Room EDB-1 ELCB-1 1 4 EM Staircase -1 down level 3rd 3rd Floor
Floor
4 6 4TH Floor EDB ELCB-3 1 5 EM Staircase -1 down level 4th 4th Floor
Electric room Floor
4 6 4TH Floor EDB ELCB-3 1 6 EM Staircase -1 High level roof Roof
Electric room

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)

CBS(ROPAG) SAM PROGRAMMING DATASHEET AND GRAPHICS SYSYEM DATA

Project: _________________ CKT#_________02_____________


Project Location__________ Total# of CKT’S______________
Project Job#____________ Total# of SAM’S_______________
Prepared by: ___________ Panel # &Location: __________
Signature: _____________ Area: _____________________
Contractor: ____________ Date: _____________________

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, MCCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
INCOMER)
1 3 GF LV Room EDB-1 ELCB-2 2 1 EM GF staircase -1 UP level Ground
1 3 GF LV Room EDB-1 ELCB-2 2 2 EM Staircase -1 -1st Floor level 1st Floor
1 3 GF LV Room EDB-1 ELCB-2 2 3 EM Staircase -1 down level 2nd 2nd floor
Floor
1 3 GF LV Room EDB-1 ELCB-2 2 4 EM Staircase -1 -2nd Floor level 2nd Floor
1 3 GF LV Room EDB-1 ELCB-2 2 5 EM Staircase -1 -3rd Floor level 3rd Floor
4 6 4TH Floor EDB ELCB-3 2 6 EM Staircase -1 -4th Floor level 4th Floor
Electric room
4 6 4TH Floor EDB ELCB-3 2 7 EM Staircase -1 roof level Roof

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, MCCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
INCOMER)
Electric room

CKT- 3
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 4 GF LV Room EDB-1 ELCB-3 3 1 EM GF Generator Room Ground Floor
2 3 GF LV Room EDB-1 ELCB-2 3 2 EM GF Security Room Ground Floor
2 3 GF LV Room EDB-1 ELCB-3 3 3 EM GF Telephone Room Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 3 4 EM GF Garbage Room Near Ground Floor
Staircase -1
2 5 GF LV Room DB-GN ELCB-3 3 5 EM GF near parking 52 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 6 EM GF near parking 55 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 7 EM GF near parking 57 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 8 EXIT GF near parking 58 Ground Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 1 GF LV Room EDB-1 ELCB-1 3 9 EM GF near parking 04 Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 3 10 EM GF near parking 08 Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 3 11 EXIT GF near parking 10 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 12 EM GF near parking 11 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 13 EM GF near parking 13 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 14 EM GF near Steel staircase Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 15 EM GF near parking 15 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 16 EM GF near parking 17 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 3 17 EXIT GF near parking 19 Ground Floor
2 5 GF LV Room DB-GN ELCB-2 3 18 EM GF near parking 21 Ground Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)

CKT- 4
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 4 GF LV Room EDB-1 ELCB-3 4 1 EXIT Fire pump room Ground Floor
2 4 GF LV Room EDB-1 ELCB-3 4 2 EM Fire Pump room Ground Floor
2 3 GF LV Room EDB-1 ELCB-2 4 3 EM Bulk Waste collection Ground Floor
2 3 GF LV Room EDB-1 ELCB-2 4 4 EM Garbage Room Near stair -2 Ground Floor
2 3 GF LV Room EDB-1 ELCB-2 4 5 EM Garbage Room Near stair -2 Ground Floor
2 2 GF LV Room EDB-1 ELCB-2 4 6 EM GF near parking 23 Ground Floor
2 2 GF LV Room EDB-1 ELCB-2 4 7 EM GF near parking 25 Ground Floor
2 2 GF LV Room EDB-1 ELCB-2 4 8 EM GF near parking 27 Ground Floor
2 2 GF LV Room DB-GN ELCB-2 4 9 EM GF exit corridor near stair-2 Ground Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 2 GF LV Room DB-GN ELCB-2 4 10 EM GF shop no -2 Ground Floor
2 2 GF LV Room DB-GN ELCB-2 4 11 EM GF shop no -2 store Ground Floor
2 7 GF LV Room DB-GN ELCB-1 4 12 EM GF Trolley storage Ground Floor

