Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

97

97.10

97.20

97.50
97 .40 97 97 97 97 98 98 98 98 98 98 98 98 98 98
.3 .6 .7 .8 .9 .0 .1 .2 .3 .4 .5 .6 .7 .8 .9
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

RDC-Africa
99
.0 99
0 .1
0 99
.2 99
0 .3
0 99
.4 99
0 .5
.10 0 99
97 .6 99
0 .7
EXISTING
0 99
.8 99
KERB INLET 0 .9 10
.20 0 0.0 10
0.1

100
0 0
97

100
.20

.30
97 LEVELS TO TIE IN TO
.20
THE EXISTING HIGHWAY
97
.10
PIPE INVERT LVL = 96000 PIPE INVERT LVL = 97000
X 197.52 m X 197.39 m LEVELS TO TIE IN TO
97 Y 2.8 m
TO BE CONFIRMED. (APPROXIMATELY) SEE REF "Carriageway
.00 Y 32.48 m LEVELS TO TIE IN TO
EXISTING LVL 97.24 m NEW PIPE TO TIE-IN EXISTING X 196.18 m X 196.11 m X 196.05 m NEW PIPE TO TIE-IN INTO X 196.01 m X 195.81 m Widening Detail & THE EXISTING HIGHWAY
96 LVL 97.4 m Y 42.77 m X 195.64 m THE EXISTING HIGHWAY
KERB INLET .90 INTO NEW JCT. KERB INLET Y 62.8 m Y 82.8 m NEAREST EXISTING KERB INLET. Y 102.85 m Y 122.8 m
LVL 97.48 m LVL 97.68 m
Layerworks" C-002 Y 142.82 m EXISTING X 194.65 m LEVELS TO TIE IN TO
96 LVL 97.88 m LVL 98.18 m LVL 98.34 m X 194.14 m
.80 LVL 98.55 m KERB INLET Y 162.8 m
LVL 98.75 m Y 182.85 m THE EXISTING HIGHWAY Private Bag X2067
X 192.83 m
Y 22.79 m EX.Ø440mm SW PIPE EXISTING OPTIC
EX.Ø440mm SW PIPE
LVL 99.24 m X 192.18 m Krugersdorp

6.00 m
LVL 97.2 m FIBRE MANHOLE KERB NOTE: Y 202.79 m LEVELS TO TIE IN TO South Africa 1740
KERB NOTE:

7.00 m
X 189.3 m TO MATCH EXISTING EX.Ø440mm LVL 99.5 m THE EXISTING HIGHWAY
Y 0.81 m X 189.1 m TO MATCH EXISTING SW PIPE
. X 189.18 m X 189.11 m
HIGHWAY BARRIER KERB. X 189.1 m X 189.25 m CONSULTANT:
LVL 96.53 m Y 94.9 m HIGHWAY BARRIER KERB. EXISTING X 188.91 m
Y 42.77 m Y 62.27 m Y 84.13 m Y 182.79 m KERB INLET Y 235.69 m
23.93 m . LVL 97.33 m LVL 97.55 m LVL 97.75 m
LVL 97.9 m
GI 17
LVL 99 m
99.7 LVL 100.1 m
X 186.75 m 0
16. 09 X 185.93 m GIT = 97.90 Y 162.83 m 99.6
97.30 m . EXISTING Y 69.24 m X 185.5 m
.
X 185.47 m 0

5.27 m
X 183.88 m IL = 97.04 Y 122.81 m Y 142.78 m
LVL 98.57 m 99.5
POWER POLES LVL 97.96 m 97.8
0
Y 103.48 m X 183.78 m 0
X 183.88 m
Y 11.12 m
28.75 m X 183.86 m
Y 68.9 m LVL 98.1 m
LVL 98.13 m
100.23 m LVL 98.34 m Y 203.71 m 99.4
0

15.68 m
LVL 99.02 m 99.3
LVL 98 m EXISTING 0

5.43 m
LVL 97.55 m
96.80 99.2
POWER POLES 0
97.9
0
. CONSULTING ENGINEERS

.
99.1

.
X 179.87 m

7.26 m
97.40
0
96.90 223 222 221 220 219 218 217 216 215 214 213 212 211 210 209 208 207 206 205 204 203 202 201 200 199 198 197 196 195 40.16 m Y 243.67 m

