Company Guide Evaluation Sheet 2017-19 Batch

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ANNEXURE IV

Final Project Viva by Company Guide 2017 – 19 batch

Communic Ability to
Tenure: Clarity and ation, explain
Content
Sr. Name of the Starting organisation confidence queries of the Total
s: (15
No. students Date & End of thoughts: and company (50 Marks)
Marks)
Date (15 Marks) exposition: guide: (5
(15 Marks) Marks)

Name and Signature of Company Guide:

Seal of Company:

Date:

PGDM iConnect IIP Manual 2017-19 batch


ANNEXURE V
OVERALL PERFORMANCE EVALUATION 2017 – 19 batch

Name of the Student _______________________________


Tenure: Starting Date __________________ End Date ___________________
Evaluation Sheet to be used by the Company Guide (50 Marks)
(Give deserving marks in the column)
Please use a five-point scale (1 = Very low, 2 = low, 3 = average, 4 = high and 5 = very high)
Please rate the students
Particulars based on the above 5
point scale

a) Take feedback constructively and improves continuously


b) Take Initiative
c) Shows commitment and discipline at work place
d) Effective Oral & Written Communication
e) Knowledge of overall business
f) Is optimistic and eager to learn
Establish and maintain respect and professional relationship
g)
with working partners

h) Demonstrates analytical skills

i) Ability to analyses his/her own abilities


j) Overall evaluation of the intern

Name and Signature of the Company Guide with Official Seal:


Date:

PGDM iConnect IIP Manual 2017-19 batch

You might also like