Professional Documents
Culture Documents
HIRA 013 Working Over Water.
HIRA 013 Working Over Water.
REV-02 Working
over water
EBTL/ NR Fall of person Drowing Permit to work will be obtained before start of work. Y
HAZ/ Fall of material
HIRA/ Personnel working over water will be skilled and
013 experienced.
Tool box talk should be conducted before start of
the job and all hazards and safety precautions will
be explained to them.
All personnel will be working with necessary PPE's.
Full body harness and life jacket is mandetory
while working over water.
Adequate supervisory surveliance is ensured till
competion of work.
Proper access/ egress is provided.
Adequate working platform is provided with
hand rails.
Life line is provided to anchor the safety belt where
ever required.
TED - HAZIRA
K ASSESSMENT DATE: 01/09/2012
Type of Harm Risk Assessment Addition
Legal al
Damage / Risk
Probabi Total Rating Complia Control
Loss of severity Code
lity nce Measure
property s
N 2 3 6 B THE Impleme
DOCK ntation
WORKE of Work
RS permit
(SAFET System.
Y, Use of
HEALT Life
H AND jacket
WELFA
RE)
ACT,
1986