PROPOSED SALES LINE

(TIE IN POINT)
AVAILABLE SPACE
SDV (16" ) MANUAL ISOLATION
16"SALES GAS SUPPLY TO NGC VALVE(16" )
FOR PROPOSED PIPE RACK
(2.05M WIDTH)
16"SALES GAS SUPPLY TO NGC
4" FUEL GAS LINE (SCRUBBER TO F/S)
4" FUEL GAS SUPPLY LINE (F/S TO PROCESS MODULE)
10" CONDENSATE LINE TO SURGE
2" PRODUCTION WATER LINE
2" INSTRUMENT AIR LINE
10" LP TO FLARE
4" CLOSED DRAIN LINE
METAL STAIR BRIDGE
MANIFILD

MANIFILD

BULK LINE TO
MODULE 1
PRODUCTION

PRODUCTION

BULK LINE TO
MODULE 2
METAL STAIR BRIDGE
10"PRODUCTION HEADER
SAND FILTER DISCHARGE

TEST HEADER (6")

( TIE IN POINT)
HEADER

( TIE IN POINT)
6"TEST HEADER
FUTURE COMPRESSOR AREA
FLARE SITE

FLOW STATION SITE


SIDE ELEVATION

PLAN

FRONT ELEVATION