Inward No 1430523 Sheet 1

Project Title : PROPOSED INDUSTRIAL BUILDING FOR SHREE ROKADIYA EXPORT - JUNAGADH PARTNER SURESHBHAI BHIKHABHAI KAPADIYA , ON PLOT NO - 9 ON R. SR. NO. - 33/ 1 AND 33/ 2 PAIKI , AT - SUKHPUR , JUNAGADH , TA - JUNAGADH , DIST - JUNAGADH Scale 1:100
Inward Date
A VERSION NO.: 1.0.22
AREA STATEMENT
VERSION DATE: 31/03/2020
PROJECT DETAIL :
Site Address: RevenueNo: 33/1 , 33/2 PAIKI Plot Use: Industrial
Authority: Junagadh Urban Development Authority
Plot SubUse: Small Factory
(JUDA)
AuthorityClass: D2 Plot Use Group: Industrial 1 (IN1)
Land Use Zone: Industrial Use Zone
Project Type: Building Permission Conceptualized Use Zone: IZ1
Nature of Development: NEW

SubDevelopment Area: Other Areas


Special Project: NA
Special Road: NA
Site Address: RevenueNo: 33/1 , 33/2 PAIKI
Parking Check (Table 7b) AREA DETAILS : Sq.Mts.
Car Loading/Unloading Visitor's Car Parking Total Parking Area 1. Area of Plot As per record -
Area No. Area No. Area No. Area
Reqd. Prop. Reqd. Prop. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop. 6 Hakka Patrak 1304.90
40.22 0 0 26.25 52.50 1 2 0.00 13.31 0 1 61.24 106.03 - - As per site condition 1301.20
L. SR. NO. 34 PAIKI NA Plot NO - 14 NI JAMIN Total 30.62 40.22 0 0 26.25 52.50 1 2 0.00 13.31 0 1 61.24 106.03 - - Area of Plot Considered 1304.90
20.65

TREE
Deduction for
TREE TREE
TREE
TREE TREE TREE
Building USE/SUBUSE Details (a)Proposed roads 0.00
TREE Building Building
Building Building Building Building Floor Floor Floor FSI FSI (b)Any reservations

6.00
Name Use FSI Use
Use SubUse Type Structure Name Use SubUse Name SubUse
Group Total(a + b)
2.00
TREE 0.00
2.00

TREE Percolating pit Percolating Well


9 (PLOT) GROUND
2.00 2.00 Small Small 3.
TREE FLOOR Industrial Industrial
10.65 Factory Factory
TREE PLAN 4. % of Common Plot (Reqd.)
6.00

Small Industrial Small 0.00


TREE
MEZZANINE @ GROUND FLOOR PLAN Industrial Industrial
Small
Factory FSI Factory % of Common Plot (Prop) 0.00
Industrial - -
2.67

RAIN WATER STORAGE TANK (10000.00 ltr)-1 FIRST


TREE Factory
FLOOR Industrial
Small
Industrial
Small Balance area of Plot(1 - 4)
4.78
Factory Factory
PLAN Plot Area For Coverage 1304.90
TREE
TREE Small
Industrial
Factory
- - Plot Area For FSI 1304.90
TREE
TREE
1566.00
Total Perm. FSI area 1565.88
TREE
Layout Approved Details
TREE
6. Total Built up area permissible at:
Layout Approved Common COP Provided Common Parking Provided

IN
TREE
Yes No No a. Ground Floor 0.00

I JAM
TREE

448.21
22.89

TREE

/1N
TREE
Tree Details (Table 3h) Total Prop. Coverage Area (34.35 %) 448.21
TREE
Balance coverage area (- %)
Plot No - 8

Plot

2
Nos Of Trees 0.00

3
TREE Name
Reqd Prop

O .
TREE Proposed Area at:

.N
Plot No - 9 Tree 35 40

47.6
34.6
43.60

L. SR
2

TREE 9 (PLOT)
BLDG HT: 11.12 MT. TREE
NO OF FLOORS: 2
TREE
5.91
Color Notes
COLOR INDEX - Proposed Built up Existing Built up Proposed F.S.I Existing F.S.I
TREE PLOT BOUNDARY Ground Floor 519.48 0.00 408.02 0.00
5.70

ABUTTING ROAD
Mezzanine @ Ground
PROPOSED CONSTRUCTION 0.00 31.88 0.00
TREE
COMMON PLOT
Floor
1.60
ROAD ALIGNMENT (ROAD WIDENING AREA) First Floor 181.63 0.00 0.00
TREE
FUTURE T.P.SCHEME DEDUCTION AREA Terrace Floor 0.00 0.00 0.00 0.00
14.59

EXISTING (To be retained)


TREE Total Area: 750.02 0.00 612.38
EXISTING (To be demolished)
Total FSI Area: 612.38
20.82
20.82

TREE
Total BuiltUp Area:
TREE Proposed F.S.I. consumed: 0.47
6.00
C.
TREE
16.10
4. Tenement Proposed At:
E. Parking Statement
TREE FSI & Tenement Details
Plot No - 9 Building Deductions 1. Parking Space Required as per Regulations: 61.24
6.00

From Proposed Proposed Parking Space:


TREE

Gross Deductions (Area in Sq.mt.) FSI Area


106.03
No. of Gross Built Total Built Total FSI
TREE BUA(Area (Sq.mt.)
Same Up Area Up Area Area
in Sq.mt.)
38.50 Bldg (Sq.mt.) (Sq.mt.) (Sq.mt.)
Duct(Void,
Duct, StairCase
Accessory Covered Parking Industrial
Buildingwise Floor FSI Details
Use Area
Chowk) Floor Name Building Name
9 (PLOT) 1 779.74 29.72 750.02 36.31 5.46 8.66 87.21 612.38 612.38 Total
Grand
9 (PLOT)
1 779.74 29.72 750.02 36.31 5.46 8.66 87.21 612.38 612.38
9.00 mt. Wide MainRoad Total : Proposed Built Up Area Proposed FSI Area Total Proposed Built Total FSI Area
(Sq.mt.) (Sq.mt.) Up Area (Sq.mt.) (Sq.mt.)
Required Parking Ground Floor 519.48 408.02 519.48 408.02
Required Other Mezzanine @ Ground
Units
Type SubUse Area Parking Car Parking 48.91 31.88 48.91 31.88
Reqd. Prop. Area(Sq.mt.) Loading/Unloading
Floor
9 (PLOT) 0 1
First Floor 181.63 172.48 181.63 172.48
- Terrace Floor 0.00 0.00 0.00
SITE PLAN Industrial
Small
-
612.38 61.24 30.62
Total:
Factory 750.02 612.38 750.02 612.38
(Scale - 1:200) -
1000 - - 26.25
Total: 61.24 26.25

OWNER'S NAME AND SIGNATURE


1. The remaining payments are to be made online within seven days and only thereafter this permission
shall be considered to be valid and shall be valid for 12 months. ROKADIYA EXPORTJUNAGADH PARTNER SURESHBHAI
2. The permission granted does not absolve the owner from any the liabilities or the permissions required
under any other act. BHIKHABHAI KAPADIYA
3. The permission does not constitute the acceptance of correctness, confirmation, approval or endorsement of:
a. Title, ownership, and easement rights of the Building?unit for which the building is proposed;
b. The area, dimensions and other properties of the plot which violate the plot validation certificate.
c. Correctness of demarcation of the plot on site.
d. Workmanship, soundness of material and structural safety of the proposed building;
e. Structural reports and structural drawings and shall not bind or render the Competent Authority liable in ARCH/ENG'S NAME AND SIGNATURE
any way in regard to (a), (b), (c) (d), (e) and (f) above.
4. The applicant, as specified in CGDCR, shall submit: AMITBHAI ARVINDBHAI
a. Structural drawings and related reports, before the commencement of the construction, GHARDESIA
b. Progress reports.
5. Follow the requirements for construction as per regulation no 5 of CGDCR.
6. The permission has been granted relying uploaded submissions, undertakings, attachments of true copies of the
EOR-11
original documents made along with the online application. It is believed that the aforesaid data uploaded by the
owner or the applicant is true and legally valid. Also the plans are as per the prevailing Comprehensive General
Development Control Regulation-2017
STRUCTURE ENGINEER
In case of any discrepancy/lack of authenticity of the data found in the aforesaid declaration or in the attachments,
or violation of any conditions, the application shall automatically stand cancelled/revoked and the construction / CHETANBHAI BHAGVANJIBHAI SAYANI
development carried out shall be considered illegal and unauthorized and the competent authority may take legal
QR CODE
action to pull down illegal construction, action to discontinue further construction and or the use of building, and
or other legal actions including initiating criminal proceedings. Consequent damage or loss on account of aforesaid
shall be at the cost of the owner or the applicant. Also, the owner or applicant shall have no right for any claim or
SEOR-2-Category-1-11
damages on account of any action by the competent authority.