CKT- 5
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 1 GF LV Room EDB-1 ELCB-1 5 1 EM Main Lift lobby Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 5 2 EM Main lift lobby Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 5 3 EM Main lift lobby Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 5 4 EXIT Main entrance lift lobby Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 5 5 EM GF shop no -2 Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 5 6 EXIT GF shop no -2 Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 5 7 EM GF shop no -2 Ground Floor
2 2 GF LV Room DB-GN ELCB-2 5 8 EM GF exit corridor near stair-2 Ground Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 2 GF LV Room DB-GN ELCB-2 5 9 EXIT GF exit corridor near stair-2 Ground Floor
2 2 GF LV Room DB-GN ELCB-2 5 10 EXIT GF shop no -3 Ground Floor
2 2 GF LV Room DB-GN ELCB-2 5 11 EM GF shop no -3 Ground Floor
2 5 GF LV Room DB-GN ELCB-3 5 12 EM GF Drive way entrance Ground Floor
2 5 GF LV Room DB-GN ELCB-3 5 13 EM GF near parking 28 Ground Floor

CKT- 6
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 1 GF LV Room EDB-1 ELCB-1 6 1 EM Main Lift lobby Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 6 2 EM GF shop no -1 Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 6 3 EXIT GF shop no -1 Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 6 4 EXIT GF Drive way exit Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 6 5 EM GF Drive way exit Ground Floor
2 1 GF LV Room EDB-1 ELCB-1 6 6 EM GF near parking 59 Ground Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
2 1 GF LV Room EDB-1 ELCB-1 6 7 EXIT GF near parking 59 Ground Floor
2 6 GF LV Room DB-GN ELCB-4 6 8 EXIT GF near LV room Ground Floor
2 8 GF LV Room EDB-1 ELCB-4 6 9 EXIT GF LV room Ground Floor
2 8 GF LV Room EDB-1 ELCB-4 6 10 EM GF LV room Ground Floor
2 5 GF LV Room DB-GN ELCB-3 6 11 EM GF near parking 51 Ground Floor
2 6 GF LV Room DB-GN ELCB-4 6 12 EM GF near staircase -1 Ground Floor

CKT- 7
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
3 4 1ST Floor DB-1E ELCB-1 7 1 EM Corridor – near flat no 111 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 7 2 EXIT Corridor – near flat no 101 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 7 3 EM Corridor – near Electrical First Floor
electrical room room
3 4 1ST Floor DB-1E ELCB-1 7 4 EM Electrical room First Floor
electrical room
*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
3 4 1ST Floor DB-1E ELCB-1 7 5 EM Telephone room First Floor
electrical room
3 4 1ST Floor DB-1E ELCB-1 7 6 EM Corridor – near Lift lobby 1 First Floor
electrical room &2 lift
3 4 1ST Floor DB-1E ELCB-1 7 7 EM Corridor – near flat no 114 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 7 8 EM Corridor – near flat no 115 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 7 9 EM Corridor – near Lift lobby 3 First Floor
electrical room &4 lift
3 4 1ST Floor DB-1E ELCB-1 7 10 EM Store Room First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 7 11 EM Corridor – near flat no 104 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 7 12 EXIT Corridor – near flat no 102 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 7 13 EM Corridor – near flat no -102 First Floor
electrical room

CKT- 8
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
3 1 1ST Floor DB-1N ELCB-1 8 1 EXIT Corridor – near Stair -1 First Floor
*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
electrical room
3 4 1ST Floor DB-1E ELCB-1 8 2 EM Corridor – near Garbage First Floor
electrical room room
3 4 1ST Floor DB-1E ELCB-1 8 3 EM Garbage Room First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 8 4 EXIT Corridor – near Stair -1 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 8 5 EM Corridor – near Telephone First Floor
electrical room room
3 4 1ST Floor DB-1E ELCB-1 8 6 EM Corridor – near flat no 106 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 8 7 EM Corridor – near kids play First Floor
electrical room exit door
3 4 1ST Floor DB-1E ELCB-1 8 8 EM Corridor – near store First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 8 9 EXIT Corridor – near Stair -2 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 8 10 EXIT Corridor – near Stair -1 First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 8 11 EM Corridor – near Garbage First Floor
electrical room room
3 4 1ST Floor DB-1E ELCB-1 8 12 EM Garbage Room First Floor
electrical room
3 1 1ST Floor DB-1N ELCB-1 8 13 EXIT Corridor near 3& 4 nos lift First Floor
electrical room
3 4 1ST Floor DB-1E ELCB-1 8 14 EXIT Corridor near 1& 2 nos lift First Floor
electrical room
3 4 1ST Floor DB-1E ELCB-1 8 15 EXIT Kids Paly area First Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
electrical room