12.00 m
99.0 Specialists in Structural and Civil Engineering

5.15 m
5.00 m
0
LVL 99.65 m EXISTING

.
R 5650 0m 98.90 MANHOLE
2.5
97.00 0
98.0
PO BOX 453 TEL +27 11 822 5252
X 175.37 m 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4
000 . 98.80 BEDFORDVIEW FAX +27 11 822 5272
R 15
97.10 Y 3.42 m X 175.37 m X 175.37 m
97.50
X 175.37 m X 175.36 m X 175.36 m X 175.36 m X 175.37 m X 175.36 m X 175.36 m X 175.36 m X 175.36 m X 175.36 m X 175.36 m X 175.36 m X 175.36 m X 175.35 m X 175.35 m X 175.35 m X 175.35 m X 175.35 m 4.46 m
97.20 LVL 97.5 m 27.51 m 2008
Y 12.68 m Y 22.67 m Y 32.67 m Y 42.67 m Y 52.67 m Y 63.91 m Y 107.48 m Y 115.59 m Y 125.59 m Y 135.59 m Y 145.59 m Y 155.59 m Y 165.58 m Y 175.59 m Y 185.59 m Y 195.59 m Y 205.59 m 98.70 Y 215.59 m Y 220.62 m Y 235.59 m

27
97.30 0
98.1
LVL 97.53 m LVL 97.57 m LVL 97.61 m LVL 97.64 m LVL 97.75 m LVL 97.9 m LVL 98.22 m LVL 98.24 m LVL 98.26 m LVL 98.31 m LVL 98.41 m LVL 98.54 m LVL 98.57 m LVL 98.53 m LVL 98.46 m LVL 98.5 m LVL 98.54 m LVL 98.58 m LVL 98.6 m LVL 99.56 m
97.40 X 172.8 m Email: info@mrhce.co.za
X 172.81 m Y 94.9 m
98.60
15.29 m

GIT = 97.50

224
3
Y 84.12 m Website: www.mrhce.co.za

28
LVL 98.15 m EXISTING TEL

IL = 96.11
7.00 m 97.60 57.96 m LVL 98.2 m MANHOLE
GI 18 X 170.85 m EXISTING

225
97.5
Y 196.58 m POWER POLES
0 98.20

29
KI 1

2
GIT = 98.15

EMERGENCY
LVL 98.54 m
IL = 97.12

THE EXISTING ROAD EDGE


EXIT GATE

RAMP LEVEL TO TIE IN TO


0m

RAMP UP
10.00 m
X 166.88 m 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194

0m
226
0,3m FILL

30

1
97.70

3.5
Y 18.68 m X 166.87 m

3.5
LVL 97.75 m Y 58.68 m
97.6
0 LVL 98 m 5.50 m 9.95 m 7.51 m 4.00 m 10.50 m 11.99 m 3.50 m

31
12.06 m 2.50 m 40.00 m 2.50 m 98.30

97.80
22.01 m 13.
00 ISSUED FOR

32
20. m 13.

1
0
00 X 158.51 m

B5

B9
B8
B7
B4

B6
B3
B2
B1
64

B1
B1
97 X 158.54 m 178 177 176 175 174 173 172 171 170 169 168 167 166 165 164 163 m m Y 220.62 m
COORDINATION

33
.70
Y 3.45 m LVL 98.75 m
X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.54 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.53 m X 158.52 m X 158.52 m X 158.52 m X 158.52 m X 158.51 m X 158.51 m X 158.52 m
LVL 97.85 m Y 12.67 m Y 22.67 m
97.90
Y 32.67 m Y 42.67 m Y 52.67 m Y 63.93 m Y 72.68 m Y 84.12 m Y 105.6 m Y 115.59 m Y 125.59 m Y 135.59 m Y 145.59 m 7.6 Y 155.59 m Y 165.58 m
Y 94.89 m 4m Y 175.59 m Y 185.59 m Y 195.59 m Y 205.59 m Y 215.59 m Y 225.59 m Y 235.59 m
LVL 97.9 m

34
LVL 97.95 m LVL 97.99 m LVL 98.03 m LVL 98.13 m LVL 98.24 m LVL 98.33 m 98.
40LVL 98.45 m LVL 98.4 m LVL 98.42 m LVL 98.44 m LVL 98.46 m LVL 98.48 m LVL 98.51 m LVL 98.53 m LVL 98.56 m LVL 98.58 m LVL 98.61 m LVL 98.66 m LVL 98.7 m LVL 98.73 m LVL 98.8 m LVL 98.9 m PLEASE VERIFY ALL DIMENSIONS ON SITE

7.00 m

7.00 m

7.00 m
AND REPORT ANY DISCREPANCIES

GIT = 97.85
IL = 96.20

35
98.00
GI 19
97 GIT = 98.40 2.50 m 2.50 m

KI 2
IL = 97.20
.80

57.50 m 36
98.50

10.00 m
68.30 m
141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266

100.40
Ø450mm PIPE
X 150.03 m

100.30
X 149.88 m X 149.87 m X 149.95 m

100.20
100.10
SW LINE 1

100.00
98.10
Y 18.67 m Y 73.67 m Y 163.61 m Y 218.62 m LEGEND

99.90
0,3m FILL
90

99.80
97.

