Notes: "F" (I.e. CB 123F)
Notes: "F" (I.e. CB 123F)
3’-0"
5. DIMENSION VARIES WITH MANU-
FACTURER. MEASURE RACK BEFORE
BORING BOTTOM HOLE.
CAP. TRANSFORMER
C.U. BANK SIZE
UNITS INCLUDED
CB
007
SEE NOTE 3
9’-0" MAX.
8’-6" MIN.
FINAL GRADE
REV.FORMAT 8512E48.DGN
OVERHEAD DISTRIBUTION
CONSTRUCTION STANDARDS 22kV CAPACITORS ISSUE DATE: 09/15/88
R
REV. DATE: 08/01/99
1350 KVAR
SWITCHED BANK APPROVAL:
KS 40 Fitall
1350 kVAR
(60-2950)
1302
DATE: 3-23-94 Overhead Distribution
REV. NO.: 1
CAPACITORS Construction Standards
REV. DATE: 1-30-94
PROTECTIVE EQUIPMENT AND FUSING
APPROVAL:
21.6kV CAPACITOR FUSES
1302 PROPRIETARY MATERIAL
TEST ALL NEWLY CONSTRUCTED CAPACITOR BANKS BEFORE PLACING IN SERVICE
TEST ALL CAPACITOR BANKS AFTER REPLACING FAILED TANKS
3. USING HOT STICK AND TEMPORARY JUMPERS, SHORT ACROSS AND GROUND EACH OF
THE THREE GROUPS OF CAPACITORS.
10. INSTALL ALL NEW PRIMARY FUSES AFTER REPLACING ANY OF THE TANKS. A FAULT
THAT BLOWS ONRE FUSE GENERALLY WEAKENS THE OTHER TWO.
NOTE: THE FIRST FOUR STEPS OF THE ABOVE PROCEDURE MAY BE OMITTED FOR NEW
INSTALLATIONS THAT HAVE NEVER BEEN ENERGIZED.
*CAPACITANCE METER REPLACES THE PREVIOUSLY USED SIMPSON METER FOR CHECKING
CAPACITORS.
1303