CKT- 9

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
3 5 1ST Floor DB-1E ELCB-2 9 1 EM Corridor – near flat no 211 Second Floor
electrical room
3 2 1ST Floor DB-1N ELCB-2 9 2 EXIT Corridor – near Electrical Second Floor
electrical room room
3 5 1ST Floor DB-1E ELCB-2 9 3 EM Corridor – near Electrical Second Floor
electrical room room
3 6 1ST Floor DB-1E ELCB-3 9 4 EM Electrical room Second Floor
electrical room
3 6 1ST Floor DB-1E ELCB-3 9 5 EM Telephone room Second Floor
electrical room
3 5 1ST Floor DB-1E ELCB-2 9 6 EM Corridor – near Lift lobby 1 Second Floor
electrical room &2 lift
3 5 1ST Floor DB-1E ELCB-2 9 7 EM Corridor – near flat no 214 Second Floor
electrical room
3 2 1ST Floor DB-1N ELCB-2 9 8 EM Corridor – near flat no 215 Second Floor
electrical room
3 5 1ST Floor DB-1E ELCB-2 9 9 EM Corridor – near Lift lobby 3 Second Floor
electrical room &4 lift
3 6 1ST Floor DB-1E ELCB-3 9 10 EM Store Room Second Floor
electrical room
3 6 1ST Floor DB-1E ELCB-3 9 11 EM Corridor – near flat no 204 Second Floor
electrical room
3 6 1ST Floor DB-1E ELCB-3 9 12 EXIT Corridor – near flat no 202 Second Floor
electrical room
3 6 1ST Floor DB-1E ELCB-3 9 13 EM Corridor – near flat no -202 Second Floor
electrical room

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

CKT- 10
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
3 2 1ST Floor DB-1N ELCB-3 10 1 EXIT Corridor – near Stair -1 Second Floor
electrical room
3 5 1ST Floor DB-1E ELCB-3 10 2 EM Corridor – near Garbage Second Floor
electrical room room
3 6 1ST Floor DB-1E ELCB-3 10 3 EM Garbage Room Second Floor
electrical room
3 2 1ST Floor DB-1N ELCB-3 10 4 EXIT Corridor – near Stair -1 Second Floor
electrical room
3 2 1ST Floor DB-1N ELCB-3 10 5 EM Corridor – near Telephone Second Floor
electrical room room
3 2 1ST Floor DB-1N ELCB-3 10 6 EM Corridor – near flat no 206 Second Floor
electrical room
3 5 1ST Floor DB-1E ELCB-3 10 7 EM Corridor – near store Second Floor
electrical room
3 3 1ST Floor DB-1N ELCB-3 10 8 EXIT Corridor – near Stair -2 Second Floor
electrical room
3 3 1ST Floor DB-1N ELCB-3 10 9 EXIT Corridor – near Stair -1 Second Floor
electrical room
3 6 1ST Floor DB-1E ELCB-3 10 10 EM Corridor – near Garbage Second Floor
electrical room room
3 6 1ST Floor DB-1E ELCB-3 10 11 EM Garbage room Second Floor
electrical room
3 5 1ST Floor DB-1E ELCB-3 10 12 EXIT Corridor near 3& 4 nos lift Second Floor
electrical room
3 5 1ST Floor DB-1E ELCB-3 10 13 EXIT Corridor near 1& 2 nos lift Second Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
electrical room

CKT- 11

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
3 5 1ST Floor DB-1E ELCB-2 11 1 EM Corridor – near flat no 311 Third Floor
electrical room
3 5 1ST Floor DB-1E ELCB-2 11 2 EXIT Corridor – near Electrical Third Floor
electrical room room
3 5 1ST Floor DB-1E ELCB-2 11 3 EM Corridor – near Electrical Third Floor
electrical room room
3 6 1ST Floor DB-1E ELCB-3 11 4 EM Electrical room Third Floor
electrical room
3 6 1ST Floor DB-1E ELCB-3 11 5 EM Telephone room Third Floor
electrical room
3 5 1ST Floor DB-1E ELCB-2 11 6 EM Corridor – near Lift lobby 1 Third Floor
electrical room &2 lift
3 5 1ST Floor DB-1E ELCB-2 11 7 EM Corridor – near flat no 314 Third Floor
electrical room
3 2 1ST Floor DB-1N ELCB-2 11 8 EM Corridor – near flat no 315 Third Floor
electrical room
3 5 1ST Floor DB-1E ELCB-2 11 9 EXIT Corridor – near Lift lobby 3 Third Floor
electrical room &4 lift
3 6 1ST Floor DB-1E ELCB-3 11 10 EM Store Room Third Floor
electrical room
3 3 1ST Floor DB-1N ELCB-3 11 11 EM Corridor – near flat no 304 Third Floor
electrical room
3 3 1ST Floor DB-1N ELCB-3 11 12 EXIT Corridor – near flat no 302 Third Floor
electrical room
3 3 1ST Floor DB-1N ELCB-3 11 13 EM Corridor – near flat no -302 Third Floor
electrical room

