PENDING POINTS OF ENGINEERIN

Sr No. Machine Description


Department
1 Granulation-1 Multimill
2 Granulation-2 Blender
3 Granulation-2 FBD-350 Kg (Gaylord)
4 Granulation-2 FBD-350 Kg (Gaylord)
5 Granulation-2 Multimill
6 Granulation-3 FBE-1300
7 Granulation-3 FBE-1300
8 Granulation-3 Exhaust Fan
9 Compression-3 Compression 51 Stun
10 Compression-7 Compression 45 Stn
11 Compression-2 Compression 61 Stn
12 Compression-1 Compression 61 Stn
13 Compression-1 Compression 61 Stn
14 Ground Floor Blister No.4
15 Ground Floor Alu,Alu Rapid Pack
16 First Floor Blister No.8 (IMA Pg)
17 Coating -1 GAC-1500
18 Coating -1 GAC-1500
19 Coating -1 & 2 GAC-1500 & 1700
20 Coating 25 HP Air Compressor
21 F.F Packing Hall Shrink M/C
22 First service floor 20 HP Air Compressor
23 Second service floor 40HP Air Dryer
24 Second service floor 42 TR Trane Chiller plant
25 Second service floor 59 TR Trane Chiller plant
26 Second service floor 140 TR Daikin Chiller plant
27 QC Department Dissolution apparatus
28 QC Department Autoclave
29 Hardgel Capsule AF-90 T Capsule M/C
30 First service floor Dehumidifier
31 Utility Area Steam Boiler
32 Utility Area Steam Boiler
33 QC Department Control sample
34 QC Department Water leakage
35 Ground floor BSR Elevator
36 Ground floor Pack Hall Elevator
PENDING POINTS OF ENGINEERING DEPARTMENT
Complaint Status Complaint Close
Description Expected date
Motor winding burnt Pending 14th May
Motor winding burnt Pending After lockdown
Finger Bag Torn Pending 15th May
Silicon Gasket damaged Pending
Coupling need to be replaced & VFD need be repair. Pending After lockdown
Finger Bag Torn Pending 15th May
Finger bag not shaking Done 12th May
Exhaust Fan N/W Pending After lockdown
Tablet jumping problem Pending
Operational parameters issue Pending
Tablet jumping problem Pending
Hydraulic system N/W Properly Pending
Right side force feeder motor faulty. Pending 14th May
Gear box shaft broken Done 12th May
HMI Display faulty Pending After lockdown
Vibrator & Vacuum pump N/W Pending After lockdown
EX,Supply & By pass damper faulty Pending
Steam actuator and bad temperature need to be replace. Pending
Spraying system, needle assembly and air cap need to be replaced. Pending
25 HP Motor one winding short Pending 15th May
Temperature not increase Pending After lockdown
Compressor Foundation broken Pending After lockdown
Air Dryer N/W Pending After lockdown
Oil change alarm,Temp sensor faulty, Cond & evap req.descalling. Pending
Oil pressure transducer faulty.Cond.Evap req.descalling. Pending
Controller faulty need to be replace. Both Chiller plant req.descalling Pending
Display N/W Pending After lockdown
Potential relay burn need to be replace. Pending
Vacuum Pump not working properly need to be replace. Pending
Steam control require to install. Pending
All three boilers oil feed pump faulty need to be replace. Pending After lockdown
Boiler no.2 Ignition transformer faulty need to be replace. Pending After lockdown
Control sample split A/C compressor faulty need to be replace. Pending After lockdown
Cooling tower side req.water proofing Pending
Lift require re installation with new support at second floor. Pending After lockdown
Showing safety alarm. ( Not Reset) Pending After lockdown
Remarks.

Motor send to vendor for rewinding


Motor send to Abhijeet Electrical
New bag order given to Raj Enterprise

New bag order given to Raj Enterprise

Quotation received from Karnavati


Quotation received from Karnavati
Quotation received from Karnavati
Quotation received from Karnavati

Send to vendor for machinery work


New HMI Quotation received from Rapid Pack

Quotation received from Gansons.


Quotation received from Gansons.
Quotation received from Gansons.

Quotation received from Daikin

New order given to vendor


Quotation received from vendor.
Quotation received from vendor.
Sr. No. MACHINE DESCRIPTION

1 Capsule filling AF-90 T


2 GAC-1500 & GAC-1700

3 GAC-1500
4 ALU,ALU Rapid Pack
5 Daikin Chiller Plant
6 Trane Chiller Plant
7 BSR Lift
8 FF Packing Hall lift
MAJOR BREAKDOWN OF MAI
COMPLAINT DESCRIPTION

Vacuum pump not working


Spraying system, needle assembly and air cap need to be replaced.
EX,Supply & By pass damper faulty
Steam actuator and bad temperature need to be replace.
HMI Display faulty
Both Daikin chiller plant not in operational.
Oil pressure transducer faulty.Cond.Evap req.descalling.
Track came out from the wall
Door Sensor Faulty
AKDOWN OF MAINTENANCE DEPARTMENT
PLAN OF ACTION

Pump need to be changed


Need to be replace.

Need to be replace.
Need to be replace.
Controll card faulty need to be replace.

Lift require re installation with new support at second floor.


Sensor need to be replace.
REMARKS
Pump working from last 6 years and many times repaired
and also backup from FBP pump but now it need to be repalced.

Three Chiller plant are breakdown so none of the AHU's will be functional in audit.