ISO_A1_(841.00_x_594.00_MM) Based on the aforesaid permission the applicant reserves the rights to commence the construction from the day of issuance. Nevertheless; in case, for procuring the aforesaid permission, any document or system configuration for rules or information or parameters or drawings provided or attached is found to be incorrect or inconsistent with respect to prevailing bye-laws, by any authority or otherwise, the permission granted shall be considered as lapsed.Accuracy of Scrutiny Report and Drawing is subject to accuracy of end-user provided data, 3rd party
software/hardware/services, etc. SoftTech Engineers Ltd. is not liable for any damages which may arise from use, or inability to use the Application.Contents highlighted in magenta color are not verified.
Project Title : PROPOSED INDUSTRIAL BUILDING FOR SHREE ROKADIYA EXPORT - JUNAGADH PARTNER SURESHBHAI BHIKHABHAI KAPADIYA , ON PLOT NO - 9 ON R. SR. NO. - 33/ 1 AND 33/ 2 PAIKI , AT - SUKHPUR , JUNAGADH , TA - JUNAGADH , DIST - JUNAGADH Inward No 1430523 Sheet 3
Inward Date Scale 1:100
1.15

TERRACE FLOOR
0.12

4.57
0.22

0.22

FIRST FLOOR
L. SR. NO. 34 PAIKI NA Plot NO - 14 NI JAMIN
10.33
11.12 mt. Total Ht.

11.12 mt. from GL

0.12

0.12
0.22

0.22

0.22
2.75

MEZZANINE @ GROUND FLOOR


6.10
0.12

0.12

ELECTRIC ROOM
0.22

0.22

0.22

FIRE
SERVICE
INLET
SWICE &
2.93

2.93

CHECK
VALVE
BOOSTER PUMP
GROUND FLOOR U.W.T. :-1,00,000
Plinth ltr.
FIRE FIGHTING
G.L.
UNDER
GROUND WATER

0.45
INLET CONNECTION
TANK FROM BORE
ISFE PIG 61
ELEVATION SECTION

IN
JAM
1 NI
. 32/
Plot No - 8

. NO
23.
21.80

85

L. SR
RECHARGING RECHARGING
BORE BORE
+gf.lv. +gf.lv.
10.65
10.65
7.41

4.12
3.90
W Double Height W
19.25

7.40
7.41
W1 W1 W1
TOILET D2
V 1.00X1.00
W --- 9.00 MT. WIDE ROAD ---
TOILET PASSAGE ROOM ROOM ROOM W
GODOWN GODOWN V 1.00X1.00 1.00X3.20 GODOWN
1.69X3.20 1.64X3.20 1.69X3.20
7.41X12.02 5.44X9.79 D2 5.44X9.79
TOILET D2
V 1.00X1.00
7.51
OPEN D1 D1 D1
W Key PLAN
1: 200
16.96

