QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH OCTOBER -2017
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
1.0 TESTS ON BORROW AREAS FOR EMBANKMENT AND SUBGRADE/FLY ASH
1.1 FSI 1 test / 1500 mᶟ 562 562 0 24 24 0 586 586 0 5 0 207 207 0
1.2 GSA 1 test / 1500 mᶟ 562 562 0 24 24 0 586 586 0 5 0 209 209 0
1.3 LL / PL / PI 1 test / 1500 mᶟ 703 703 0 24 24 0 727 727 0 5 0 209 209 0
1.4 MDD / OMC 1 test / 1500 mᶟ 710 710 0 24 24 0 734 734 0 5 0 215 215 0
1.5 CBR Test 1 test / 3000 mᶟ 363 363 0 8 8 0 371 371 0 6 0 203 203 0
1.6 FDD (Emb. Layer) 1 set / 3000 m² 25027 24987 40 1370 1362 8 26397 26349 48 415 0 12884 12884 0
1.7 FDD (Sub. Layer) 1 test / 2000 m² 8656 8629 27 560 554 6 9216 9183 33 143 0 5301 5301 0
2.0 TESTS ON OGL SAMPLES (MCW&SR)
2.1 FSI 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.2 GSA 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.3 LL / PL / PI 1 test / 250m 206 206 0 0 0 0 206 206 0 0 0 83 83 0
2.4 MDD / OMC 1 test / 250m 211 211 0 0 0 0 211 211 0 0 0 84 84 0
2.5 CBR Test As Required 32 32 0 0 0 0 32 32 0 0 0 16 16 0
2.6 FDD (OGL) Min. 6 Pit 1632 1632 0 12 12 0 1644 1644 0 3 0 1137 1137 0
3.0 TESTS ON EXCAVATED SOIL
3.1 FSI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.2 GSA 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.3 LL / PL / PI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.4 MDD / OMC 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.5 CBR Test As Required 7 7 0 0 0 0 7 7 0 0 0 5 5 0
4.0 TEST ON GRANULAR SUB BASE COURSE (GSB)
4.1 GRADATION 1 test / 400 mᶟ 789 789 0 37 37 0 826 826 0 8 0 341 341 0
4.2 LL / PL / PI 1 test / 400 mᶟ 789 789 0 37 37 0 826 826 0 5 0 286 286 0
4.3 MDD / OMC 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.4 CBR Test 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.5 AIV As Required 15 15 0 0 0 0 15 15 0 0 0 16 16 0
4.6 FDD (GSB) 1 test / 1000 m² 1789 1782 7 106 102 4 1895 1884 11 32 0 821 821 0
5.0 TEST ON AGGREGATE BASE COURSE (WMM)
5.1 Mix Aggregate Gradation 1 test / 200 mᶟ 812 812 0 36 36 0 848 848 0 9 0 326 326 0
5.2 Plasticity Index 1 test / 200 mᶟ 786 786 0 36 36 0 822 822 0 4 0 266 266 0
5.3 AIV 1 test / 1000 mᶟ 216 216 0 19 19 0 235 235 0 3 0 77 77 0
5.4 MDD / OMC 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 4 4 0
5.5 Water Absorption 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 3 3 0
5.6 FI & EI 1 test / 500 mᶟ 368 368 0 19 19 0 387 387 0 3 0 93 93 0
5.7 FDD (WMM) 1 Set of 3 test / 1000 mᶟ 3287 3259 28 90 90 0 3377 3349 28 32 0 1273 1273 0
5.8 FDD (DLC) 1 Set of 3 test / 2000 mᶟ 551 551 0 15 15 0 566 566 0 5 0 180 180 0
5.9 FDD (SHOULDER) 1 test / 2000 m² 474 474 0 0 0 0 474 474 0 0 0 216 216 0
5.10 FDD (MEDIAN) 1 test / 2000 m² 105 105 0 0 0 0 105 105 0 0 0 45 45 0
5.11 FDD (BACKFILLING) MIn. 3 Pit 216 216 0 0 0 0 216 216 0 0 0 63 63 0
6.0 FINE AGGREGATE (SAND FOR CONCRETE)
6.1 Sieve Analysis / Gradation On Daily Basis 384 384 0 29 29 0 413 413 0 5 0 179 179 0
6.2 Specific Gravity (SSD) As Required 80 80 0 0 0 0 80 80 0 0 0 40 40 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
6.3 Water Absorption / Moisture Content On Daily Basis 353 353 0 29 29 0 382 382 0 8 0 168 168 0
6.4 Silt Content Once in a week 128 128 0 5 5 0 133 133 0 2 0 106 106 0
7.0 COARSE AGGREGATE (FOR CONCRETE)
7.1 Sieve Analysis / Gradation of 10mm On Daily Basis 472 472 0 29 29 0 501 501 0 6 0 189 189 0
7.2 Sieve Analysis / Gradation of 20mm On Daily Basis 468 468 0 29 29 0 497 497 0 6 0 189 189 0
7.3 Sieve Analysis / Gradation of All in Aggregate On Daily Basis 354 354 0 15 15 0 369 369 0 3 0 144 144 0
10.2 Bitumen Extraction & Gradation Test 400 ton of mix & Min. 2 211 211 0 18 18 0 229 229 0 8 0 113 113 0
test / day
10.3 Aggregate Impact Value 1 test / 350 mᶟ 121 121 0 6 6 0 127 127 0 2 0 45 45 0
