Reff - No: Tz/est/may-20/04
Reff - No: Tz/est/may-20/04
C
ROOF RESIDENTIAL BUILDING AT SITE.NO. 48 IN S.F.NO:355/3, KAMACHIYAMMAN NAGAR,
VADUGAPALAYAM VILLAGE , PALLADAM TALUK, TIRUPUR DT.
GROUND FLOOR : -
Sundries 0.61
Sundries 0.64
Column (super structure) 12 0.30 0.23 4.05 3.35 12000 Cu.m 40241
42.95
Sundries 0.19
Sundries 0.83
Sundries 0.39
Sl. D Total Amount in
Description of Work No. L (m) B (m) Quantity Rate Unit
No. (m) Rs.
Sundries 0.64
72.00 1500 Sq.m 52503
Sl. D Total Amount in
Description of Work No. L (m) B (m) Quantity Rate Unit
No. (m) Rs.
Sundries 0.15
228.00 300 sq.m 68401
Sl. D Total Amount in
Description of Work No. L (m) B (m) Quantity Rate Unit
No. (m) Rs.
21 Tile Flooring
FF M.bed room 2 3.05 3.35 20.43
FF Toilet 2 1.73 1.36 4.71
Passage 1 1.88 2.13 4.01
Sundries 0.86
30.00 1200 Cu.m 36004
Proposed construction of
26 1 Ls 60000
staircase item
Abstract
Cost of Ground Floor 1901001
Amenities 265000
TOTAL Rs 2166001.39
2166000.00
(SAY RUPEES TWENTY ONE LAKHS AND SIXTY SIX THOUSAND ONLY)
8.49
8.38
DETAILED CUM ABSTRACT ESTIMATE FOR THE PROPOSED CONSTRUCTION OF GROUND FLOOR R.C.C ROOF RES
APPLICANT:
Mrs.K.Nagaraj, S/O.Mr.Karupanan Gounder
Sl. No. DescriptionNo. L (m) B (m) D (m) Quantity Rate Unit
GROUND FLOOR : -
1 Earth work excavation in all types of soil with initial lead and lift for Columns
Column 15 1.22 1.22 2.44 54.48
Wall allrount 1 67.68 0.6 1.45 58.88
Sundries 0.93
114.29 170 Cu.m
2 PCC Concrete for the earth works using 1:5:10 mix concrete
Column 15 1.22 1.22 0.3 6.7
Sundries 0.3
7 3500 Cu.m
4 R.C.C. Work in CC 1:2:4 mix(used 20mm metal & TMT steel bar )
Coloum Footing 15 1.22 1.22 0.23 5.13
ColoumBase 15 1.37 0.46 9.45
Sundries 0.41
15 14500 Cu.m
5 R.C.C. Work in CC 1:2:4 mix(used 20mm metal & TMT steel bar )
Column (substructure) 15 0.3 0.23 3.05 3.16 15000 Cu.m
6 R.C.C. Plinth Beam in CC 1:2:4 mix(used 20mm metal & TMT steel bar )
Wall allrount 1 67.68 0.23 0.3 4.67
Sundries 0.06
7.89 15000 Cu.m
8 R.C.C. Work in CC 1:2:4 mix(used 20mm metal & TMT steel bar )
Ground Floor Slab 1 7.088415 12.2 0.15 12.97
Beam all round 1 67.68 0.23 0.3 4.67
Cross beam 12 3.77 0.23 0.3 3.12
Sunshade 5 1.83 0.61 0.1 0.56
Sundries 0.67
21.99 12000 Cu.m
15 Supply and Fixed Door , Window & Ventilator( Teek Wood With Girl Work )
MD-Main Door 1 1.52 2.13 3.25
D1-Door 3 0.99 2.13 6.34
D-Door 1 1.22 1.22 1.49
Window 3 1.22 1.22 4.46
KW 1 1.22 0.91 1.12
FW 1 1.83 1.52 2.79
V-ventilator 1 0.61 0.46 0.28
Sundries 0.27
20 6800 Cu.m
FIRST FLOOR : -
16 R.C.C. Work in CC 1:2:4 mix(used 20mm metal & TMT steel bar )
Column (substructure) 15 0.3 0.23 3.05 3.16 15000 Cu.m
17 R.C.C. Plinth Beam in CC 1:2:4 mix(used 20mm metal & TMT steel bar )
Wall allrount 1 24.09 0.23 0.3 1.66
Sundries 0.23
5.05 15000 Cu.m
19 R.C.C. Work in CC 1:2:4 mix(used 20mm metal & TMT steel bar )
First Floor Slab 1 34.39173 1 0.15 5.16
Beam all round 1 24.09 0.23 0.3 1.66
Cross beam 3 3.77 0.23 0.3 0.78
Sunshade 3 1.83 0.61 0.1 0.33
Sundries 0.06
8 12000 Cu.m
23 Supply and Fixed Door , Window & Ventilator( Teek Wood With Girl Work )
MD-Main Door 1 1.52 2.13 3.25
D1-Door 2 0.99 2.13 4.23
D-Door 1 1.22 1.22 1.49
Window 2 1.22 1.22 2.97
V-ventilator 1 0.61 0.46 0.28
Sundries 0.27
12.49 6800 Cu.m
24 Weathering Course in Brick Jelly And lime concrete @ 0.13m Tk
Over Roof Area 1 34.39 1 34.39
Sundries 0.61
35 1500 Sq.m
25 White Wash two coat @ colour Wash one coat over plastering
AS per item (13+14) 1232.44 150 Sq.m
27 Proposed construction 2 Ls
29 Electrical work Ls
TOTAL Rs
19429
24492
176885
217471
47351
118300
237136
263835
246488
24401
170808
135992
47351
75730
109620
95955
89550
10801
142792
84952
52503
184866
19999
25000
45000
40000
6000
45000
23088
2780796
neer / Valuer
GAR, NORTH AVINASHIPALAYAM VILLAGE , TIRUPUR TALUK & DT.