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

CKT- 12
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
3 2 1ST Floor DB-1N ELCB-2 12 1 EXIT Corridor – near Stair -1 Third Floor
electrical room
3 5 1ST Floor DB-1E ELCB-2 12 2 EM Corridor – near Garbage Third Floor
electrical room room
3 6 1ST Floor DB-1E ELCB-3 12 3 EM Garbage Room Third Floor
electrical room
3 2 1ST Floor DB-1N ELCB-2 12 4 EXIT Corridor – near Stair -1 Third Floor
electrical room
3 2 1ST Floor DB-1N ELCB-2 12 5 EM Corridor – near Telephone Third Floor
electrical room room
3 5 1ST Floor DB-1E ELCB-2 12 6 EM Corridor – near flat no 316 Third Floor
electrical room
3 5 1ST Floor DB-1E ELCB-2 12 7 EM Corridor – near store Third Floor
electrical room
3 3 1ST Floor DB-1N ELCB-3 12 8 EXIT Corridor – near Stair -2 Third Floor
electrical room
3 3 1ST Floor DB-1N ELCB-3 12 9 EXIT Corridor – near Stair -1 Third Floor
electrical room
3 6 1ST Floor DB-1E ELCB-3 12 10 EM Corridor – near Garbage Third Floor
electrical room room
3 6 1ST Floor DB-1E ELCB-3 12 11 EM Garbage room Third Floor
electrical room
3 2 1ST Floor DB-1N ELCB-2 12 12 EXIT Corridor near 3& 4 nos lift Third Floor
electrical room
3 5 1ST Floor DB-1N ELCB-2 12 13 EXIT Corridor near 1& 2 nos lift Third Floor

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
electrical room

CKT- 13

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
4 4 4th Floor DB-E ELCB-1 13 1 EM Corridor near flat no-406 Fourth Floor
electrical room
4 4 4th Floor DB-E ELCB-1 13 2 EXIT Corridor near flat no-406 Fourth Floor
electrical room
4 1 4th Floor DB-N ELCB-1 13 3 EM Corridor near garbage room Fourth Floor
electrical room stair-1
4 4 4th Floor DB-E ELCB-1 13 4 EM Corridor near lift 1& 2 Fourth Floor
electrical room
4 1 4th Floor DB-N ELCB-1 13 5 EM Lift lobby – 3&4 Fourth Floor
electrical room
4 4 4th Floor DB-E ELCB-1 13 6 EM Corridor near flat no-403 Fourth Floor
electrical room
4 1 4th Floor DB-N ELCB-1 13 7 EXIT Corridor near flat no-402 Fourth Floor
electrical room
4 1 4th Floor DB-N ELCB-1 13 8 EXIT Corridor near flat no-402 Fourth Floor
electrical room
4 5 4th Floor DB-E ELCB-2 13 9 EM Garbage room near stair -2 Fourth Floor
electrical room
4 6 4th Floor DB-E ELCB-3 13 10 EM Stair-2 roof level Roof
electrical room
4 6 4th Floor DB-E ELCB-3 13 11 EM Stair -2 roof down level Roof
electrical room
4 6 4th Floor DB-E ELCB-3 13 12 EM Stair -2 3rd floor level Third floor
electrical room
4 6 4th Floor DB-E ELCB-3 13 13 EM Stair -2 2nd floor level Second floor
electrical room
4 6 4th Floor DB-E ELCB-3 13 14 EM Stair -2 1st floor level First floor
electrical room

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
4 6 4th Floor DB-E ELCB-3 13 15 EM Stair -2 ground floor up Ground floor
electrical room level
4 1 4th Floor DB-N ELCB-1 13 16 EXIT Corridor near lift 1& 2 GYM
electrical room
4 2 4th Floor DB-N ELCB-2 13 17 EXIT Swimming pool area Roof
electrical room
4 2 4th Floor DB-N ELCB-2 13 18 EXIT Swimming pool area Roof
electrical room

