Number of person
month for Entire
Project
Involved as Lead
Associate
Period of involvement: -1
Period of involvement: -1
Detail Feasibility Study, detail technical design, and prepare Bid Document as per PPA/PPR guideline preparation for
implementation of Solar Street Lighting System in various selected Metropolitans, Sub-Metropolitans, Municipalities
and VDC’s of Nepal. Site visit, co-ordination with the related person/user group of the respected place, Design layout
plan and assess to the technical and financial feasibility study of street lighting system
Description of actual services provided by your organization:
1. Interact with AEPC, selected metropolitan, sub metropolitan, municipalities and VDC’s, local/user group for
better understanding of the task.
2. Conduct site visit of the selected sites.
3. Review available notional codes and specification for street lighting, LED lights and PV specification
4. Prepare detail feasibility report containing conceptual design for solar street lighting system to enable listed
companies to tender for implementation of the project. The design is taken into consideration dust, storms,
isolated installations, difficulty in maintenance, high temperature and tough operation conditions etc.
5. Prepare BoQ and cost estimation for the system and Prepare technical components of the bidding documents
including assessment criteria for bidders.
6. Analyze the financial/technical aspect, feasibility, cost effectiveness, No. of beneficiary’s and propose suitable
business plan for multi-use of solar streetlight system.
7. Prepare repair and maintenance plan and schedule.
Project Name Consultancy services for supply, delivery, Installation and commissioning and after sales
services of Institutional Solar PV (ISPS at public Institution in various regions of Nepal
Name of Client Suyra Roshni Industries Pvt. Ltd. JV BIrat Energy Pvt. Ltd.
Country Nepal Project location within Country Jhapa, Morang, Okhaldhunga, Khotang,
Siraha, Udayapur, Bara, Parsa,
DArchula, Baitadi, Kanchanpur, Dotii,
Achham, Bajang, Rupandehi, Dang,
Rukum Jajarkot, Gulmi, Kavre,
Rupandehi, Argakhachi, Sindupalchowk,
Chitwam, Dhanusha, Lalitpur, SArlahi,
Nawalparasi, Kalikot.
Source of Financing Suyra Roshni Industries Pvt. Ltd. JV BIrat Energy Pvt. Ltd.
Consultancy Services
(i) No. of staff 10
Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
Detailed Description of the Actual Services Provided by your Firm
Coordinate with schools and health post to audit the energy requirement.
Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
Project Name Consultancy services for Installation of Solar Backup System
Consultancy Services
(i) No. of staff 2
Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
Consultancy Services
(i) No. of staff 2
Brief orientation on solar back up system for proper use, load capacity, proper charging method,
Solar panel cleaning methods,
Location: - onsite/offsite Project Location within the country Khotang, Sankhuwasabha, Rolpa, Jarjarkot, Bajhang,
Dhading, Surkhet, Accham
Start date 1 June 2013
Completion Date 10 October 2013
Type of Assignment Continuous
Number of person
month for Entire
Project
Involved as Lead
Associate
Lead firm Name of lead firm: Sustainable Infrastructure Development Foundation (SIDeF)
Country of Incorporation:-Nepal
Number of Person-Months of Professional Staff Provided by Lead Firm: -0
Professional Staff Name: - Bhanu Timseena
Period of involvement: -1
Period of involvement: -5
The project carries out the following activities in 8 remote districts of Nepal.
• To carry out 12th round of quality assurance and monitoring of Solar Home System (SHS).
• To assess the overall quality of work carried out by the solar companies in the field.
Description of actual services provided by your organization:
2. Brief orientation on solar back up system for proper use, load capacity, proper charging method, Solar
panel cleaning methods,
Location: - onsite/offsite Project Location within the country Dhading, Sindhupalchowk, Taplejung, Pnachthar,
Sankhuwasabha,
Start date 10-Jul-2014
Completion Date 10-Jan-2015
Type of Assignment Continuous
Number of person 20
month for Entire
Project
Involved as Lead
Associate
Period of involvement: -6
Period of involvement: -6
The project carries out the following activities in 8 remote districts of Nepal.
• To carry out 13th round of quality assurance and monitoring of Solar Home System (SHS).
• To assess the overall quality of work carried out by the solar companies in the field.
Description of actual services provided by your organization:
2. Brief orientation on solar back up system for proper use, load capacity, proper charging method, Solar
panel cleaning methods,
3. Data Entry and analysis, and Preparation of final Report
Project Name Verification Consultants to verify deviated cases of 10, and 11th round of Quality Assurance
and Monitoring of Solar Home System (SHS)
Country Nepal
Location: - onsite/offsite Project Location within the country Sankhuwasabha, Okhaldhunga, Rukuma, Dang
Start date 06-Apr-2014
Completion Date 01-Jul-2014
Type of Assignment Continuous
Number of person 7
month for Entire
Project
Involved as Lead
Associate
Lead firm Name of lead firm: Sustainable Infrastructure Development Foundation (SIDeF)
Country of Incorporation: - Nepal
Number of Person-Months of Professional Staff Provided by Lead Firm: - 0
Period of involvement: -1
Period of involvement: -4
The project carries out the following activities in 8 remote districts of Nepal.
• To carry out Verification of monitoring data of Solar Home System (SHS).
• To assess the overall quality of work carried out by the solar companies in the field.
Description of actual services provided by your organization:
2. Brief orientation on solar back up system for proper use, load capacity, proper charging method, Solar
panel cleaning methods,
3. Data Entry and analysis, and Preparation of final Report