20.22

4.70

21.8
R.S.
OPEN TERRACE gf

1
W
4.70 X 7.51 R.S.
6.10 1.31
R.S. R.S. R.S.
5.91 7.51
TOILET
V

1.50

1.50

1.50
1.50
1.40X1.16D2 Staircase Lobby OPEN STAIRCASE
1.30

12.50
TOILET D2 6.10 R.S.
V
1.40X1.12
4.86

5.09
W
A TOILET A A OPEN TERRACE A MAIN HOLE WITH PERFORATED
V CATCH- PIT
1.40X1.12D2 PERFORATED
5.09 X 7.51 LOCKING SYSTEM R.C.C.SLAB
34.6
32.10

R.C.C.SLAB
A GODOWN A GODOWN

1.58
gf
2

TOILET D2 9.50X7.70 SOLAR HEATING SYSTEM 9.50X7.70


V 3.89
1.40X1.16
7.96

MIN.HEIGHT(H)
CP(I) PERFORATED
DN
1.60

1.50MT.
7.51 BRICK WALL
P.C.C.
R.S.
W MIN(LXB)
SOLID 1.00MT
BRICK WALL PABBLESS/GRAVELS
OF SIZE 20MM TO

MIN.HEIGHT
11.30
5.93

1.00MT.
R.S. W W W 40 MM
OPEN STAIRCASE
18.81
PERCOLATION PIT
5.05 PERCOLATION PIT
R.S.
FIRST FLOOR PLAN
19.68

P.C.C. P.C.C.
(Proposed)
UP
1.50
1.50
(SCALE 1:100)
W
Staircase Lobby
7.50

7.50

LD(I) LD(I)
OPNER FOTARI
W 8.01X11.78 5.37X9.59
4.20

3.39
VP(I) INLET R.C.C. SLAB
MAIN HOLE

1.37
0.91 0.91 0.91 G.L.
W

1.60
air pipe C.C.1:2:4
3.50 3.50 COPPING
3.17 r.c.c.slab
inlet out U.C.R.
0.45 0.30
MASONARY
2.60
1.48
ELECTRIC ROOM 1 2 3
1.61

