Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Schlumberger MORNING REPORT

PT. SCHLUMBERGER GEOPHYSIC NUSANTARA

BARGE : COSL 223


DATE : 10-Jul-20 WELL NAME/ JOB : FARC-11/ WBS NO:OS20D22120 / PUMP REPAIR
REASON
Field Specialist/ Jusman Indra K R. TIME 105 Days / Hrs
Onboard
Operator (S) Ahmad K Fendi SHUT IN Days / Hrs
RC D1000NX 218STG/VGSA/MAX BPBSL
POOH
90 HP - 1516 V -38.7 A + xT 150_1
E.S.P TYPE
RC D1000NX 218STG/VGSA/MAX BPBSL
RIH
/MAX 456, NGM 100/120HP 1069/1283V 62.2A /xT 150_1+Shroud 5.5" @7990FT [PACKER/SSD/RCV]

OPERATION @ 05:00 AM Transfer Rig from Main Deck to Banuwati P/F


ACTIVITIES
ESP Related Activities and Issues RIG/ Barge
TIME (05:00 - 18:00) TIME (05:00 - 18:00)
05:00-18:00 Barge Undertowing
Anchor Job at Banuwati P/F
15:30-17:00 Prefare Surface Cable as per CBU Reps Request

TIME (18:00 - 05:00) TIME (18:00 - 05:00)


18:00-05:00 Barge Approach Banuwati P/F
Install Gangway
SIMOP and Kill Well, N/D X-tree, NU BOP and Test
Transfer Rig

No. Type PN SN Remarks


CABLE ON BOARD

DISMANTLE REPORT VISUAL INSPECTION / ELECTRICAL TEST


PUMP UT Shaft rotation rough, Found Scale on top of pump3, Housing covered by scale
PUMP CT Shaft rotation free, Found Scale on top of pump2, Housing covered by scale
PUMP LT Shaft rotation free, Found Scale on top of pump1, Housing covered by scale
AGH
INTAKE/ VGSA Shaft rotation free, No foreign material inside Screen, Housing covered by scale
PROTECTOR Shaft rotation free, Empty oil on upper chamber, Dirty Oil at middle and bottom of Protector, Housing covered by scale
MOTOR S/R free, Pothead Damaged ,Burn Out from inside,Low Reading (pothead still attached)P-P:OL Ω OL Ω OL ΩP-G: 0.2Ω 0.2Ω 0.2Ω
DMT/SENSOR Tool Fault (cLA:0.872,CZ:1.305,CF:1.301), Housing good
CASING SHROUD Good Condition, No Corrosive indication, No Broken on Housing or Thread
SCREEN

BIW PENT. / CONNECT.


CABLE PACK OFF D.M.T Test on Surface
PIP Psig
ROUND+ FLAT CABLE Operable Condition, No Broken Armor and Insulation BHT O
F
Mot T O
F
ELECTRIC READING BY MEGGER WELL NAME :
DATA START
P-G PHASE 1 PHASE 2 PHASE 3 DATE / TIME :
MOTOR S/A A SBHP PSI
D.M.T R/A A SBHT/Tm o
F
ROUND CBL PUT Minutes FBHP PSI
FLAT CBL RTP PSI FBHT/Tm o
F
ROT. RATE BFPD
Pulling Result: Pothead was Damaged, Burn Out, Reading at Pothead OL/Open
Last Backload
Ex-Well FARC-15
MTD No : T-3301029

Equipment on Board : Equipment for Backload - Jakarta (MTD#)


#ESP EX-FARC-11 #ESP EX-FARC-15 MTD T-3301029
1EA LONG BASKET TD-B1019 1EA LONG BASKET ESP SLB 15485
1EA CABLE BASKET TD-2438624 1EA REEL CABLE INSIDE CABLE BASKET RPI-17
1EA CABLE BASKET SLB 17111 1EA CLAMP BASKET RPI-10
1EA CLAMP BASKET RPI-7 1EA CONTAINER BASKET AORU 2301815
5JTS CASING SHROUD 5.5"

000000Schlumberger Private# 00000Schlumberger-Private


0
FS Equipment
Toolbox #FSSM 829 MPI date : Nov 2020
Spooler #RPI-03 Nov 2020

000000Schlumberger Private# 00000Schlumberger-Private


0

You might also like