Concrete Pour Card by Tremie Method

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

CONSTRUCTION OF LNG TERMINAL AT MUNDRA

CLIENT: GSPC LNG LTD. (GLL)

CONTRACTOR: APSEZL

SUB-CONTRACTOR: SIMPLEX INFRASTRUCTURES LTD.


QA / QC FIELD INSPECTION RECORDS
Format No. : SIL/APSEZL / QA / QC / FIELD / 04
CONCRETE POUR CARD FOR PILE BY TREMIE METHOD
Project - Project Code -
Contractor -
Structure - Date -
Drawing no. Grade of Concrete -

Witnessed by
Sl. No. Inspection Details Required Observation
Contractor's APSEZL GLL
A Pre Pour Inspection
1 Pile location (Co ordinates)
2 Founding level of bore (RL)
3 Ground/Bed level (RL)
7 SPT-N value, if any
8 Flushing start Date Time
9 Flushing finish Date Time
10 Density of stabilizing fluid after flushing 1.04 to 1.12 g/ml
11 Reinforcement Cage As per drawing
12 Insitu welding As per drawing
13 Cover block size and installation As per drawing
14 Top level of Reinforcement (RL) As per drawing
15 Tremie diameter
16 Gap between founding level and tremie pipe Min 1.0 M
Availability of adequate and efficient pump,
17
TM and other resouces
HOLD POINT
B During Concrete pouring

1 Grade of concrete As per approved Mix design


2 Slump of concrete at pouring place 150 to 180 mm
Time Date
3 Pour start

Time Date
4 Pour finish

5 Concrete top (RL)


6 Cut of Level (RL)
7 Theoritical quantity of concrete (Cum) As per drawing
8 Actual quantity of concrete (Cum)
9 No. of concrete cubes taken

SIMPLEX APSEZL GLL


Signature Signature Signature
Name Name Name
Date Date Date