Professional Documents
Culture Documents
Train 1 - PGA
Train 1 - PGA
Train 1 - PGA
(TIE IN POINT)
AVAILABLE SPACE
SDV (16" ) MANUAL ISOLATION
16"SALES GAS SUPPLY TO NGC VALVE(16" )
FOR PROPOSED PIPE RACK
(2.05M WIDTH)
16"SALES GAS SUPPLY TO NGC
4" FUEL GAS LINE (SCRUBBER TO F/S)
4" FUEL GAS SUPPLY LINE (F/S TO PROCESS MODULE)
10" CONDENSATE LINE TO SURGE
2" PRODUCTION WATER LINE
2" INSTRUMENT AIR LINE
10" LP TO FLARE
4" CLOSED DRAIN LINE
METAL STAIR BRIDGE
MANIFILD
MANIFILD
BULK LINE TO
MODULE 1
PRODUCTION
PRODUCTION
BULK LINE TO
MODULE 2
METAL STAIR BRIDGE
10"PRODUCTION HEADER
SAND FILTER DISCHARGE
( TIE IN POINT)
HEADER
( TIE IN POINT)
6"TEST HEADER
FUTURE COMPRESSOR AREA
FLARE SITE
PLAN
FRONT ELEVATION