Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF EDUCATION
REGION V – DIVISION OF ALBAY

ACTION PLAN ON ICT 9


INSTRUCTIONAL PERFORMANCE
OBJECTIVE STRATEGY TIME FRAME
MATERIALS INDICATORS

FIRST QUARTER
 Personal Entrepreneurial
Competencies

a. Demonstrates understanding Pre Assessment


of Personal Entrepreneurial Lecture Method Power Point Presentation Matching Type
Competencies (PECs) Collaborative learning Visual Aid 5 days Multiple Choice
Performance Standard. process Jumbled Letter (5 hours) Action Plan
b. Prepares an activity plan that Role Playing Enlarge Picture of a Successful Post Assessment
addresses his/her Entrepreneurs
development areas based on
his/her PECs and improves
further his/her areas of
strength.
 Environment and Market
Lecture Method
c. Demonstrates understanding of Collaborative learning Power Point Presentation Pre Assessment
environment and market that relates process Visual Aid 5 days Matching Type
with the career choice Conduct Mini Survey Enlarge Picture of the Needs and (5 Hours) Multiple Choice
d. Formulates a business idea based on Make an Vicinity Map Wants of People Action Plan
the analysis of the environment and Post Assessment
market.
 INSTALL COMPUTER SYSTEMS AND
NETWORKS

LO 1. Plan and prepare for installation

• Observe Occupational Health and Safety


policies and procedures in planning for
installation activity in accordance with
requirements
• Familiarize with computer hardware, Lecture Method Power Point Presentation Pre Assessment
software component and other peripherals Simulation on Occupational Visual Aid True or False
in accordance with established procedures Health and Safety Standards Video Clips 20 days Multiple Choice
on correct operation and safety policies Role Playing Pictures of a system Unit (20 Hours) Performance Score Card
• Consult appropriate/ technical personnel to Accident Report Sample Form Learning Modules Post Assessment
ensure that work is coordinated with Screw Driver Summative Test
others who are involved in the activity Periodical Test
• Obtain materials necessary to complete the
work in accordance with established
procedures
• Check the materials received against job
requirements

SECOND QUARTER

LO 2. Install equipment/devices (hardware,


software components and peripherals) and
operating systems

• Follow OHS procedures in installing


devices, systems, networking devices,
and peripherals
• Comply with the requirements in
installing devices,/systems, networking
devices, and peripherals
• Install computer systems, networking
devices and peripherals in accordance
with job requirements
• Perform installation of devices and Pre Assessment
variety of operating systems in True or False
accordance with customer/client’s Lecture Method Multiple Choice
requirements 15 days
Inductive / Discovery Method Power Point Presentation Performance Score Card
(15 Hours)
• Obtain approval from appropriate Hand’s-on Demonstration/ Visual Aid Post Assessment
personnel before implementing Activity Video Clips Summative Test
contingency procedures Pictures Periodical Test
• Respond to unplanned events or Learning Modules
conditions in accordance to established
procedures
• Check the quality of the work undertaken
in accordance with the established
procedures

LO 3. Conduct test on the installed computer


system Lecture Method Pre Assessment
15 days
Inductive / Discovery Method Power Point Presentation (15 Hours) Identification
• Follow OHS policies and procedures in Hand’s-on Demonstration/ Visual Aid Multiple Choice
conducting tests Activity Video Clips Performance Score Card
• Check circuits and systems being isolated Pictures Post Assessment
using specified testing procedures Learning Modules Summative Test
• Test devices, systems and/or installation Periodical Test
to determine its conformity with the
requirements
• Undertake final inspections on the
installed devices, systems to ensure
conformity with the requirements
• Accomplish technical reports on the tests
conducted
• Follow procedures in forwarding
documentation to appropriate personnel
and/or authority on the test conducted
THIRD QUARTER

 DIAGNOSE AND TROUBLESHOOT


COMPUTER SYSTEM

LO 1. Plan and prepare for diagnosis of


computer systems errors

• Follow OHS procedures in planning and


preparing diagnosis of computer systems
Lecture Method 30 days Pre Assessment
errors Inductive / Discovery Method Power Point Presentation (30 hrs) Identification
Hands-on Demonstration/ Visual Aid Multiple Choice
• Determine the computer systems errors
using manual and software diagnosis Activity Video Clips Performance Score Card
Troubleshoot Pictures Post Assessment
Learning Modules Summative Test
LO 2. Diagnose and configure computer
systems and networks
Periodical Test

• Follow OHS procedures in planning and


preparing diagnosis of computer systems
and network errors
• Identify the diagnosed computer systems
and network errors based on the job
requirements
• Configure computer systems and networks

