Hi H1 x d H+x*c/d ( c=1m )
H1 315 20.19 24.82 315.81
H2 317 13.2 40.14 317.33
H3 318 16.11 43.98 318.37
H4 319 9.83 22.2 319.44
H5 320 15.11 16.97 320.89
H6 314 9.23 21.1 314.44
H7 315 24.98 27.26 315.92
H8 316 13.4 29.77 316.45
H9 317 7.75 31.95 317.24
H10 318 18.88 29.73 318.64
H0 315 18.28 33.24 315.55
H11 312 21.72 28.47 312.76
H12 313 23.12 29.09 313.79
H13 314 23.89 33.3 314.72
H14 315 27.44 35.61 315.77
H15 317 9.81 29.61 317.33
H16 311 7.07 29.74 311.24
H17 312 18.78 40.34 312.47
H18 313 28.3 46.19 313.61
H19 314 34.3 38.52 314.89
H20 316 4.54 30.18 316.15
H11 H22 H33 H66
315.81 320.89 317.33 315.92
316.15 311.24 318.37 316.45
319.44 317.24
314.44 313.79
318.64 314.72
312.76 315.77
317.33
312.47
313.61
314.89
∑ 631.96 632.13 3,159.27 1,893.89

брой на триъгълните призми m = 24

H нулево ( кота на подравняване ) = 315.92

a=21
b=93 V= 5,536.80 m3
a1= 27
b1= 99
Теренни коти Проектни коти Работни коти
Hi H1 x d H+x*c/d ( c=1m )
H1 315 20.19 24.82 315.81 315.86 0.05
H2 317 13.2 40.14 317.33 315.98 -1.35
H3 318 16.11 43.98 318.37 316.10 -2.27
H4 319 9.83 22.2 319.44 316.22 -3.22
H5 320 15.11 16.97 320.89 316.34 -4.55
H6 314 9.23 21.1 314.44 315.74 1.30
H7 315 24.98 27.26 315.92 315.86 -0.06
H8 316 13.4 29.77 316.45 315.98 -0.47
H9 317 7.75 31.95 317.24 316.10 -1.14
H10 318 18.88 29.73 318.64 316.22 -2.42
H0 315 18.28 33.24 315.55 315.92 0.37
H11 312 21.72 28.47 312.76 315.62 2.86
H12 313 23.12 29.09 313.79 315.74 1.95
H13 314 23.89 33.3 314.72 315.86 1.14
H14 315 27.44 35.61 315.77 315.98 0.21
H15 317 9.81 29.61 317.33 316.10 -1.23
H16 311 7.07 29.74 311.24 315.50 4.26
H17 312 18.78 40.34 312.47 315.62 3.15
H18 313 28.3 46.19 313.61 315.74 2.13
H19 314 34.3 38.52 314.89 315.86 0.97
H20 316 4.54 30.18 316.15 315.98 -0.17
мащаб *10 за нулевата линия

