Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

PROJECT OF RENOVATION OF BUILDING FACILITY FOR INSTALLING FROZEN D

MANUFACTURING PLANT

Item No Description of Works Unit Qty


Re-PU work
Supply and laying of 2mm thick Re-PU work to
1 existing PU finished areas m2 983.00

New PU work
Suply and laying of 4mm thick PU floor finish to new
2 areas m2 501.00

3 Supply and laying PU finish to concrete curbs m2 146.00


4 Making PU coving to side walls m2 228.00

Contact Details- 0772926450 ( Hashan)


Solid Lanka Engineering (PVT)Ltd
R INSTALLING FROZEN DOUGH
T

Rate Amount

-
-
-
-

You might also like