Schlumberger provided a morning report on well repair activities for the FARC-11 well. Key details include:
- The barge was undertaking towing and positioning activities to transfer the rig from the main deck to the Banuwati production facility.
- Downhole pump dismantling and inspection found scaling on housings and rough shaft rotation on one pump. Electrical readings on the motor showed a damaged pothead with open readings.
- Surface activities included prepping the surface cable per the customer's request.
- The last backload equipment was from well FARC-15 and included various baskets and equipment for transport back to Jakarta.
Schlumberger provided a morning report on well repair activities for the FARC-11 well. Key details include:
- The barge was undertaking towing and positioning activities to transfer the rig from the main deck to the Banuwati production facility.
- Downhole pump dismantling and inspection found scaling on housings and rough shaft rotation on one pump. Electrical readings on the motor showed a damaged pothead with open readings.
- Surface activities included prepping the surface cable per the customer's request.
- The last backload equipment was from well FARC-15 and included various baskets and equipment for transport back to Jakarta.
Schlumberger provided a morning report on well repair activities for the FARC-11 well. Key details include:
- The barge was undertaking towing and positioning activities to transfer the rig from the main deck to the Banuwati production facility.
- Downhole pump dismantling and inspection found scaling on housings and rough shaft rotation on one pump. Electrical readings on the motor showed a damaged pothead with open readings.
- Surface activities included prepping the surface cable per the customer's request.
- The last backload equipment was from well FARC-15 and included various baskets and equipment for transport back to Jakarta.
DATE : 10-Jul-20 WELL NAME/ JOB : FARC-11/ WBS NO:OS20D22120 / PUMP REPAIR REASON Field Specialist/ Jusman Indra K R. TIME 105 Days / Hrs Onboard Operator (S) Ahmad K Fendi SHUT IN Days / Hrs RC D1000NX 218STG/VGSA/MAX BPBSL POOH 90 HP - 1516 V -38.7 A + xT 150_1 E.S.P TYPE RC D1000NX 218STG/VGSA/MAX BPBSL RIH /MAX 456, NGM 100/120HP 1069/1283V 62.2A /xT 150_1+Shroud 5.5" @7990FT [PACKER/SSD/RCV]
OPERATION @ 05:00 AM Transfer Rig from Main Deck to Banuwati P/F
ACTIVITIES ESP Related Activities and Issues RIG/ Barge TIME (05:00 - 18:00) TIME (05:00 - 18:00) 05:00-18:00 Barge Undertowing Anchor Job at Banuwati P/F 15:30-17:00 Prefare Surface Cable as per CBU Reps Request
TIME (18:00 - 05:00) TIME (18:00 - 05:00)
18:00-05:00 Barge Approach Banuwati P/F Install Gangway SIMOP and Kill Well, N/D X-tree, NU BOP and Test Transfer Rig
No. Type PN SN Remarks
CABLE ON BOARD
DISMANTLE REPORT VISUAL INSPECTION / ELECTRICAL TEST
PUMP UT Shaft rotation rough, Found Scale on top of pump3, Housing covered by scale PUMP CT Shaft rotation free, Found Scale on top of pump2, Housing covered by scale PUMP LT Shaft rotation free, Found Scale on top of pump1, Housing covered by scale AGH INTAKE/ VGSA Shaft rotation free, No foreign material inside Screen, Housing covered by scale PROTECTOR Shaft rotation free, Empty oil on upper chamber, Dirty Oil at middle and bottom of Protector, Housing covered by scale MOTOR S/R free, Pothead Damaged ,Burn Out from inside,Low Reading (pothead still attached)P-P:OL Ω OL Ω OL ΩP-G: 0.2Ω 0.2Ω 0.2Ω DMT/SENSOR Tool Fault (cLA:0.872,CZ:1.305,CF:1.301), Housing good CASING SHROUD Good Condition, No Corrosive indication, No Broken on Housing or Thread SCREEN
BIW PENT. / CONNECT.
CABLE PACK OFF D.M.T Test on Surface PIP Psig ROUND+ FLAT CABLE Operable Condition, No Broken Armor and Insulation BHT O F Mot T O F ELECTRIC READING BY MEGGER WELL NAME : DATA START P-G PHASE 1 PHASE 2 PHASE 3 DATE / TIME : MOTOR S/A A SBHP PSI D.M.T R/A A SBHT/Tm o F ROUND CBL PUT Minutes FBHP PSI FLAT CBL RTP PSI FBHT/Tm o F ROT. RATE BFPD Pulling Result: Pothead was Damaged, Burn Out, Reading at Pothead OL/Open Last Backload Ex-Well FARC-15 MTD No : T-3301029
Equipment on Board : Equipment for Backload - Jakarta (MTD#)