Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

United Marine Surveyors

Registred on The Egyptian Insurance Supervisory Authority (Reg No.49/2010)


Marine Surveys – Inspections Services - Claims Adjusters
DRAFT SURVEY REPORT Operation No. 14/IBR/20
This is to certify that the undersigned surveyor attend on board the M/V MOHAMMED S
when she was laying at port of for the purposes to ascertain the quantity of the following
parcel by means of a Draft computation, based on the figures and vessel's documents supplied by the Vessel's staff with the
following results:
Client / Principal Joint Party
Type Flag Call Sign IMO no.
Port Registry MMSI GRT NRT
L.O.A. mtrs M. Breadth mtrs M.Depth mtrs Light Ship M/T
LBP mtrs S.Draft mtrs Free Board mtrs DWT M/T
Built place Year Classification
Ship's Owner
Master's name C. O. name Crew Nation.
Cargo : Quantity M/T Dis. Port

Vsl arrived at Road on at hrs. Vsl berthed at quay on at hrs.


Loading started on at hrs. Loading ended on at hrs.
Initial Draft oper. started on at hrs. Initial Draft oper. ended on at hrs.
Final Draft oper. started on at hrs. Final Draft oper. ended on at hrs.

Draft Calculation MTRS CMS Weight Calculation MT KG

Initial Final Initial Final


Sea Density
Corresp. Displacement
Fore Port
Fore Starboard
Heel Correction
Mean Fore
Fore Correction
Total Trim Correction
Fore Corrected
Aft Port
Displ. Corrected for heel & trim
Aft Starboard
Mean Aft
Water Density Correction
Aft Correction
Aft Corrected
Displ. Corr. for Water Dens.Corr.
Apparent Trim
True Trim
Total deductable Weights
Mid Port
Mid Starboard
Net Displacement
Mean Mid
Mid Correction
Mid Corrected
Total Quantity Loaded
Mean Fore & Aft
Seg +/Hog -
Bill of Lading Quantity
Mean of Mean

Difference
Mean of M. corr.

Deductable Weights
Ballast Constant decl. Constant Calc.
Fresh Water Enclos.:
Calc. data Deduct. weights Letter of reserve/protest
Bunkers
Others Remarks :

Totals

United Marine Surveyors Master

Address :( Main Office) No. 09 Abo El Nasr st - Ras El Teen - Alexandria -Egypt
Tel : +203 4843384 Fax : +203 4843385 Mob :+20 1280001154
email : umsegypt@umsegypt.com web : www.umsegypt.com
This surveyor agrees to use his best efforts on behalf of those for whom this survey was performed, but is expressly understood and agreed, unless mutually agreed to in writing to
the contrary, that this survey report is made without liability to the surveyor or the company for any errors or omissions, whether due to negligence or otherwise, in excess of the
amount charged for this survey report and any and all persons interested in or to be affected by this survey report herby accept this survey report on said basis.

You might also like