Project Name Preparation of Detail Feasibility Study and Design Document for Implementation of Solar

Street Lighting System in various selected sites


Country Nepal

Location: - onsite/offsite Project Location within the country Chitwan, Sarlahi


Start date 24th December 2015
Completion Date Jan 30 20016

Type of Assignment Continuous

Client Name Alternative Energy Promotion Centre (AEPC)


Funding Source Alternative Energy Promotion Centre (AEPC)
Loan/TA. Grant No

Number of person
month for Entire
Project

Total Value of Whole 2400


Project (In US$)

Involved as Lead

Associate

Professional staff Number of staff: -3


provided by your
organization Number of Person Months: -3

Approximate value of services provided by hour organization in US ($):-2400

Lead firm Name of lead firm: N/A


Country of Incorporation: N/A
Number of Person-Months of Professional Staff Provided by Lead Firm: N/A
Professional Staff Name: - Dipesh Shrestha

Function Performed: - Team Leader

Period of involvement: -1

Name: - Bhas Raj Pathak

Function Performed: - Assistant Engineer

Period of involvement: -1

Brief Narrative Description of Project:

Detail Feasibility Study, detail technical design, and prepare Bid Document as per PPA/PPR guideline preparation for
implementation of Solar Street Lighting System in various selected Metropolitans, Sub-Metropolitans, Municipalities
and VDC’s of Nepal. Site visit, co-ordination with the related person/user group of the respected place, Design layout
plan and assess to the technical and financial feasibility study of street lighting system
Description of actual services provided by your organization:

1. Interact with AEPC, selected metropolitan, sub metropolitan, municipalities and VDC’s, local/user group for
better understanding of the task.
2. Conduct site visit of the selected sites.
3. Review available notional codes and specification for street lighting, LED lights and PV specification
4. Prepare detail feasibility report containing conceptual design for solar street lighting system to enable listed
companies to tender for implementation of the project. The design is taken into consideration dust, storms,
isolated installations, difficulty in maintenance, high temperature and tough operation conditions etc.
5. Prepare BoQ and cost estimation for the system and Prepare technical components of the bidding documents
including assessment criteria for bidders.
6. Analyze the financial/technical aspect, feasibility, cost effectiveness, No. of beneficiary’s and propose suitable
business plan for multi-use of solar streetlight system.
7. Prepare repair and maintenance plan and schedule.
 Project Name Consultancy services for supply, delivery, Installation and commissioning and after sales
services of Institutional Solar PV (ISPS at public Institution in various regions of Nepal

 Name of Client Suyra Roshni Industries Pvt. Ltd. JV BIrat Energy Pvt. Ltd.

 Country Nepal Project location within Country Jhapa, Morang, Okhaldhunga, Khotang,
Siraha, Udayapur, Bara, Parsa,
DArchula, Baitadi, Kanchanpur, Dotii,
Achham, Bajang, Rupandehi, Dang,
Rukum Jajarkot, Gulmi, Kavre,
Rupandehi, Argakhachi, Sindupalchowk,
Chitwam, Dhanusha, Lalitpur, SArlahi,
Nawalparasi, Kalikot.

 Participation  As lead firm



As associate firm

 Value of Services 1000000

 Source of Financing Suyra Roshni Industries Pvt. Ltd. JV BIrat Energy Pvt. Ltd.

 Consultancy Services
(i) No. of staff 10

(ii) No. of person months 20

Length of Consultancy Assignment:

 Start Date 7June 2017 (dd/mm/yyyy)

 Completion Date 10 October 2017 (dd/mm/yyyy)

 Name of Associate Firms (if any)

 No. of Person-Months of Professional Staff Provided by Associated Firm(s): NA


 Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Name of Personnel Position

Puskar Wagley Electrical Engineer (Team leader)

Saroj Remi Solar Technician

Suyra Chaudhary Solar Technician

 Detailed Narrative Description of the Project


 Coordinate with 117 schools and campus and 4 health post/hospital to audit the energy
requirement.

