Saudi Arabian Oil Company: SECTION 13850 - Fire Alarm and Detection System / Page 7 of 8

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. Fire Alarm Control Panel/ Fire Alarm Annunciator Panel


ENGG CERT

a. Fire Alarm Control Panel UL864, 9th Edition, UL Listed, liquid crystal
display module and control display modules, Central Processor Unit
(CPU), Signature Drivers Controller Modules - SDDC1, lobby enclosures
with chassis assemblies, cabinet accessories with 4 loop, power supplies,
primary power supply with local rail module 230VAC, 60Hz. Manufacturer
Reference EST3X, by Edwards or approved equal.

b. Fire Alarm Annunciator Panel: UL Listed remote command module


annunciator. Model 3-LCDANN/ 3-3ANN. Designed and manufactured as
DESCRIPTION

per ISO 9001 standard, with programmable annunciator configuration of


LED and LCD display, graphical display up to 168 characters, with CPU,
with semi recessed mounted enclosure Model RLCM/B. Manufacturer
Reference: G.E. Edwards/or approved equal.

PART 3 – EXECUTION

3.01 EXAMINATION
JO/EWO

A. Examine areas and conditions under which fire alarm and gas leak detection
system are to be installed. Do not proceed with work until unsatisfactory
conditions have been corrected in manner acceptable to Installer.
DATE

3.02 INSTALLATION OF FIRE ALARM SYSTEM


NO.
REV

DISCIPLINE
ENGINEER
A. Install fire alarm system as indicated, in accordance with equipment
BOS manufacturer's written instructions and complying with applicable portions of
DATE: 12-13-18 NEC and NECA's "Standard of Installation."
PROJECT
ENGINEER
JPM B. Wiring: Wiring of fire alarm system is work of this section, but is not specifically
DATE:
12-16-18 detailed on drawings.
CERTIFIED
HAK
1. Complete wiring in accordance with manufacturer's requirements. Color
12-16-18
DATE: code wiring and install per manufacturer's point-to-point wiring diagram.
CONSTRUCTION
AGENCY Determine exact number of wires for each fire area zone from number
MAK and types of devices installed. Connect each device with sufficient wiring
12-16-18
DATE: to complete its intended operation.
OPERATIONS

NLS 2. Where there are a number of power requiring devices such as smoke
DATE:
12-17-18 detectors and smoke damper operators installed in a circuit, group in
numbers so power required does not exceed 80% of manufacturer's
CONTROL NUMBER
VERIFICATION

power supply rating. Provide extra wiring, or extra power supplies


EDSD

required to fulfill that requirement. In addition, provide extra or larger size


wiring to alleviate voltage drops which makes device operate beyond
DATE:
BY:

voltage limits for which it was designed. Determine above with


REVISIONCERTIFICATION

manufacturer's representative while equipment is being installed.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

SECTION 13850 – FIRE ALARM AND DETECTION SYSTEM / PAGE 7 OF 8


18U070-070

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

FIRE PROT. AND DETECTION AT B-223 DOC 139


130 A HE-007821
SAUDI ARAMCO SCHOOLS of 00
DHAHRAN SAUDI ARABIA JO/EWO 18U070 171
(BSP-081(A) - CGD, NEH, RMM) ISSUE DATE: 1-15-2019 100%