JOB SAFETY ANALYSIS

PROJECT TITLE:
EF-2034/ 15052214 - JLO EXPORT FACILITIES
AND UPGRADING OF EXISTING EXPORT
NETWORK
Work Activity: Bore hole drilling JSA Number WES-JSA-001
Date: 10/12/2019 Prepared By: Praveen Kumar /Mahmoud Almalt

Sl.
Sequence of Job Components/ Tasks Potential Accidents or Hazards Recommendation to Eliminate/ Reduce Hazards
No.

- HSE induction.
- Fire extinguishers.
- Take Work Permit and other associated permits from Asset Owner.
- Ensure all employees have their PPE and the personal gas monitor
- Unauthorized Work - Watch your step and never be in a hurry.
- Fire & Explosion - Discuss the specific job and its hazards in tool box talks.
- Slip/ trip/ fall - Barricade the working area to prevent slip/ trip/ falls
Job Preparation, Pre drilling work and Permit - Operators should be trained and certified
1 - Untrained Personnel.
to Work
- Poor lighting (Early hour/ late - Proper lighting arrangements shall be ensured in case of poor daylights (Early
evening work). hour/ late time work).
- Setup barriers to keep vehicles and visitors out of the work area and use caution
tape
- Underground utilities should be marked out before drilling begins.
- Observe overhead lines, tree limbs, or other objects before raising the mast of
the drill rig.
- Position the drill rig in a safer distance from overhead power lines.
2 Mobilization of truck mounted drilling rigs - Road Accident. - All underground facilities shall be identified and caution signage placed.
- Leak of Supervision - All exposed facilities shall be adequately protected/ alerted.
- No equipment or vehicle shall march on the underground facilities without
- Getting lost in the field (Fog / Sand
Storms / Rains). adequate protection.
- Close supervision and maintain safe distance from the line.
- Check the ground condition prior to place the rig of drilling.
- Assign banks man always with the equipment.
Page 1 of 4
JOB SAFETY ANALYSIS
PROJECT TITLE:
EF-2034/ 15052214 - JLO EXPORT FACILITIES
AND UPGRADING OF EXISTING EXPORT
NETWORK
Work Activity: Bore hole drilling JSA Number WES-JSA-001
Date: 10/12/2019 Prepared By: Praveen Kumar /Mahmoud Almalt

Sl.
Sequence of Job Components/ Tasks Potential Accidents or Hazards Recommendation to Eliminate/ Reduce Hazards
No.

- Height limit goal post shall be erected in case of overhead power line area.
- Activity in the area of overhead power line shall be specifically mentioned
in the work permit.
- Consider the weather conditions and visibility
3 Drilling. - Drilling into underground utilities - Setup barriers to keep vehicles and visitors out of the work area and use caution
- Striking overhead lines or objects tape
with drill mast. - Underground utilities should be marked out before drilling begins.
- Observe overhead lines, tree limbs, or other objects before raising the mast of
- Damage to facility.
the drill rig.
- Personnel Injury. - Position the drill rig in a safer distance from overhead power lines.
- Manual handling of materials. - Wear approved safety ear plugs when working close enough to drill rig.
- Caught in between/ Entanglement/ - When necessary, wear appropriate PPE to protect from dust for inhalation
Drowning. hazard.
- Flying objects due to shaft failure. - Avoid moving parts of machinery. Keep fingers, hands, and arms away from
- Hit with unidentified objects / rotating drill head near the top (connection to drive) or near the bottom (hole
Explosion. entrance).
- Keep all drill bits secured when not in use, to prevent rolling off the rig or other
- Personal Injury movement.
- Stand clear as drill pipe is lowered into rack by cable; pipes come down fast and
could make contact with a person’s head, body or hand.
- Personnel on the ground should keep away from the drill rig unless they are
required for the task. Drillers and helpers should work together to lift and carry
heavy augers, drill pipe.
- Do not approach heavy equipment without first establishing eye contact with the
operator.
Page 2 of 4
JOB SAFETY ANALYSIS
PROJECT TITLE:
EF-2034/ 15052214 - JLO EXPORT FACILITIES
AND UPGRADING OF EXISTING EXPORT
NETWORK
Work Activity: Bore hole drilling JSA Number WES-JSA-001
Date: 10/12/2019 Prepared By: Praveen Kumar /Mahmoud Almalt

Sl.
Sequence of Job Components/ Tasks Potential Accidents or Hazards Recommendation to Eliminate/ Reduce Hazards
No.

- Ensure that all heavy machinery have audible back-up signals and never work
alone when operating heavy machinery.
- Ensure first aid facility will be available.
- Physical hazards associated with
handling and transferring fuel to 1. Wear Appropriate PPE
machinery. These include
4 Re-fueling of drill rig or heavy machinery 2. Make sure that No ignition sources present (e.g., cigarette smoking)
ignition/explosion, inhalation of
fumes, accidental ingestion, and 3. Avoid contact of hands with any portion of the face.
eye contact.
- Ensure proper wind up and housekeeping of the work site.
- All equipment’s and machineries shall be parked in a safe place after completion
Job Completion - House Keeping. of the daily work activity.
6 - Securing of tools and equipment’s - Equipment parked area shall be barricaded and placed with caution signage.
- All waste and spillages shall be removed and disposed as per company waste
management procedure
- Be aware of the snakes, scorpions and other dangerous or poisonous
insects and animals at work site.
Additional Hazards - Biological hazards, bites from - Do no feed or be friend with stray animals / wild life and make sure the
6
insects and reptiles team always stay together.
- Ensure buddy system is implemented.
- Take rest at designated rest shelters.
GENERAL REGULATORY REQUIREMENTS

Page 3 of 4
JOB SAFETY ANALYSIS
PROJECT TITLE:
EF-2034/ 15052214 - JLO EXPORT FACILITIES
AND UPGRADING OF EXISTING EXPORT
NETWORK
Work Activity: Bore hole drilling JSA Number WES-JSA-001
Date: 10/12/2019 Prepared By: Praveen Kumar /Mahmoud Almalt

Sl.
Sequence of Job Components/ Tasks Potential Accidents or Hazards Recommendation to Eliminate/ Reduce Hazards
No.

- Conduct HSE induction.


- Conduct Tool Box Talk for the employees engaged in the work about the hazards associated with the drilling work and review the JSA with the crews.
- Comply with KNPC Safety Rules & Regulations.
- Use the basic PPE (H2s Gas Monitor, Helmet, Goggles, Coverall and Safety Shoe) while entering in the work location. Specific PPEs shall be used during the execution of
respective work activities.
- Regularly remove the waste from the work location, segregate them as Hazardous & Non-Hazardous and dispose it accordingly as per KNPC Safety Rules.

PREPARED BY (WES): APPROVED BY (KNPC):


NAME Praveen Kumar/ Mahmoud Almalt

SIGNATURE