99.70
10.00 m

10.00 m
LVL 98.81 m

67.71 m

1,5m CUT
LVL 98.63 m

99.60
LVL 98.12 m LVL 98.54 m

99.50
99.40
99.30
STRUCTURES

99.20
38

99.10
99.00
98.90
00 PEDESTRIAN PATHS
98. 98.60
X 141.37 m X 141.53 m

39
98.20
Y 108.62 m CARRIAGEWAY
Y 218.6 m
140 139 138 137 136 135 134 133 132 131 130 129 128 127 126 125 124 123 122 121 120 119
20.35 m LVL 98.67 m 304 303 302 301 300 299 298 297 296 295 294 293 292 291 290 289 288 287 286 285 284 283 282 281 280 279 278 277 276 275 274 273 272 271 270 269 LVL 98.87 m
98.
10 X 141.34 m SWIMMING POOL

40
Y 3.43 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.4 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.39 m X 141.38 m X 141.38 m X 141.38 m X 141.38 m X 141.37 m X 141.37 m X 141.38 m TURNING CIRCLE
LVL 98.1 m Y 12.67 m Y 22.66 m Y 32.66 m Y 42.67 m Y 52.66 m Y 62.67 m Y 72.67 m Y 84.12 m Y 94.89 m R 13500 Y 105.59 m Y 115.59 m Y 125.59 m Y 135.59 m Y 145.59 m Y 155.59 m Y 165.59 m Y 175.59 m Y 185.6 m Y 195.59 m Y 205.6 m Y 215.59 m Y 225.59 m Y 235.59 m

41.30 m
98.30
20 LVL 98.22 m LVL 98.33 m LVL 98.38 m LVL 98.42 m LVL 98.52 m LVL 98.62 m LVL 98.68 m LVL 98.7 m LVL 98.65 m LVL 98.66 m LVL 98.68 m LVL 98.69 m LVL 98.7 m LVL 98.7 m LVL 98.7 m LVL 98.71 m LVL 98.74 m LVL 98.77 m LVL 98.82 m LVL 98.85 m LVL 98.87 m LVL 98.88 m LVL 98.9 m SLURRY SEAL

41

7.00 m
98.
GIT = 98.10

98.70 SEPTIC TANK


IL = 96.28

7.00 m

7.00 m
GI 20 R 135
42
30 STRUCTURES
98.
GIT = 98.65 00
KI 3

PEDESTRIAN PATHS
98.40
IL = 97.28
43

97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 KERBS
98.
40
X 132.88 m
12.09 m

5.00 m
X 132.87 m X 132.94 m X 133.02 m

Ø450mm PIPE
Y 18.67 m 2.50 m PARKING BAYS
44

Y 218.64 m

SW LINE 5
Y 73.67 m Y 163.62 m
LVL 98.43 m

1,2m CUT
10.00 m

98.80

10.00 m

10.00 m
LVL 98.89 m
0,6m FILL

50 LVL 98.8 m LVL 98.8 m 98 CONTOURS


98. .9
0 99
.0 99
45

0
98
.1
0 99
.2 99 WALLS
.5 0 .3 99
0 0 .4 99 BUILDING LINE
ACCESS TO THE ADJACENT ENTERTAINMENT COMPLEX:
0 .5 99
46

0 .6 99
0
96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 386 385 384 383 382 381 380 379 378 377 376 375 374 373 372 371 370 369 368 367 366 365 364 363 362 361 360 359 358 357 356 355 354 353 352 351 350 349 348 347
.7
0 STORMWATER
X 124.51 m
Y 3.44 m ROAD CENTRE
• THE ACCESS TO THE CONCRETE SLAB ON THE X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.5 m X 124.49 m X 124.49 m X 124.49 m X 124.48 m X 124.48 m X 124.48 m X 124.48 m X 124.49 m
47

12.00 m

98.60
LVL 98.35 m Y 12.67 m Y 22.67 m Y 32.67 m Y 42.67 m Y 52.67 m Y 62.67 m Y 72.67 m Y 84.12 m Y 94.9 m Y 105.59 m Y 115.59 m Y 125.59 m Y 135.59 m Y 145.59 m Y 155.58 m Y 165.58 m Y 175.58 m Y 185.59 m Y 195.59 m Y 205.59 m Y 215.59 m Y 225.59 m Y 235.59 m

100.60
100.50
ROAD LINE
ASSEMBLY HALL PROPERTY NEEDS TO BE

100.4
LVL 98.6 m LVL 98.69 m LVL 98.74 m LVL 98.8 m LVL 98.89 m LVL 98.9 m LVL 98.91 m LVL 98.95 m LVL 98.9 m LVL 98.88 m LVL 98.88 m LVL 98.9 m LVL 98.9 m LVL 98.9 m LVL 98.9 m LVL 98.9 m LVL 98.9 m LVL 98.9 m LVL 98.9 m LVL 98.9 m LVL 98.92 m LVL 99.25 m LVL 99.59 m