SEPTIC TANK

1.48
1.23 2.10
R.S. R.S. l.c.bedding
16.10 bick wall
SEPTIC TANK PLAN OF S.P.
23.61
GROUND FLOOR PLAN
(Proposed)
(SCALE 1:100)
OWNER'S NAME AND SIGNATURE
1. The remaining payments are to be made online within seven days and only thereafter this permission
shall be considered to be valid and shall be valid for 12 months. ROKADIYA EXPORTJUNAGADH PARTNER SURESHBHAI
2. The permission granted does not absolve the owner from any the liabilities or the permissions required
Building :9 (PLOT) under any other act. BHIKHABHAI KAPADIYA
Floor Deductions UnitBUA Table for Building :9 (PLOT) 3. The permission does not constitute the acceptance of correctness, confirmation, approval or endorsement of:
Name From Gross Floor Gross Deductions (Area in a. Title, ownership, and easement rights of the Building?unit for which the building is proposed;
Deductions (Area in Sq.mt.) Proposed FSI Area (Sq.mt.) UnitBUA UnitBUA
Gross BUA(Area in Total Built Total FSI Name UnitBUA Sq.mt.) Carpet Area No. of Unit b. The area, dimensions and other properties of the plot which violate the plot validation certificate.
Type Area c. Correctness of demarcation of the plot on site.
Builtup Sq.mt.) Up Area Area Area Wall Stair Case
Area Duct(Void, (Sq.mt.) (Sq.mt.) GROUND d. Workmanship, soundness of material and structural safety of the proposed building;
gf OTHER 408.02 408.02 11.68 0.00 396.34 00 ARCH/ENG'S NAME AND SIGNATURE
Accessory Covered e. Structural reports and structural drawings and shall not bind or render the Competent Authority liable in
Duct, StairCase Parking Industrial FLOOR Total : 408.02 408.02 11.68 0.00 396.34 00
Use Area any way in regard to (a), (b), (c) (d), (e) and (f) above.
Chowk) PLAN 4. The applicant, as specified in CGDCR, shall submit:
Total per Typical Floor AMITBHAI ARVINDBHAI
Ground Floor: =1 a. Structural drawings and related reports, before the commencement of the construction, GHARDESIA
519.48 0.00 519.48 10.13 5.46 8.66 87.21 408.02 408.02
Floor Total : 408.02 408.02 11.68 0.00 396.34 00 b. Progress reports.
Mezzanine @ 5. Follow the requirements for construction as per regulation no 5 of CGDCR.
MEZZANINE mazzenine OTHER 33.83 33.83 4.17 1.95 27.71 00 EOR-11
Ground 48.91 0.00 48.91 17.03 0.00 0.00 0.00 31.88 31.88 6. The permission has been granted relying uploaded submissions, undertakings, attachments of true copies of the
@ GROUND Total : 33.83 33.83 4.17 1.95 27.71 00
Floor original documents made along with the online application. It is believed that the aforesaid data uploaded by the
FLOOR Total per Typical Floor owner or the applicant is true and legally valid. Also the plans are as per the prevailing Comprehensive General
First Floor 211.35 29.72 181.63 9.15 0.00 0.00 0.00 172.48 172.48 SCHEDULE OF DOOR:
PLAN Floor: =1 Development Control Regulation-2017
Terrace BUILDING NAME NAME LENGTH HEIGHT NOS Staircase Checks (Table 8a-1) STRUCTURE ENGINEER
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total : 33.83 33.83 4.17 1.95 27.71 00
Floor 9 (PLOT) Floor Name StairCase Name Flight Width Tread Width Riser Height In case of any discrepancy/lack of authenticity of the data found in the aforesaid declaration or in the attachments,
FIRST gf D2 0.76 2.10 08
Total: 779.74 29.72 750.02 36.31 5.46 8.66 87.21 612.38 612.38 OTHER 202.21 202.21 7.80 0.00 194.41 00
9 (PLOT) D1 0.91 2.10 03 GROUND FLOOR SCHEDULE OF WINDOW/VENTILATION: or violation of any conditions, the application shall automatically stand cancelled/revoked and the construction / CHETANBHAI BHAGVANJIBHAI SAYANI
Total FLOOR Total : 202.21 202.21 7.80 0.00 194.41 00 OPEN STAIRCASE 1.50 0.23 0.29
PLAN development carried out shall be considered illegal and unauthorized and the competent authority may take legal
Number of PLAN Total per Typical Floor
9 (PLOT) OPEN 1.00 2.10 01 BUILDING NAME NAME LENGTH HEIGHT NOS QR CODE
MEZZANINE @ OPEN STAIRCASE 1.50 0.23 0.13 action to pull down illegal construction, action to discontinue further construction and or the use of building, and
1 9 (PLOT) D 1.22 2.10 01 9 (PLOT) V 0.60 1.00 07 or other legal actions including initiating criminal proceedings. Consequent damage or loss on account of aforesaid
Same Floor: =1 GROUND FLOOR
shall be at the cost of the owner or the applicant. Also, the owner or applicant shall have no right for any claim or
SEOR-2-Category-1-11
Buildings: Total : 202.21 202.21 7.80 0.00 194.41 00 9 (PLOT) OPEN 1.40 2.10 01 PLAN OPEN STAIRCASE 1.50 0.30 0.23 9 (PLOT) W1 1.50 1.20 03
Total: - 9 (PLOT) FIRST FLOOR PLAN 9 (PLOT) damages on account of any action by the competent authority.
779.74 29.72 750.02 36.31 5.46 8.66 87.21 612.38 612.38 R.S. 2.40 2.10 11 OPEN STAIRCASE 1.50 0.60 0.27 W 1.80 1.20 15
ISO_A0_(841.00_x_1189.00_MM) Based on the aforesaid permission the applicant reserves the rights to commence the construction from the day of issuance. Nevertheless; in case, for procuring the aforesaid permission, any document or system configuration for rules or information or parameters or drawings provided or attached is found to be incorrect or inconsistent with respect to prevailing bye-laws, by any authority or otherwise, the permission granted shall be considered as lapsed.Accuracy of Scrutiny Report and Drawing is subject to accuracy of end-user provided data, 3rd party software/hardware/services, etc. SoftTech Engineers Ltd. is not liable for any damages which may arise from use, or inability to use the Application.Contents highlighted in magenta color are not verified.
Inward No 1430523 Sheet 4
Project Title : PROPOSED INDUSTRIAL BUILDING FOR SHREE ROKADIYA EXPORT - JUNAGADH PARTNER SURESHBHAI BHIKHABHAI KAPADIYA , ON PLOT NO - 9 ON R. SR. NO. - 33/ 1 AND 33/ 2 PAIKI , AT - SUKHPUR , JUNAGADH , TA - JUNAGADH , DIST - JUNAGADH
Inward Date Scale 1:100

