Professional Documents
Culture Documents
11 - Ob - Nilj - Kata - 3100 - K (SH 2 of 3)
11 - Ob - Nilj - Kata - 3100 - K (SH 2 of 3)
TO SHILPHATA TO BHIWANDI 1. READ THIS DRAWING ALONG WITH DWG. NO.: 11_OB_NILJ_KATA_3100_B
AM-2 (SH 1 OF 3 & 3 OF 3)
AM-1 PM-1 PM-2
AM-1 PM-1 PM-2 REFER TABLE OF REFERENCE FOR LEVEL AM-2 TO BHIWANDI 2. READ THIS DRAWING ALONG WITH PLAN & PROFILE DRAWINGS.
TO SHILPHATA * DIFFERENCE IN TBM OF DFCCL & MSRDC CL OF EXP JOINT CL OF EXP JOINT CL OF PIER CL OF EXP JOINT CL OF EXP JOINT
3. DFCCIL AND MSRDC HAVE CONSIDERED DIFFERENT GTS BENCH MARK
OF THEIR RESPECTIVE WORKS
CL OF CARRIAGE WAY
C/C OF EXP. JOINT C/C OF EXP. JOINT C/C OF EXP. JOINT 4. FOR GENERAL NOTES, REFER DRAWING N0.: OB-NILJ-KATA-3100 _B
CL OF EXP. JOINT CL OF EXP. JOINT CL OF EXP. JOINT CL OF EXP. JOINT (SHEET 3 OF 3)
RA AO
5. FOR DETAILS OF EXPANSION JOINT REFER DWG NO :.11-MS-GEN-008.
)
CL OF BEARING CL OF BEARING CL OF BEARING CL OF BEARING CL OF BEARING CL OF BEARING
NA
ITA RB
SCOPE BY SCOPE BY SCOPE BY SCOPE BY
REFERENCE DOCUMENT
(VA KHA
MSRDC DFCC 31192(SK)/29311(SQ) C/C OF EXP. JOINT 37192(SK)/34950(SQ) C/C OF EXP. JOINT 37192(SK)/34950(SQ) C/C OF EXP. JOINT DFCC MSRDC
CS
20.000° 20.000° 20.000° GIR DOC/CTP-11/CVL/DGN/GT/0002/10001-7,
596(SK)/ 596(SK)/ 596(SK)/ 596(SK)/ 596(SK)/ 596(SK)/ REV-0
TO
TO
560(SQ) 30000(SK)/28191(SQ) C/C OF BEARINGS 560(SQ) 560(SQ) 36000(SK)/33829(SQ) C/C OF BEARINGS 560(SQ) 560(SQ) 36000(SK)/33829(SQ) C/C OF BEARINGS 560(SQ) ALIGNMENT CTP-11 : 11-AL-NLJ-2079-A REV. 0
DRAWING
20.000°
CL OF PIER
(JN ILJE
LOCK & KEY GATE/
L
CRASH BARRIER SCREEN PROTECTION(TYP.) WEARING COAT(TYP.) DECK SLAB(TYP.)
E
OPENING FOR 28.875°
REFERENCE TABLE
)
NV
PT
INSPECTION
N
RE WALL FINISHED ROAD RE WALL LEVEL
PLATFORM(TYP.)
PA
LVL. 18.105m SL. DETAIL DFCCL MSRDC
TO
DIFFERENCE
NO (m) (m)
350
350
350
(m)
80
80
80
100
100
DETAIL-'A' DETAIL-'B'
TO
1 EXISTING RAIL 6.308 5.608 0.700
1581
1581
1380
250
100
250
250
TOP LEVEL
9649(V.C)
LADDER(TYP.) 16.068m 15.933m 15.933m
9851(V.C)
PLATFORM(TYP.) 1531 (SK)
9649(V.C)
9236(V.C)
1224 (SK) / CL GIRDER
1224 (SK)/ 1713(SK)/
339 (SK)
1340 (SQ) 1330(SK)/ 1150 (SQ) LEGENDS FOR BORE LOG DETAILS
1500(SQ) CL GIRDER 700
1150 (SQ) 297 (SQ) 1250(SQ)
6852(SK)/ 4393(SK)/ 6062(SK)/ 500 AM-1/ FILLED UP SOIL
15308(SK) 6054(SK) 6833(SK) 5859 (SK) 5305(SK) 14196(SK)/12431(SQ) 6000(SQ) 3846(SQ) 15913(SK)/13935(SQ) 5300(SQ) 13886(SK)/12159(SQ) 700 200 200 AM-2
13405(SQ) 5301(SQ) 5984(SQ) 5131 (SQ) 4646(SQ) 500 SILTY CLAY
*RAIL LVL. RAIL LVL.