10.4 Comb. Flakiness & Elongation Index 1 test / 350 mᶟ 121 121 0 6 6 0 127 127 0 2 0 42 42 0
10.5 GMM 1 test / day 108 108 0 6 6 0 114 114 0 4 0 55 55 0
10.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 420 420 0 18 18 0 438 438 0 8 0 196 196 0
10.7 Drilled Core Density 1test / 700 m² 451 451 0 24 24 0 475 475 0 11 0 242 242 0
10.8 Sp. Gravity & Water Absorption As Required 1 1 0 0 0 0 1 1 0 0 0 1 1 0
11.0 BITUMINOUS CONCRETE (BC)
11.1 Sieve Analysis 1 test for each 400 MT 15 15 0 32 32 0 47 47 0 12 0 18 18 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
400 ton of mix & Min. 2
11.2 Bitumen Extraction & Gradation Test test / day
15 15 0 32 32 0 47 47 0 12 0 18 18 0
11.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 15 15 0 32 32 0 47 47 0 12 0 17 17 0
11.7 Drilled Core Density 1test / 700 m² 75 75 0 163 163 0 238 238 0 54 0 73 73 0
11.8 Sp. Gravity & Water Absorption As Required 1 1 0 0 0 0 1 1 0 0 0 1 1 0
12.0 BITUMEN VG-30
12.1 Penetration Grade at 25 Degree 1 test / lot 139 139 0 4 4 0 143 143 0 1 0 52 52 0
12.2 Softening Point 1 test / lot 139 139 0 4 4 0 143 143 0 1 0 52 52 0
12.3 Dutility at 27 Degree 1 test / lot 125 125 0 2 2 0 127 127 0 1 0 48 48 0
12.4 Viscosity 1 test / lot 101 101 0 2 2 0 103 103 0 1 0 43 43 0
12.5 Specific Gravity 1 test / lot 110 110 0 3 3 0 113 113 0 1 0 44 44 0
13.0 CONCRETE CUBE TESTING (SITE)
13.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 374 374 0 61 61 0 435 435 0 16 0 154 154 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 283 283 0 36 36 0 319 319 0 9 0 125 125 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 209 209 0 69 69 0 278 278 0 21 0 104 104 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 249 249 0 51 51 0 300 300 0 14 0 81 81 0
(v) M-30 RCC (SET) MORT&H - Section 1700 957 957 0 120 120 0 1077 1077 0 45 0 424 424 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 150 150 0 23 23 0 173 173 0 6 0 64 64 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 284 284 0 0 0 0 284 284 0 0 0 40 40 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 432 432 0 223 223 0 655 655 0 26 0 111 111 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 27 27 0 26 26 0 53 53 0 5 0 14 14 0
(X) M40 PILE (SET) MORT&H - Section 1700 30 30 0 16 16 0 46 46 0 6 0 10 10 0
(XI) M50 PSC (SET) MORT&H - Section 1700 1 1 0 6 6 0 7 7 0 5 0 6 6 0
(XII) M-45 PSC (SET) MORT&H - Section 1700 5 5 0 28 28 0 33 33 0 18 0 21 21 0
(XIII) DLC MORT&H - Section 600 582 582 0 4 4 0 586 586 0 2 0 171 171 0
(XIV) PQC (CUBE) MORT&H - Section 600 727 727 0 40 40 0 767 767 0 24 0 311 311 0
(XV) PQC ( BEAM) MORT&H - Section 600 727 727 0 40 40 0 767 767 0 25 0 312 312 0
13.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 500 500 0 58 58 0 558 558 0 18 0 91 91 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 358 358 0 19 19 0 377 377 0 6 0 43 43 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 682 682 0 22 22 0 704 704 0 8 0 114 114 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 303 303 0 23 23 0 326 326 0 10 0 78 78 0
(v) M-30 RCC (SET) MORT&H - Section 1700 1993 1993 0 77 77 0 2070 2070 0 32 0 365 365 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 484 484 0 10 10 0 494 494 0 3 0 96 96 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 724 724 0 0 0 0 724 724 0 0 0 157 157 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 854 854 0 86 86 0 940 940 0 15 0 204 204 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 31 31 0 7 7 0 38 38 0 2 0 21 21 0
(X) M40 PILE (SET) MORT&H - Section 1700 27 27 0 16 16 0 43 43 0 4 0 24 24 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
(XII) M-45 PSC (SET) MORT&H - Section 1700 7 7 0 15 15 0 22 22 0 5 0 5 5 0
(XIII) M50 PSC (SET) MORT&H - Section 1700 0 0 0 4 4 0 4 4 0 3 0 3 3 0