100.3
100.2
7.00 m

7.00 m

100.1
48

EX. STORMWATER

7.00 m
CLOSED/DENIED BEFORE THE CONCRETE SLAB MAY

100.0

0
GIT = 98.35

0
98.70

99.90

0
99.80
IL = 96.37

12.06 m 2.50 m 55.00 m 2.50 m

0
99.70
GI 21
BE DEMOLISHED/BROKEN DOWN FOR USE IN THE

0
99.60
45.00 m

99.50
GIT = 98.90 2.50 m 5.00 m 2.50 m

99.40
49

99.30
CONSTRUCTION OF THE FILL LAYERS. 62.56 m 2.44 m 20.00 m 12.51 m 55.00 m

99.20
IL = 97.37

99.10
KI 4

98.80

99.00
50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 7.00 m 10.00 m 7.00 m 10.00 m 7.00 m
5.50 m

387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408

5.00 m
5.00 m
5.00 m
• THE TIMING OF THIS CLOSURE NEEDS TO BE 98.90 X 115.87 m X 115.87 m
NEGOTIATED BETWEEN THE OWNERS OF THE
Y 73.67 m Y 163.6 m 13.57 m 7.00 m
LVL 99 m LVL 99 m
ASSEMBLY HALL PROPERTY AND THE OWNERS OF

666
X 110.87 m X 110.87 m X 110.86 m X 112.53 m X 112.53 m X 112.53 m X 112.53 m
X 110.86 m

594

515
665

595
409
THE ENTERTAINMENT COMPLEX PROPERTY. 75,0m BUILDING LINE Y 44.11 m Y 60.11 m 75,0m BUILDING LINE Y 131.11 m Y 181.13 m Y 198.13 m Y 215.13 m Y 235.59 m
5.00 m

5.02 m
X 110.87 m X 110.86 m Y 115.11 m X 110.86 m EXISTING

11.68 m
X 110.88 m X 110.87 m LVL 99.25 m LVL 99.25 m X 110.86 m LVL 98.95 m LVL 98.93 m LVL 98.92 m LVL 99.49 m
Y 101.11 m LVL 99.25 m LVL 99.25 m POWER POLES

667
Y 57.11 m Y 128.11 m
Y 18.71 m Y 41.11 m PATHWAY Y 153.51 m

593

516
664

596
410
LVL 99.25 m LVL 99.25 m LVL 99.25 m LVL 99.25 m LVL 99.25 m

2.00 m 10.00 m
LVL 99.25 m
• THE PROPOSED FINAL DESIGN TO BE IMPLEMENTED FFE 99.15

668
X 105.88 m
FOR ACCESS/EGRESS TO AND FROM THE ASSEMBLY

592

517
663

597
411
Y 18.71 m LADIES #2 MENS #2 BOOTHS #2 BOOTHS #1 MENS #1 LADIES #1

0,2m CUT
0,6m FILL

0,8m FILL

0,8m FILL

0,8m FILL

0,7m FILL

0,7m FILL

0,5m FILL

0,4m FILL

0,3m FILL
0,4m FILL

0,1m FILL
5.00 m

5.00 m

5.00 m
HALL PROPERTY NEEDS TO BE DISCUSSED WITH THE LVL 99.25 m X 105.87 m
112.00m² 65.00m² 55.11m² 55.00m² 65.00m² 112.00m² X 104.89 m

669
Y 41.11 m X 105.87 m X 105.86 m 75,0m BUIL
OWNERS OF THE ADJACENT ENTERTAINMENT 1.50 m 5.00 m DING LINE

591

518
Y 229.81 m

662

598
412
Y 71.11 m Y 101.11 m
FFE 99.25 LVL 99.25 m FFE 99.25 FFE 99.25 LVL 99.25 m LVL 99.25 m FFE 99.25 FFE 99.25 FFE 99.25 LVL 99.25 m
PROPERTY TO INFORM THEM. THIS WILL ALSO