6.721m 200 200
100 100 100
CL OF EXP. JOINT HIGHLY WEATHERED ROCK
6.308m
GROUND LVL. FORMATION FORMATION FORMATION PILE CAP FORMATION 100 100 100 50 50 MODERATELY TO SIGHTLY
CL OF BEARINGS
LVL. 5.620m LVL. 5.949m
250
RLY.ROW
200
45°
PILE CAP 40 EJ WEARING COAT SILTY SAND
3806(SK)/ CL OF DFC'S
36
BOTTOM LVL. DECK SLAB
3333(SQ) 4547 (SK)/ DOWN TRACK 2443(SK)/ DISINTEGRATED BASALT
250
80
3982 (SQ) 2599(SQ)
200
45°
CL OF FUTURE CL OF FUTURE (MIN.) C OF EXISTING CL OF EXISTING CL OF DFC'S CL OF FUTURE CL OF FUTURE
250
18 BASALT
100 350
PILE DETAILS :-
100
TRACK TRACK L DOWN TRACK UP TRACK TRACK TRACK
25
LOCATION
DIAMETER SAFE VERTICAL SAFE HORIZONTAL UP TRACK PILE FOUNDING BROWNISH CLAY
RLY.ROW
300
PM-1 1.000 500 40
TO DESIGN WITH SHEET PILE
1500
(TYP) 64403(SK)/56396(SQ) 190 190 APPROACH SLAB BLACK SAND
PM-2 1.000 500 40 35794(SK)/31344(SQ) 16
1300
DATUM: -5.00(m) 300 350 WATER TABLE
190 190 (0.50m B.G.L) 0.0m
FINISHED ROAD LVL.(FRL) (m) NGL 4.919m
18.105 18.105 18.105 18.105 1.0m N=15
RAIL LVL. (m) 6.308 6.308 6.308 6.308 6.721 6.721 6.308 6.308 2.50m N=R
45
5.620 5.620 5.620 5.620 5.949 5.949 5.620 5.620 3.50m N=R
RAIL FORMATION LVL.(m) - - - - 4.50m N=R
45
NATURAL GROUND LVL. (m) 5.485 5.957 5.957 4.919 5.50m N=R
850 6.5m
850 N=R
PILE CAP TOP LVL. (m) 4.935 5.457 5.457 4.369 8.0m CR=37%, RQD=NIL
PILE FOUNDING LVL. (m) -4.015 -8.043 -8.043 -5.581 COMPOSITE GIRDER 9.5m CR=54%, RQD=13%
DFCC CHAINAGE (Km) 44+768
DETAIL OF GIRDER DETAIL OF GIRDER 11.0m CR=89%, RQD=77%
FOR 30.00m SPAN FOR 36.00m SPAN 12.5m
14.0m
CR=87%, RQD=87%
596 (SK) 725 (SK) 1500 CR=95%, RQD=95%
SCALE 1:25 SCALE 1:25
LONGITUDINAL SECTION FOR MAIN CARRIAGE WAY (RHS) 560 (SQ) 681 (SQ)
15.0m CR=80%, RQD=80%
FOR RHS MAIN
750
(FACING PANVEL END - PROPOSED ROB) BH-A2
SCALE 1:200 CARRIAGE WAY BY DFCC SCALE 1:300
E=297779.348
N=2120341.118
OW
WATER TABLE 0.0m NGL 5.485m
Y.R
(1.80m G.L) 1.0m
RL
N=17
750
INSPECTION 2.5m N=20
3.5m
CK
PLATFORM N=R
4.5m
RA AO
RA
TO BHIWANDI N=R
CK
ABUTMENT CAP
)
6.0m CR=40%, RQD=29%
NA
T
TO SHILPHATA
K
A
ITA RB
OW
WN
AC
TR
7.5m CR=43%, RQD=12%
Y.R
CK
TR
DO
CK
CK
CK
CK
UP
(VA KHA
1150 (SK) CR=48%, RQD=7.0%
RL
9.0m
RA
SH 3
WN
A
A
1180 (SQ)
IR
IR
A
CR=94%, RQD=79%
TR
TR
TR
TR
PT
10.5m
DO
ING
ING
CR=99%, RQD=87%
RE
RE
RE
RE
TO
U
12.0m
SH 3