 Design the Solar PV system layout

 Monitor the installation process and quality of Solar PV System.

 Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
 Detailed Description of the Actual Services Provided by your Firm
 Coordinate with schools and health post to audit the energy requirement.

 Design the Solar PV system layout

 Monitor the installation process and quality of Solar PV System.

 Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
 Project Name Consultancy services for Installation of Solar Backup System

 Name of Client BIrat Energy Pvt. Ltd./

 Country Nepal Project location within Country Kathmandu

 Participation  As lead firm



As associate firm

 Value of Services 100000

 Source of Financing WEbsurfer Nepal

 Consultancy Services
(i) No. of staff 2

(ii) No. of person months 2

Length of Consultancy Assignment:

 Start Date 3 December 2015 (dd/mm/yyyy)

 Completion Date 20 Jan 2016 (dd/mm/yyyy)

 Name of Associate Firms (if any)

 No. of Person-Months of Professional Staff Provided by Associated Firm(s): NA


 Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Name of Personnel Position

Ramesh Sharma Electrical Engineer

Saroj Remi Solar Technician

Suyra Chaudhary Solar Technician

 Detailed Narrative Description of the Project


 Coordinate to audit the energy requirement.

 Design the Solar PV system layout

 Monitor the installation process and quality of Solar PV System.

 Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,

 Detailed Description of the Actual Services Provided by your Firm


 Coordinate with schools and health post to audit the energy requirement.

 Design the Solar PV system layout

 Monitor the installation process and quality of Solar PV System.


 Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
 Project Name Consultancy services for Installation of Solar Backup System

 Name of Client BIrat Energy Pvt. Ltd.

 Country Nepal Project location within Country Kathmandu

 Participation  As lead firm



As associate firm

 Value of Services 100000

 Source of Financing Yomari Incorporated

 Consultancy Services
(i) No. of staff 2

(ii) No. of person months 2

Length of Consultancy Assignment:

 Start Date 2 Jan 2017 (dd/mm/yyyy)

 Completion Date 21 February 2107 (dd/mm/yyyy)

 Name of Associate Firms (if any)

 No. of Person-Months of Professional Staff Provided by Associated Firm(s): NA


 Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Name of Personnel Position

Ramesh Sharma Electrical Engineer

Saroj Remi Solar Technician

Suyra Chaudhary Solar Technician

 Detailed Narrative Description of the Project


 Coordinate to audit the energy requirement.

 Design the Solar PV system layout

 Monitor the installation process and quality of Solar PV System.

 Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,

 Detailed Description of the Actual Services Provided by your Firm


 Coordinate with schools and health post to audit the energy requirement.

 Design the Solar PV system layout

 Monitor the installation process and quality of Solar PV System.


 Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
Project Name 12th Round Quality Assurance and Monitoring of Solar Home System (SHS)
Country Nepal

Location: - onsite/offsite Project Location within the country Khotang, Sankhuwasabha, Rolpa, Jarjarkot, Bajhang,
Dhading, Surkhet, Accham
Start date 1 June 2013
Completion Date 10 October 2013
Type of Assignment Continuous

Client Name Alternative Energy Promotion Centre (AEPC)


Funding Source Alternative Energy Promotion Centre (AEPC)
Loan/TA. Grant No

Number of person
month for Entire
Project

Total Value of Whole 11500


Project (In US$)

Involved as Lead

Associate

Professional staff Number of staff: -23


provided by your
organization Number of Person Months: - 30

Approximate value of services provided by hour organization in US ($):-11500

Lead firm Name of lead firm: Sustainable Infrastructure Development Foundation (SIDeF)
Country of Incorporation:-Nepal
Number of Person-Months of Professional Staff Provided by Lead Firm: -0
Professional Staff Name: - Bhanu Timseena

Function Performed: - Sociologist

Period of involvement: -1

Name: - Manish Basnet

Function Performed: - Project coordinator

Period of involvement: -5

Brief Narrative Description of Project:

The project carries out the following activities in 8 remote districts of Nepal.
• To carry out 12th round of quality assurance and monitoring of Solar Home System (SHS).
• To assess the overall quality of work carried out by the solar companies in the field.
Description of actual services provided by your organization:

BID was involved in following activities.