2.00 m
X 102.53 m X 102.53 m X 102.53 m

100.70
590

519
661

599

100.60
PROVIDE AN OPPORTUNITY FOR THEM TO COMMENT Y 181.13 m Y 198.13 m Y 215.13 m

100.50
0,7m CUT

100.40
LVL 98.98 m LVL 98.95 m LVL 98.94 m

100.30
AND PERHAPS ADD SOME FURTHER INPUT WHERE

100.20
2.50 m 5.00 m 2.50 m 5.00 m 2.50 m 5.00 m2.50 m 13.50 m 3.00 m 56.00 m

100.10
2.00 m 5.00 m
X 104.91 m

589

520
660

600

100.00
THE DESIGN MAY AFFECT THEM.

99.90
X 98.41 m X 98.06 m X 98.06 m Y 237.31 m
PATHWAY X 98.86 m X 98.06 m X 98.06 m PATHWAY

99.80
JCT 1 / GI 1 X 97.61 m X 97.61 m LVL 99.48 m
Y 3.43 m Y 35.45 m Y 51.46 m Y 124.47 m Y 143.12 m

99.70
GIT = 98.80 SW LINE 3 Y 79.11 m Y 94.89 m SW LINE 8
Y 105.8 m
FFE 99.15

588

521
659

601
LVL 98.8 m LVL 98.9 m FFE 99.15 LVL 98.9 m

99.60
LVL 99 m LVL 99 m LVL 98.9 m LVL 98.9 m
IL = 96.50 Ø300mm PIPE LVL 98.9 m Ø300mm PIPE

APPROXIMATELY 1,9m CUT DEPTH


• THE LOCAL AUTHORITY CAN THEN BE APPROACHED JCT 3 / GI 10

99.50
1.
41

99.40
GIT = 98.90 JCT 6 / GI 32
FOR THEIR STAMP OF APPROVAL WITH A D H

41

587

522

99.30
658

602
m

CARETAKER / GUEST
ILL IL = 96.80 ILL GIT = 98.90

1.
mF

99.20
GI 8 GI 9 mF
0.5

COMPREHENSIVE TRANSPORTATION DESIGN THAT GI 31

0.5
0,6 0,1 IL = 97.75

189.41 m
413

99.10
X 98.06 m GIT = 98.90 GIT = 98.90 X 92.53 m X 92.53 m X 92.53 m
GIT = 98.90

99.00
0m

APARTMENTS
0m

586

523
657

603
Y 19.44 m
CATERS FOR THE NEEDS OF BOTH PROPERTY IL = 96.60 IL = 96.70 IL = 97.65
Y 181.13 m Y 198.13 m Y 215.13 m
LVL 98.9 m
0m 0m LVL 99 m LVL 98.98 m LVL 98.96 m

FFE 99.25
2,5m BUILDING LINE

4.0

202.52m²

.
JCT 4 / GI 22 GI 30

414
OWNERS. 4.0
0m

27.00 m
GIT = 99.00 GIT = 98.90
0m

585

524
656

604
2.5 IL = 97.50 IL = 97.56 2.5
189.30 m

X 87.86 m

415
Y 148.62 m

584

525
654

605
LVL 98.9 m

416
GI 33

583

526
653

606
X 83.93 m GIT = 98.90
Y 94.9 m

PATHWAY
NOTES: IL = 97.80

FFE 99.15

417
LVL 98.8 m GI 23 X 82.53 m X 82.53 m X 82.53 m EXISTING FIBRE

582

527
652

607
m GIT = 98.80 m Y 181.13 m Y 198.13 m Y 215.13 m MANHOLE
00 00
49. IL = 97.57 49. m
LVL 99 m LVL 99 m LVL 98.98 m

418
• EXISTING CONCRETE SHALL BE BROKEN DOWN 00
m X 79.88 m
00 7.50 m
49.
Y 61.12 m
49.

581

528
651

608
SW LINE 6
AND DEMOLISHED AND USED IN FILL AREAS WHEN m m
00
LVL 98.9 m
00
44. 44.

419
X 77.31 m
BROKEN DOWN TO - 20cm. GI 11 X 77.87 m

580

529
Y 154.12 m

650

609
GIT = 98.90 LVL 98.8 m Y 229.85 m

47.52m²
X 75.48 m
LVL 99.25 m

420
POOL
IL = 96.91 Y 95.3 m 0,9m CUT
• CONCRETE "PIECES" LARGER THAN 20cm MUST BE GI 34 6.04 m

579

530
649

610
C X 74.13 m
LVL 99 m G L GIT = 98.80 X 77.87 m
SPOILED AND MAY NOT BE USED IN FILL. ILL FIL Y 237.35 m

421
173.62 m

mF Y 82.81 m m IL = 97.86 X 72.53 m X 72.53 m X 72.53 m X 72.53 m X 72.53 m


0,2 0,4 LVL 99.25 m

578

531
648

611
LVL 99.15 m Y 181.13 m Y 198.13 m Y 215.13 m Y 232.17 m Y 240.66 m
LVL 99 m LVL 99 m LVL 99 m LVL 99.02 m LVL 99.63 m

APPROXIMATELY 2,0m CUT DEPTH


87.50 m
422
• THE ENTIRE SITE MUST BE CLEARED AND GRUBBED.
.