RECHARGING
BORE
+gf.lv.

7.61

7.63

7.63
7.40

OPEN TERRACE

7.61

TERRACE FLOOR PLAN


(SCALE 1:100)

A A

OWNER'S NAME AND SIGNATURE


1. The remaining payments are to be made online within seven days and only thereafter this permission
shall be considered to be valid and shall be valid for 12 months. ROKADIYA EXPORTJUNAGADH PARTNER SURESHBHAI
2. The permission granted does not absolve the owner from any the liabilities or the permissions required
under any other act. BHIKHABHAI KAPADIYA
3. The permission does not constitute the acceptance of correctness, confirmation, approval or endorsement of:
a. Title, ownership, and easement rights of the Building?unit for which the building is proposed;
b. The area, dimensions and other properties of the plot which violate the plot validation certificate.
c. Correctness of demarcation of the plot on site.
d. Workmanship, soundness of material and structural safety of the proposed building;
e. Structural reports and structural drawings and shall not bind or render the Competent Authority liable in ARCH/ENG'S NAME AND SIGNATURE
any way in regard to (a), (b), (c) (d), (e) and (f) above.
4. The applicant, as specified in CGDCR, shall submit: AMITBHAI ARVINDBHAI
a. Structural drawings and related reports, before the commencement of the construction, GHARDESIA
b. Progress reports.
5. Follow the requirements for construction as per regulation no 5 of CGDCR.
6. The permission has been granted relying uploaded submissions, undertakings, attachments of true copies of the
EOR-11
original documents made along with the online application. It is believed that the aforesaid data uploaded by the
owner or the applicant is true and legally valid. Also the plans are as per the prevailing Comprehensive General
Development Control Regulation-2017
STRUCTURE ENGINEER
In case of any discrepancy/lack of authenticity of the data found in the aforesaid declaration or in the attachments,
or violation of any conditions, the application shall automatically stand cancelled/revoked and the construction / CHETANBHAI BHAGVANJIBHAI SAYANI
development carried out shall be considered illegal and unauthorized and the competent authority may take legal
QR CODE
action to pull down illegal construction, action to discontinue further construction and or the use of building, and
or other legal actions including initiating criminal proceedings. Consequent damage or loss on account of aforesaid
shall be at the cost of the owner or the applicant. Also, the owner or applicant shall have no right for any claim or
SEOR-2-Category-1-11
damages on account of any action by the competent authority.

ISO_A1_(841.00_x_594.00_MM) Based on the aforesaid permission the applicant reserves the rights to commence the construction from the day of issuance. Nevertheless; in case, for procuring the aforesaid permission, any document or system configuration for rules or information or parameters or drawings provided or attached is found to be incorrect or inconsistent with respect to prevailing bye-laws, by any authority or otherwise, the permission granted shall be considered as lapsed.Accuracy of Scrutiny Report and Drawing is subject to accuracy of end-u
software/hardware/services, etc. SoftTech Engineers Ltd. is not liable for any damages which may arise from use, or inability to use the Application.Contents highlighted in magenta color are not verifie
Inward No 1430523 Sheet 5
Project Title : PROPOSED INDUSTRIAL BUILDING FOR SHREE ROKADIYA EXPORT - JUNAGADH PARTNER SURESHBHAI BHIKHABHAI KAPADIYA , ON PLOT NO - 9 ON R. SR. NO. - 33/ 1 AND 33/ 2 PAIKI , AT - SUKHPUR , JUNAGADH , TA - JUNAGADH , DIST - JUNAGADH
Inward Date Scale 1:100

RECHARGING
BORE
+gf.lv.

