The document outlines the steps for installing a deck on a subsea structure. A vessel transports the deck on a cargo barge to the installation site. Personnel check the deck and secure it to the barge. They transit to the site, berth the barge alongside the vessel, and lift the deck off using the vessel crane. The deck is positioned and welded onto the pre-installed jacket, completing the deck installation. The barge is then released and transportation equipment is demobilized before moving to the next location.
The document outlines the steps for installing a deck on a subsea structure. A vessel transports the deck on a cargo barge to the installation site. Personnel check the deck and secure it to the barge. They transit to the site, berth the barge alongside the vessel, and lift the deck off using the vessel crane. The deck is positioned and welded onto the pre-installed jacket, completing the deck installation. The barge is then released and transportation equipment is demobilized before moving to the next location.
The document outlines the steps for installing a deck on a subsea structure. A vessel transports the deck on a cargo barge to the installation site. Personnel check the deck and secure it to the barge. They transit to the site, berth the barge alongside the vessel, and lift the deck off using the vessel crane. The deck is positioned and welded onto the pre-installed jacket, completing the deck installation. The barge is then released and transportation equipment is demobilized before moving to the next location.