484
577

532
647

612
ALL RUBBLE (OTHER THAN 20cm CONCRETE
0m 0m

423
Ø3

2.5

483
"PIECES") AND ALL DELETERIOUS MATERIAL MUST
SW m m

2.5
X 67.23 m X 66.75 m

576

533
646

613
X 67.6 m
00

Y 3.43 m Y 159.62 m

99.10

99.20
BE REMOVED TO SPOIL.
LIN PIPE

99.30
Y 94.9 m X 66.03 m

99.40
LVL 98.8 m

99.50
LVL 98.9 m

3.00 m
424

99.60

99.70
JCT 2 / GI 2 JCT 5 / GI 24

99.80
482
LVL 98.98 m Y 223.67 m

99.90

100.00
E4

100.10

100.20
575

534
645

614

100.30
GIT = 98.975

100.40
GIT = 98.95 GI 35 LVL 99.03 m

100.50

100.60

100.70
69. m

100.80
69. m

100.90
IL = 97.66
67.

IL = 96.65

67.
• THE ENTIRE CLEARED AND GRUBBED SITE THAT WILL

101.00
GIT = 98.90

425
X 62.53 m X 62.53 m X 62.53 m X 62.53 m X 62.53 m

481
75

75
IL = 97.91
75

75

514

485
574

535
644

615
X 61.34 m Y 181.12 m Y 198.13 m Y 215.13 m Y 232.17 m Y 240.68 m
BE IN FILL MUST THEN BE COMPACTED TO 90%
m

m
Y 70.79 m X 60.6 m LVL 99 m LVL 99.01 m LVL 99.02 m LVL 99.04 m LVL 99.74 m

426
MAXIMUM DRY DENSITY (MDD) PRIOR TO LVL 98.8 m Y 98.55 m

480
513

486
573

536
643

616
LVL 98.95 m

101.00 m (2,0m HIGH CONCRETE RETAINING WALL


COMMENCING WITH ANY CUT / FILL OPERATIONS, TO GI 12 GI 25 X 56.2 m

427
GIT = 98.90

479
A DEPTH OF 150mm. X 58.22 m GIT = 98.95 Y 165.12 m

512

487
572

537
642

617
IL = 97.02 Y 86.11 m IL = 97.72

77.50 m
LVL 98.9 m 99.
X 55.79 m LVL 99 m
00
0m

428
#1
Y 9.4 m
4.0

478
• PRIOR TO THE COMMENCEMENT OF ANY WORK TO GI 36

511

488
571

538
641

618
LVL 98.9 m
M

189.41 m
WIDEN THE EXISTING CARRIAGEWAY, PERMISSION #2 IU GIT = 98.90
OR 5m²

429
M IL = 97.96 X 52.53 m X 52.53 m X 52.53 m X 52.53 m X 52.53 m

477
GI 3
IU X 50.93 m I T

510

489
570

539
.7

640

619
Y 181.13 m Y 198.13 m Y 215.13 m Y 232.17 m Y 240.69 m
MUST BE OBTAINED FROM THE RELEVANT ROAD OR 5m² D 5
A U 3 4 1 7 9 9 .2
GIT = 98.90 Y 103.59 m LVL 99.01 m LVL 99.03 m LVL 99.04 m LVL 99.06 m LVL 99.85 m
AUTHORITY TO WORK IN THE ROAD RESERVE. IL = 96.75 DI T .7 5 LVL 98.9 m
Y