C'S
C'S
IST
IST
CS
TU
TU
TU
TU
13.5m CR=99%, RQD=80%
B
DEVIATION FROM TENDER:-
DETAIL - A
EX
FU
FU
EX
DF
DF
FU
FU
15.0m CR=95%, RQD=95%
TO
SKEW ROW
L OF
L OF
L OF
L OF
L OF
L OF
L OF
L OF
DESCRIPTION SPAN CHAINAGE
ANGLE DISTANCE REMARKS PL-20 PL-22 SCALE 1:25
(m) (km) PL-21 AL-2 BH-A1
C
(deg) (m)
SCALE 1:300
OW
31192(SK)/29311(SQ) C/C OF EXP. JOINT 37192(SK)/34950(SQ) C/C OF EXP. JOINT 37192(SK)/34950(SQ) C/C OF EXP. JOINT WATER TABLE 0.0m NGL 5.957m
PM-2 (2.40m B.G.L) 1.0m N=18
OW
Y.R
80
12.0m CR=37%, RQD=NIL
250
13.5m CR=51%, RQD=NIL
100
15.0m CR=98%, RQD=90%
LHS SERVICE 16.5m
OW
CR=98%, RQD=98%
)
9500 CARRIAGE WAY
(SQ
ROAD
Y.R
19.0m
000
PLATFORM(TYP.) CR=91%, RQD=92%
20.000°
15614 (SK) 6062 (SK) 6640 (SK) 5776 (SK) 5484 (SK) 14089 (SK) 6852 (SK) 4337 (SK)
1600 (SQ)
15673 (SK) 6052 (SK) 13384 (SK)
BY MSRDC
K)/8
BH-P1
13673 (SQ) 5309 (SQ) 5814 (SQ) 5058 (SQ) 4802 (SQ) 12338 (SQ) 6000 (SQ) 3798 (SQ) 13725 (SQ) 5299 (SQ) 11720 (SQ) SCALE 1:300
3(S
E=297762.045
851
OW
N=2120322.793
1581
Y.R
1827 (SK)
RL
1600 (SQ)
16708(SK)/14631(SQ)
692(SK)/
43 FUTURE PROVISION OF 650(SQ)
\\10.100.64.6\Rail & Metro\7061466_TATA Projects CTP-11\H- Deliverables\H2- CADD\2. Technical Stage\Bridges\Bridge No. xxx (2 x 37.192)\NUMERATION\GADs\11_OB_NILJ_KATA_3100_I__SH_2__3_OF_3_14_01_20.dwg
692(SK)/
29 (SQ61 BOX FOR IR TRACKS 650(SQ)
A1 P1 (SQ52 P2 ) A1 2660(SK)/ K 14.2.2020 UPDATED AS PER DETAILED STRUCTURAL DESIGN
) 2500(SQ) J 14.1.2020 UPDATED AS PER PMC LETTER
OW
35 COMPOSITE GIRDER
79 80
90 27 (SQ95 I 17.12.19 UPDATED AS PER PMC LETTER
CARRIAGE WAY
10850 EXISTING
(SQ00 25723(SK)
36
15802(SK)
) LTR. NO.: L/OCGC/DFCC/CMT/CTP-11-1912/
15802(SK)
13838(SQ) ) 22525(SQ) 13838(SQ) 750 (SK) 596 (SK) 596 (SK) 750 (SK) 31034, DTD : 02.12.2019
OW
9593(SK) 3383(SK) 6852(SK) 4422(SK) 16144(SK) 6071(SK) 705 (SQ) 560 (SQ) 560 (SQ) 705 (SQ) H 27.08.19 UPDATED AS PER PMC LETTER
4988(SK) 3620(SK) 9593(SK) 5396(SK)
Y.R
3170(SQ) 8400(SQ) 4725(SQ) 8400(SQ) 2963(SQ) 6000(SQ) 3874(SQ) 14137(SQ) 5316(SQ) LTR. NO.: L/OCGC/DFCC/CMT/CTP-11-1907/
RL
4368(SQ)
26622, DTD : 22.07.2019
LHS EXISTING G 30.05.19 UPDATED AS PER PMC COMMENTS
EXISTING BRIDGE
MAIN CARRIAGE WAY LTR. NO.: L/OCGC/DFCC/CMT/CTP-11-1905/
W
O
Y.R
Y.R
) INSPECTION
CL OF RHS MAIN
PIER CAP