1. Household Survey, Data collection and Field Survey

2. Brief orientation on solar back up system for proper use, load capacity, proper charging method, Solar
panel cleaning methods,

3. Data Entry and analysis, and Preparation of final Report


Project Name 13th round Quality Assurance and Monitoring of Solar Home System (SHS)
Country Nepal

Location: - onsite/offsite Project Location within the country Dhading, Sindhupalchowk, Taplejung, Pnachthar,
Sankhuwasabha,
Start date 10-Jul-2014
Completion Date 10-Jan-2015
Type of Assignment Continuous

Client Name Alternative Energy Promotion Centre (AEPC)


Funding Source Alternative Energy Promotion Centre (AEPC)
Loan/TA. Grant No

Number of person 20
month for Entire
Project

Total Value of Whole 10910


Project (In US$)

Involved as Lead

Associate

Professional staff Number of staff: -6


provided by your
organization Number of Person Months: - 20

Approximate value of services provided by hour organization in US ($):-10910

Lead firm Name of lead firm: N/A


Country of Incorporation: - N/A
Number of Person-Months of Professional Staff Provided by Lead Firm: -N/A

Professional Staff Name: - Subhash Jha

Function Performed: - Team Leader

Period of involvement: -6

Name: - Suraj Maharjan

Function Performed: - Project coordinator

Period of involvement: -6

Brief Narrative Description of Project:

The project carries out the following activities in 8 remote districts of Nepal.
• To carry out 13th round of quality assurance and monitoring of Solar Home System (SHS).
• To assess the overall quality of work carried out by the solar companies in the field.
Description of actual services provided by your organization:

1. Household Survey, Data collection and Field Survey

2. Brief orientation on solar back up system for proper use, load capacity, proper charging method, Solar
panel cleaning methods,
3. Data Entry and analysis, and Preparation of final Report
Project Name Verification Consultants to verify deviated cases of 10, and 11th round of Quality Assurance
and Monitoring of Solar Home System (SHS)
Country Nepal

Location: - onsite/offsite Project Location within the country Sankhuwasabha, Okhaldhunga, Rukuma, Dang
Start date 06-Apr-2014
Completion Date 01-Jul-2014
Type of Assignment Continuous

Client Name Alternative Energy Promotion Centre (AEPC)


Funding Source Alternative Energy Promotion Centre (AEPC)
Loan/TA. Grant No

Number of person 7
month for Entire
Project

Total Value of Whole 5500


Project (In US$)

Involved as Lead

Associate

Professional staff Number of staff: -4


provided by your
organization Number of Person Months: - 7

Approximate value of services provided by hour organization in US ($):-5500

Lead firm Name of lead firm: Sustainable Infrastructure Development Foundation (SIDeF)
Country of Incorporation: - Nepal
Number of Person-Months of Professional Staff Provided by Lead Firm: - 0

Professional Staff Name: - Bhanu Timseena

Function Performed: - Sociologist

Period of involvement: -1

Name: - Manish Basnet

Function Performed: - Project coordinator

Period of involvement: -4

Brief Narrative Description of Project:

The project carries out the following activities in 8 remote districts of Nepal.
• To carry out Verification of monitoring data of Solar Home System (SHS).
• To assess the overall quality of work carried out by the solar companies in the field.
Description of actual services provided by your organization:

1. Household Survey, Data collection and Field Survey

2. Brief orientation on solar back up system for proper use, load capacity, proper charging method, Solar
panel cleaning methods,
3. Data Entry and analysis, and Preparation of final Report