FOURTH QUARTER

LO 3. Inspect and test the configured computer


systems and networks

• Follow OHS procedures in inspecting and


testing configured computer systems and
networks
• Inspect configured computer systems and
networks
• Replace defective components
• Reinstall defective computer systems
• Identify networks errors
• Repair networks errors based on standard Pre Assessment
procedures Lecture Method 30 days Identification
 Test the configured computer systems and Inductive / Discovery Method Power Point Presentation (30 hrs) Multiple Choice
networks Hands-on Demonstration/ Visual Aid Performance Score Card
Activity Video Clips Post Assessment
LO 4. Test Systems and Networks Troubleshoot Pictures Summative Test
Learning Modules Periodical Test
• Follow OHS procedures in testing systems
and networks
• Test computer systems and networks in
accordance with the job requirements
• Accomplish technical reports on the tests
conducted

Prepared by:

ZAIR A. BARNUEVO
Subject Teacher
Approved by:

ALEX RUPERTO Z. BERTILLO


Principal I

DEPARTMENT OF EDUCATION
Region V – Bicol
Division of Albay
RAWIS HIGH SCHOOL
Rawis Libon, Albay

ACTION PLAN ON ICT 10


INSTRUCTIONAL PERFORMANCE
OBJECTIVE STRATEGY TIME FRAME
MATERIALS INDICATORS

FIRST- QUARTER

 Personal Entrepreneurial
Competencies
5 days
 Develop and strengthen PECs (4 hours)
needed in Computer Hardware
Servicing. Lecture Method Power Point Presentation Pre Assessment
Collaborative learning Visual Aid Matching Type
 Environment and Market process Jumbled Letter Multiple Choice
Role Playing Enlarge Picture of a Successful Action Plan
 Develop a quality and marketable Entrepreneurs Post Assessment
product or service in Computer
Hardware Servicing
5 days
 Select a business idea based on (4 hours)
the criteria and techniques set

 Develop a brand for the product


 Configuring computer systems
and network

LO 1. Plan and Prepare for


Configuration of Computer Systems
and Networks
72 Hours (2 True or False
 Follow Occupational Health and Quarters) Multiple Choice
Safety (OHS) procedures in
Matching Type
planning and preparing for
Acronyms
configuration of computer systems
and networks; Skills Checklist
 Prepare computer systems tools,
devices, equipment and materials; Video documentation
 Check computer systems and Role playing
networks configuration against Applet grouping
specified requirements; and Research grouping
 Identify the procedures in using the Oral presentation
tools and equipment.
LO 2. Configure Computer Systems
and Networks
 Follow OHS procedures in
configuring computer systems and
networks; Criss-Cross Puzzle
 Inspect networking devices, media Short Quiz
and connectors; Matching Type
 Create cross-over and straight- Acrostic
through cables; Research Firewalls
 Assign IP address to clients and Essay
servers;
 Configure the assigned IP address
to clients and servers;
 Enable network security to the
computer systems; and
 Configure file and printer sharing.

LO 3. Inspect and Test Configured


Computer Systems and Networks
 Follow OHS procedures in testing
systems and networks;
 Test computer systems and
networks in accordance with the
job requirements; and
 Accomplish technical reports on True or False
the tests conducted. Multiple choice
Matching Type
FOURTH QUARTER Acronyms
Skills Checklist

MAINTAINING COMPUTER AND


NETWORK SYSTEMS
LO 1. Plan and prepare for the
maintenance of computer system and
networks
 Plan on how to maintain computer
systems and networks
 Identify tools in maintaining
computer systems and networks
 Inspect testing equipment and
devices
 Check PC specifications
 Verify network functions and
specifications

LO 2. Maintain computer systems

 Identify faulty computer systems


 Test normal functions of computer
systems
 Perform repair and replacement of
faulty computer systems
 Adhere to the recommended
schedule and techniques in
maintaining and cleaning computer
systems
 Respond to sudden breakdowns of
computer systems in accordance
with established procedures

LO 3. Maintain network systems


 Follow OHS procedures in
maintaining network systems
 Identify procedures in maintaining
network systems
 Check or run the diagnostic
software
 Adhere to the recommended
schedule and techniques in
maintaining and cleaning network
systems
 Respond to sudden breakdowns of
network systems in accordance to
established procedures
 Run the burn-in test on computer
systems

LO 4. Inspect and test


configured/repaired computer systems
and networks
 Maintain the computer systems
and networks to ensure safe
operations
 Run or conduct computer-to-
computer communications
 Connect computer systems to the
internet
 Check computer system and
network to ensure safe operations
 Run the burn-in test on computer
systems
 Conduct final inspection on the
tests undertaken
 Prepare technical reports that
comply with the job requirements

Prepared by:

SUERTE S. ZARAGOSA
Subject Teacher

Approved by:

ALEX RUPERTO Z. BERTILLO


Principal I

You might also like