476
A U 3 4 1 7 9 9 .2 FF
E
WA 5

509

490
569

540
639

620
GI 26
E T H .1
FF PA E 99

430
X 47.49 m GIT = 98.90

475
• PLATFORM A IS FOR THE IMMEDIATE VICINITY OF THE

508

491
568

541
638

621
Y 96.21 m IL = 97.80
FF

62.50 m
37.50 m
AUDITORIUMS AND IS MOSTLY TO BE CUT / FILLED LVL 99.25 m X 44.77 m

431
0

Y 171.09 m

474
.9

TO 99.000.
98

507

492
X 44.36 m

567

542
637

622
LVL 99 m

Ø3
SW m m
Y 15.36 m
T
THEN THE PLATFORM IS TO HAVE A 125mm THICK CU

432
00
LVL 98.8 m X 42.81 m X 42.53 m X 42.53 m X 42.53 m X 42.53 m X 42.53 m

473
m GI 37

LIN PIPE
Y 80.45 m 0,4

506

493
566

543
636

623
Y 181.13 m Y 198.13 m Y 215.13 m Y 232.17 m Y 240.7 m
LAYER (IMPORTED ON TOP AND COMPACTED AS
MU CH

LVL 98.9 m GIT = 99.00

E7
GI 4 LVL 99.03 m LVL 99.05 m LVL 99.06 m LVL 99.07 m LVL 99.96 m
IL = 98.02

433
PER THE LAYER WORKS CROSS SECTION)

472
GIT = 98.80
LT ANG .20 .25

PA 99

GI 13

505

494
565

554
635

624
0

APPROXIMATELY 2,0m CUT DEPTH


FF

IL = 96.85
.0

GIT = 98.90 X 38.61 m


I- P
99

T H .2 0
Ø3
SW m m

434
IL = 97.13 Y 110.01 m
E

471
• PLATFORM B IS FOR THE PARKING AREA AND IS TO BE
00

LVL 98.93 m
UR E RO ²

504

495
564

555
634

625
WA
LIN PIPE

GI 27
CUT / FILLED TO 150mm BELOW THE FINAL LEVELS.
1

X 36.12 m X 36.3 m GIT = 98.93 X 36.29 m X 36.47 m

435
PO O
E2

FF
4

470
Y

Y 79.43 m Y 76.52 m Y 170.99 m Y 168.08 m


THEN 150mm G4 / G5 IS TO BE IMPORTED IL = 97.90

503

496
9

563

556
633

626
LVL 99.25 m
E9

LVL 99.15 m LVL 99.25 m LVL 99.15 m


SE MS

T X 33.15 m T
THROUGHOUT AND STABILIZED AS PER THE X 32.92 m CU CU
0

436
Y 85.49 m
18.
.1

m X 32.53 m X 32.53 m X 32.53 m X 32.53 m X 32.53 m

469
m 0,9
99

1.5

m
9

1.5
Y 21.33 m 0,7 B F

502

497
562

557
632

627
RO

LVL 98.8 m Y 181.13 m Y 198.13 m Y 215.13 m Y 232.17 m Y 240.72 m


LAYERWORKS CROSS SECTION.
65

LVL 98.9 m
0m

0m
LVL 99.04 m LVL 99.08 m LVL 99.08 m LVL 99.09 m LVL 100.03 m
m

437
GI 14
OM

X 30.86 m

468
5.00 m
11.

501

498
561

558
631

628
2,5m BUILDING LINE

GI 5 GIT = 98.80 Y 104.64 m

2.50 m
73

GIT = 98.90 IL = 97.19 LVL 99.25 m 12.00 m 10.00 m 7.00 m 10.00 m 7.00 m 10.00 m 12.00 m
/

438

467
IL = 96.95
m

T A 03-11-2018 FOR COMMENT

500

499
560

559
630

629
0

CU 57.50 m
.2

ABBREVIATIONS m X 26.28 m
99

0,8 Y 116.44 m B 06-11-2018 FOR COMMENT

439

2.50 m
2.50 m
5.00 m 7.00 m 5.00 m

466
GI 28
JCT JUNCTION
X 23.41 m X 23.48 m X 27.26 m
LVL 98.95 m
GIT = 98.95 C 21-11-2018 FOR ESTIMATING
IL INVERT LEVEL Y 80.41 m Y 90.53 m Y 97.74 m
B = 36.12 m

IL = 98.00
G = 75.48 m
H = 98.14 m

D = 97.97 m
C = 75.32 m

440
F = 36.29 m

X 22.53 m X 22.53 m X 22.53 m X 22.53 m X 22.53 m

465
LVL 99.25 m LVL 98.9 m LVL 99.25 m D 30-11-2018 FOR COMMENT
Y 181.13 m Y 198.13 m Y 215.13 m Y 232.17 m Y 240.73 m
GI GRID INLET X 21.48 m N
Y 27.29 m X 13.64 m
RO .15 LVL 99.1 m LVL 99.1 m LVL 99.1 m LVL 99.1 m LVL 100.05 m E 01-02-2019 FOR COMMENT
0

X 18.61 m
N
.3

441
12.

GIT GI 15 P

12.00 m
GRID INLET TOP LEVEL
99

Y 127.55 m

464
RO .15 A 99
LVL 98.8 m Y 102.24 m
0m T GIT = 98.90
40

KI P
A 99 2.4 CU LVL 99.15 m
Y
LVL 99.15 m
E F 06-03-2019 FOR COORDINATION
FF
KERB INLET 1 m IL = 97.24 X 19.33 m
WA 5
0,8 68.00 m
m

X 16.12 m

442
GI 6 E Y 172.54 m
FF

463
MARK: DATE: DESCRIPTION:
SW STORMWATER
GIT = 98.80 X 17.68 m T H .1 Y 129.07 m LVL 99 m
5.00 m 35.00 m 1.25 m 5.00 m 1.25 m 15.00 m 5.50 m
FFE FINISHED FLOOR ELEV. IL = 97.05 Y 69.42 m
T
X 13.82 m PA E 99 LVL 99.25 m
OWNER:
X 15.95 m LVL 99.25 m CU Y Y 95.57 m
FF 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462
AR 1
443 444 445 446
0

