Concrete Pour Card by Tremie Method
Concrete Pour Card by Tremie Method
Concrete Pour Card by Tremie Method
CONTRACTOR: APSEZL
Witnessed by
Sl. No. Inspection Details Required Observation
Contractor's APSEZL GLL
A Pre Pour Inspection
1 Pile location (Co ordinates)
2 Founding level of bore (RL)
3 Ground/Bed level (RL)
7 SPT-N value, if any
8 Flushing start Date Time
9 Flushing finish Date Time
10 Density of stabilizing fluid after flushing 1.04 to 1.12 g/ml
11 Reinforcement Cage As per drawing
12 Insitu welding As per drawing
13 Cover block size and installation As per drawing
14 Top level of Reinforcement (RL) As per drawing
15 Tremie diameter
16 Gap between founding level and tremie pipe Min 1.0 M
Availability of adequate and efficient pump,
17
TM and other resouces
HOLD POINT
B During Concrete pouring
Time Date
4 Pour finish