CKT- 14
*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
4 1 4th Floor DB-N ELCB-1 14 1 EM Corridor near stair 1 Fourth Floor
electrical room
4 4 4th Floor DB-E ELCB-1 14 2 EXIT Corridor near stair 1 Fourth Floor
electrical room
4 4 4th Floor DB-E ELCB-1 14 3 EXIT Corridor near stair 1 Fourth Floor
electrical room
4 5 4th Floor DB-E ELCB-2 14 4 EM Garbage room near stair 1 Fourth Floor
electrical room
4 1 4th Floor DB-E ELCB-1 14 5 EM Lift lobby near 1 & 2 lift Fourth Floor
electrical room
4 1 4th Floor DB-N ELCB-1 14 6 EM Corridor near flat no-405 Fourth Floor
electrical room
4 4 4th Floor DB-E ELCB-1 14 7 EM Lift lobby near lift 3& 4 Fourth Floor
electrical room
4 5 4th Floor DB-E ELCB-2 14 8 EM Electrical room Fourth Floor
electrical room
4 5 4th Floor DB-E ELCB-2 14 9 EM Telephone room Fourth Floor
electrical room
4 4 4th Floor DB-E ELCB-1 14 10 EM Corridor near flat no-403 Fourth Floor
electrical room
4 1 4th Floor DB-N ELCB-1 14 11 EXIT Corridor near flat no-403 Fourth Floor
electrical room
4 1 4th Floor DB-N ELCB-1 14 12 EM Corridor near garbage room Fourth Floor
electrical room
4 6 4th Floor DB-E ELCB-3 14 13 EM Stair case -2 4th floor level Fourth Floor
electrical room
4 6 4th Floor DB-E ELCB-3 14 14 EM Staircase -2 4th floor down Fourth Floor
electrical room level

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
4 6 4th Floor DB-E ELCB-3 14 15 EM Staircase -2 3rd floor down Third floor
electrical room level
4 6 4th Floor DB-E ELCB-3 14 16 EM Staircase -2 2nd floor down Second Floor
electrical room level
4 6 4th Floor DB-E ELCB-3 14 17 EM Staircase -2 1st floor down First Floor
electrical room level
4 6 4th Floor DB-E ELCB-3 14 18 EM Stair -2 ground floor level Ground Floor
electrical room
4 6 4th Floor DB-E ELCB-3 14 19 EXIT Stair -2 ground floor level Ground Floor
electrical room
4 1 4th Floor DB-E ELCB-1 14 20 EXIT Lift lobby Fourth floor
electrical room

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

CKT- 15
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
4 2 4th Floor DB-N ELCB-2 15 1 EM Gym room GYM floor
electrical room
4 2 4th Floor DB-N ELCB-2 15 2 EM Gym room GYM floor
electrical room
4 2 4th Floor DB-N ELCB-2 15 3 EM Gym room GYM floor
electrical room
4 2 4th Floor DB-N ELCB-2 15 4 EXIT Gym entrance GYM floor
electrical room
4 2 4th Floor DB-N ELCB-2 15 5 EM Lift lobby GYM floor
electrical room
4 2 4th Floor DB-N ELCB-2 15 6 EXIT Near lift lobby Gym floor
electrical room

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET
Programming for SAM: Eng. Mohammad Qeeq
PAGE#:
`

CKT- 16
DB Section Details
LIGHT LEVEL (GF,
SAM # SAM CH.# SAM Location DB REF. (ELCB, MCB, CIRCUIT # LIGHT # AREA NAME
TYPE(EMG/EXIT) MZ...)
MCCB,INCOMER)
4 2 4th Floor DB-N ELCB-2 16 1 EM Gym room Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 2 EM Gym room Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 3 EM Gym room Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 4 EM Gym room Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 5 EXIT Corridor – near staircase Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 6 EM Corridor Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 7 EXIT Near lift exit Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 8 EXIT Swimming pool Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 9 EXIT Gym Room Gym Floor
electrical room
4 2 4th Floor DB-N ELCB-2 16 10 EXIT Gym Room Gym Floor
electrical room

*THE DATA SHOULD BE BASED ON APPROVED AS BUILT DRAWING ANY INCORRECT DATA IS UNDER CONTRACTOR RESPONSIBILITY
*EACH CKT SHOULD BE IN SEPRATE DATASHEET