Y 37.5 m m
.4

0,8 LVL 98.9 m X 13.95 m


Associação das
99

5.50 m
LVL 99.25 m
CI L G Y 122.87 m
AN ILDIN m²
X 13.47 m T
CU

2,5m BULK EXCAVATION LINE


T LVL 98.95 m
SET OUT POINT (S.O.P) CU Y 35.98 m
1,1
m X 10.04 m
Testemunhas de Jeová
BU 53.76 .25
m
0,5 LVL 99.15 m Y 156.57 m
LVL 99 m
X Y DIAG. X 10.04 m
1 9
Y 33.25 m A F E9 CU
T
GI 16 GI 29
E
2,5m BULK EXCAVA
TION LINE
F m
0

LVL 98.95 m 1,1


A
.5

Ø3
13.47 35.98 38.42 GIT = 98.90

SW m m
Caixa Postal 6877
99

GIT = 98.95 DEPTH


IL = 97.30 ELY1,2m CUT

00
GI 7 X 12.42 m IL = 98.10 APPROXIMAT Luanda, Angola
B 36.12 79.43 87.25

LIN PIPE
GIT = 98.95 Y 86.15 m m CUT DEPTH
OXIMATELY 1,1
E = 13.64 m

X 6.68 m
A = 13.47 m

T APPR

E9
C 75.32 3.73 75.41 IL = 97.15 Y 75.15 m
m
CU LVL 99.25 m
DEPTH
1,1 ELY 1,0m CUT . NOTE: PROJECT TITLE:

99.00
99.00
LVL 99.25 m
APPROXIMAT

99.00
LANDSCAPE

APPROXIMATELY 2,3m CUT DEPTH


D 97.97 47.18 108.74
DEPTH CONCRETE TRENCH FOR PIPES

15.87 m
ELY 1,0m CUT 50.91 m 21.54 m TO SHAPE
Luanda Sul
99.10
E APPROXIMAT

26.83 m
13.64 127.55 128.27 IN UTILITY AREA NEEDED.

99.1
3,5m BULK
2,5m BUILDING LINE
.

99.2
0
F . Assembly Hall
99.20
36.29 170.99 174.80
12.30 m TAINING WALL
H CONCRETE RE

99.3
0
G 75.48 95.30 121.57 49.04 m 60.00 m (1,5m HIG 99.30 X 0.21 m

99.4
0

0
. Y 194.32 m
GI 38 99
.0

H 98.14 138.75 169.95 LVL 99.1 m

99.5
0
99.40

EXCAVAT
44 .65 m GIT = 99.10

99.6
0
IL = 98.25

WATER METER
S.O.P 156.89 m 99.50 BAIRRO SAPU LOTE NO 13

99.7
0

EXISTING

12.00 m
75.33 m

99.8
0
X 0m 99.60

EXISTING

ION LINE
SHEET TITLE:

99.9
0
Y 0m

100.0
Site Plan Overall

0
99.70
TREATED WATER
LVL 99.41m LANDSCAPE SITE PLAN

100.1
34.56 m

0
1

TO SHAPE
99.80

POW ER PO

100.2
BALANCING
18.69 m
00

0
SCALE: 1 : 300 TANK RECYCLED WATER
9 9.

100.3
WATER DOSING

0
99.90 .

RECYCLED

100.4
C = 3.73 m

0
TANK

100.5
100.00
X -9.55 m

0
A = 35.98 m LES D EPT H EXISTING
m CUT Y 243.14 m

100.6
LY 2,3 POWER POLES

0
IMATE LVL 100.55 m
100.10
X
AP PR O

100.7
D = 47.18 m

0
2,0m CUT

100.8
100.20

0
B = 79.43 m 2,0m CUT
.

100.90
HUMMUS SCALE:

0
100.30
DOSING TANK
G = 95.30 m D EPT H
G WALL 4 1. 91 m

101.00
LINE CUT
ATION LY 2,3m TAININ 1 : 300

99.00
12.00 m

E
XCAV XIMAT E

101.10
E = 127.55 m
100.40
ULK E O TE R
ONCRE
A P P R
3,5m B
HIGH C

101.20
H = 138.75 m 100.50
EPT H m (2.3m PROJECT No.
CUT D 107.824

101.30
2,3m
XIM AT EL Y AGO0391 - B00 - 01

101.40
F = 170.99 m 100.60
AP PR O . 10
10 1.50

41.91 m SUB - PROJECT No.


1.6
0

B00 - SITE PLAN


SHEET No. REV
PRINTABLE AREA
MEDIA SIZE 1190 x 840 (A0)

CG - 101 F

You might also like