0.47
-13.49
-22.66
-32.23
-45.50
13.03
-0.56
-4.70
-11.43
-24.15
3.70
28.57
19.45
11.43
2.09
-12.31
42.62
31.54
21.27
9.70
-1.70
Работни коти
±h1,±h2,±h3 или
±h1³/ (|
h1| +|h2 | ) . (|h1| +|
№ призма h1 h2 h3 h3 | ) a²/6 Vp Vи Vн
1' -1.35 0.05 1.30 -0.66 600 0.00 -397.90
1'' -1.35 0.05 1.30 0.00 600 0.00 397.90
2' 1.30 -0.06 -1.35 0.61 600 -66.00 365.76
2'' 1.30 -0.06 -1.35 -0.11 600 -66.00 -431.76
3 -0.06 -1.35 -2.27 -3.68 600 -2,208.00
4 -0.06 -0.47 -2.27 -2.80 600 -1,680.00
5 -0.47 -2.27 -3.22 -5.96 600 -3,576.00
6 -0.47 -1.14 -3.22 -4.83 600 -2,898.00
7 -1.14 -3.22 -4.55 -8.91 600 -5,346.00
8 -1.14 -2.42 -4.55 -8.11 600 -4,866.00
9' -0.06 1.30 2.86 0.00 600 2,460.00 -0.03
9'' -0.06 1.30 2.86 4.10 600 2,460.00 2,460.03
10' -0.06 1.95 2.86 0.00 600 2,850.00 -0.02
10'' -0.06 1.95 2.86 4.75 600 2,850.00 2,850.02
11' 1.95 -0.06 -0.47 1.52 600 852.00 914.63
11'' 1.95 -0.06 -0.47 1.42 600 852.00 -62.63
12' -0.47 1.14 1.95 -0.03 600 1,572.00 -15.99
12'' -0.47 1.14 1.95 2.62 600 1,572.00 1,587.99
13' 1.14 -0.47 -1.14 0.40 600 -282.00 242.16
13'' 1.14 -0.47 -1.14 -0.47 600 -282.00 -524.16
14' -1.14 0.21 1.14 -0.48 600 126.00 -288.80
14'' -1.14 0.21 1.14 0.21 600 126.00 414.80
15' 0.21 -1.14 -2.42 0.00 600 -2,010.00 1.57
15'' 0.21 -1.14 -2.42 -3.35 600 -2,010.00 -2,011.57
16' 0.21 -1.23 -2.42 0.00 600 -2,064.00 1.47
16'' 0.21 -1.23 -2.42 -3.44 600 -2,064.00 -2,065.47
17 4.26 2.86 1.95 9.07 600 5,442.00
18 4.26 3.15 1.95 9.36 600 5,616.00
19 3.15 1.95 1.14 6.24 600 3,744.00
20 3.15 2.13 1.14 6.42 600 3,852.00
21 2.13 1.14 0.21 3.48 600 2,088.00
22 2.13 0.97 0.21 3.31 600 1,986.00
23' -1.23 0.21 0.97 -0.59 600 -30.00 -352.44
23'' -1.23 0.21 0.97 -0.05 600 -30.00 322.44
24' 0.97 -0.17 -1.23 0.36 600 -258.00 218.34
24'' 0.97 -0.17 -1.23 -0.43 600 -258.00 -476.34
-27,201.11 32,505.11
V -5,536.80
-32,737.91 32,505.11
разлика -232.80
λ= 0.72%
багер II зона 15,120.84

изкоп скрепер 10,362.00

-15,117.81 3.03
Баланс на земните маси
Вид работа Изкоп,м3 Насип,м3
Изкоп за съоръжения 5,536.80
Изкоп за вертикална планировка 27,201.11
Насип за вертикална планировка 32,505.11
Сума: 32,737.91 32,505.11
№ Вид работа Количество, m3 Вид механизация
A. Механизация за строителна яма
Багер хидравличен с
1 Изкоп яма 5,439
обратна лопата
2 Почистване на багерен изкоп яма 98 Булдозер
Б. Механизация за В.П
1 Изкоп насип за В.П. I зона 30м от нулева линия 6,900 Булдозер
2 Изкоп насип за В.П. II зона 14,581 Скрепер
3 Почистване на багерния изкоп 540 Булдозер
4 Изкоп насип за В.П. 37,685 Скрепер
5 Уплътняване 32,505 Валяк
Изкоп насип за В.П. с Булдозер около нулева линия
6900 м3
3,450

27,323
Количест Вид Произв. Пei, цена
№ Вид работа тр.разст. зона Марка бр. мсм
во, m3 механизация m3, мсм мсм

Багер
1 Изкоп яма 5,439 II хидравличен с UB 631 250 22 300
обратна
лопата

Изкоп насип за
2 вертикална 6,900 I Булдозер ДЗ – 27С 834 8 450
планировка

Изкоп насип за
Самоходен
3 вертикална 52,266 III Д3 – 67 695 75 390
скрепер
планировка
Почистване на
4 багерния изкоп 638 II Булдозер ДЗ – 27С 834 1 450

7 Уплътняване 32,505 I,II,III Валяк ДУ - 26 2712 12 400


Обща стойност

2.61
Стойност в
лв.

6,526.98

3,723.02

29,329.24

344.06

4,794.26
44,717.56