0.10

1.40
1.50

Staircase Lobby OPEN STAIRCASE


3.30
1.30

PANTRY OFFICE
4.96

1.96
5.19

2.84X1.50 mazzenine
D2
2.81X4.86
A PASSAGE A
3.36

1.30X3.36

WAITING ROOM A
1.40

D OPEN
2.77X1.40
1.50
W
DN
7.61
5.93

OPEN STAIRCASE
6.75

UP
1.50
0.82

Staircase Lobby
1.50

MEZZANINE @ GROUND FLOOR PLAN


(Proposed)
(SCALE 1:100)

OWNER'S NAME AND SIGNATURE


1. The remaining payments are to be made online within seven days and only thereafter this permission
shall be considered to be valid and shall be valid for 12 months. ROKADIYA EXPORTJUNAGADH PARTNER SURESHBHAI
2. The permission granted does not absolve the owner from any the liabilities or the permissions required
under any other act. BHIKHABHAI KAPADIYA
3. The permission does not constitute the acceptance of correctness, confirmation, approval or endorsement of:
a. Title, ownership, and easement rights of the Building?unit for which the building is proposed;
b. The area, dimensions and other properties of the plot which violate the plot validation certificate.
c. Correctness of demarcation of the plot on site.
d. Workmanship, soundness of material and structural safety of the proposed building;
e. Structural reports and structural drawings and shall not bind or render the Competent Authority liable in ARCH/ENG'S NAME AND SIGNATURE
any way in regard to (a), (b), (c) (d), (e) and (f) above.
4. The applicant, as specified in CGDCR, shall submit: AMITBHAI ARVINDBHAI
a. Structural drawings and related reports, before the commencement of the construction, GHARDESIA
b. Progress reports.
5. Follow the requirements for construction as per regulation no 5 of CGDCR.
6. The permission has been granted relying uploaded submissions, undertakings, attachments of true copies of the
EOR-11
original documents made along with the online application. It is believed that the aforesaid data uploaded by the
owner or the applicant is true and legally valid. Also the plans are as per the prevailing Comprehensive General
Development Control Regulation-2017
STRUCTURE ENGINEER
In case of any discrepancy/lack of authenticity of the data found in the aforesaid declaration or in the attachments,
or violation of any conditions, the application shall automatically stand cancelled/revoked and the construction / CHETANBHAI BHAGVANJIBHAI SAYANI
development carried out shall be considered illegal and unauthorized and the competent authority may take legal
QR CODE
action to pull down illegal construction, action to discontinue further construction and or the use of building, and
or other legal actions including initiating criminal proceedings. Consequent damage or loss on account of aforesaid
shall be at the cost of the owner or the applicant. Also, the owner or applicant shall have no right for any claim or
SEOR-2-Category-1-11
damages on account of any action by the competent authority.

ISO_A1_(841.00_x_594.00_MM) Based on the aforesaid permission the applicant reserves the rights to commence the construction from the day of issuance. Nevertheless; in case, for procuring the aforesaid permission, any document or system configuration for rules or information or parameters or drawings provided or attached is found to be incorrect or inconsistent with respect to prevailing bye-laws, by any authority or otherwise, the permission granted shall be considered as lapsed.Accuracy of Scrutiny Report and Drawing is subject to accuracy of end-u
software/hardware/services, etc. SoftTech Engineers Ltd. is not liable for any damages which may arise from use, or inability to use the Application.Contents highlighted in magenta color are not verifie

You might also like