E=297724.2114 E=297742.3906 E=297750.2215 E=297776.3772 PLATFORM D 20.11.18 UPDATED AS PER PMC COMMENTS
28.875° 20.000° 1250 (SQ) RECTANGULAR
N=2120322.8816 N=2120350.1543
9500 CARRIAGE WAY
530 SK)/
LTR. NO.: L/OCGC/DFCC/CMT/CTP-11-1808/
Q)
RL
13405 (SQ) 5301 (SQ) 5984 (SQ) 5131 (SQ) 4646 (SQ) 12431 (SQ) 6000 (SQ) 3846 (SQ) 13935 (SQ) 5309 (SQ) 12159 (SQ)
147 SCALE 1:25
0(S
RHS MAIN
0(
14974, DTD : 02.08.2018
20.000° 0
564
B 19.06.18 UPDATED GAD, AS PER PMC COMMENTS
1713 (SK) CARRIAGE WAY LTR. NO.: L/OCGC/DFCC/CMT/CTP-11-1804/
EXISTING BRIDGE TO
1500 (SQ) BY DFCC
OW
49
O
2000
(SQ93
Y.R
) (SQ)
50 30 ORGANIZATION
82 0
(SQ (SQ 0 RHS SERVICE
) ) EMPLOYER :
9500 CARRIAGE WAY
PMC :
Y.R
82 D D
Y.R
C C
RL
)
PT
SH 3 SH 3
SH 3 28 SH 3
4 43 DIVISIONAL APPROVAL HQ'S APPROVAL
(SQ 2
(JN
DRM / CSMT
OW
84
J
CBE / CSMT
(SK )
Y.R
NIL
)
RL
STAIR CASE STAIR CASE DEDICATED FREIGHT CORRIDOR (N.P. SINGH) Member of the Surbana Jurong Group
ADRM/INFRA / CSMT
TO
1st Floor, Novus Tower, West Wing, Plot No.-18, Sector-18, Gurugram-122015 Haryana, India
(A.K. SINGH)
(RAJEEV TYAGI) (H.S. CHATURVEDI) DY.CE (BR-1) / CSMT TITLE: GENERAL ARRANGEMENT DRAWING ROB
CGM (SOUTH)/DFCC SR.DEN (Co.) / CSMT AT KM 44+768 (KATAI RAIL OVER BRIDGE AT
OW
Y.R
SH 3
WP
WP
WP
(JOEL THOMAS )
A
WP
VE
CONTRACTOR PMC-2R
WP
WP
WP
A0 PRELIMINARY
WP
WP
N
WP
WP
(RAMAKANT GUPTA) (N.K. SINGH)
S.S SONTAKE (CHEIF NAME SIGN
WP
PA
WP
WP
WP
CPM/S&T/DFCC SR.DSTE (Co.) / CSMT PROJECTION TECHNICAL
WP
WP
ENGINEER)
OW
WP
WP
DSGN SN
WP
STAGE
WP WP
WP WP
WP
WP
WP
WP
WP
Y.R
WP WP
WP
TO
Authorised
WP
(Rajesh Ojha)
WP
WP
WP
WP
SUBMISSION
WP
(NARMADESHWAR JHA)
RL
WP
WP
DRWN SKN
WP
WP
WP
WP
WP
WP
WP
WP
SR.DOM / CSMT
WP
GOOD FOR
WP
WP
WP WP
FIRST ANGLE
WP
NARENDRA NAGPAL
WP WP WP
WP
CHKD
WP
WP
PSH
WP
WP WP WP
CONSTRUCTION
WP
WP
SCALE :
WP
WP WP
WP
(SUPERINTENDENT
WP
WP
WP WP
WP
WP
WP
WP
WP
WP
AS BUILT
WP WP
AS SHOWN
WP
WP WP
ENGINEER)
WP WP
WP
WP
(Rajeev Pathak)
WP WP WP WP
WP WP
WP WP WP WP WP
WP WP WP
WP WP
WP
WP
WP WP WP WP WP
WP WP WP
WP
WP WP WP WP
WP WP WP WP WP WP
WP
WP
Chief Design Engineer
WP
WP WP WP
Reviewed
WP WP WP WP
WP WP WP
WP
WP
WP
WP
OW
WP WP WP
DRG. No:
WP WP WP
DATE : 17/12/2019
WP WP
WP
WP WP WP WP WP WP WP
WP WP
WP
WP
WP WP
Y.R
WP
DFCC DRG. NO:- DRM (W) FILE NO. GM (W) / CR FILE NO.
N V BOROLE
RL