(XIV) PQC (CUBE) MORT&H - Section 600 464 464 0 75 75 0 539 539 0 26 0 132 132 0
(XV) PQC ( BEAM) MORT&H - Section 600 464 464 0 75 75 0 539 539 0 26 0 132 132 0
14.0 CONCRETE CUBE/BEAM TESTING (MIX DESIGN
TRIALS)
14.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(v) M-35 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 3 3 0 3 3 0 6 6 0 2 0 5 5 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 2 2 0 0 0 0 2 2 0 0 0 2 2 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 72 72 0 4 4 0 76 76 0 2 0 41 41 0
(ix) M40 PILE (SET) MORT&H - Section 1700 53 53 0 0 0 0 53 53 0 0 0 16 16 0
(x) DLC MORT&H - Section 600 6 6 0 0 0 0 6 6 0 0 0 25 25 0
(xi) PQC MORT&H - Section 600 54 54 0 0 0 0 54 54 0 0 0 35 35 0
(xii) M50 PSC MORT&H - Section 1700 13 13 0 4 4 0 17 17 0 2 0 11 11 0
14.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(v) M-35 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 4 2 0 3 3 3 7 5 3 2 0 5 5 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 26 0 0 0 0 0 26 0 0 0 0 26 26 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 51 51 0 4 4 4 55 55 4 2 0 10 10 0
(iX) M40 PILE (SET) MORT&H - Section 1700 49 47 0 0 0 0 49 47 0 0 0 11 11 0
(x) PQC MORT&H - Section 600 53 53 0 0 0 0 53 53 0 0 0 7 7 0
(XI) M50 PSC MORT&H - Section 1700 12 12 0 4 4 4 16 16 4 2 0 6 6 0
15.0 THIRD PARTY TESTING
15.1 Soil Testing
(i) FSI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(ii) GSA (Silt & Clay) As Required 13 13 0 0 0 0 13 13 0 0 0 0 0 0
(iii) LL / PL / PI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(iv) MDD / OMC As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(v) CBR Test As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vi) Shrinkage Limit As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vii) Soluble Sulphate Test As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(viii) Soil Bearing Capacity (Plate Load Test) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(IX) C & Φ Value As Required 12 12 0 0 0 0 12 12 0 0 0 0 0 0
15.2 Steel
(i) 8mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
(ii) 10mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iii) 12mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iv) 16mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) 20mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(vi) 25mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(vii) 32mm (3pc = 1 set) 1 test / lot 3 3 0 0 0 0 3 3 0 0 0 0 0 0
(viIi) 36mm (3pc = 1 set) 1 test / lot 3 3 0 0 0 0 3 3 0 0 0 0 0 0
15.3 Aggregate
(i) Fine Aggregate As Required 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(ii) Coarse Aggregate (10mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iii) Coarse Aggregate (20mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iv) Coarse Aggregate (40mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) GSB As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.4 Cement
(i) Ultratech (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(ii) Shree (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.5 Water As Required 4 4 0 0 0 0 4 4 0 0 0 0 0 0
15.6 Hume pipe Testing(1200mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.7 Hume pipe Testing(600mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.8 Admixture As Required 3 3 0 0 0 0 3 3 0 0 0 0 0 0
16.0 CALIBRATION IN-HOUSE
16.1 Batching Plant CP-30 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.2 Batching Plant CP-2.50 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.3 Batching Plant CP-18 6 Month 3 3 0 0 0 0 3 3 0 0 0 1 1 0
16.4 Hot Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.5 WMM Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 1 1 0
ANNEXURE -"F"
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
AUTHORITY'S ENGINEER : MSV INTERNATIONAL INC.
: M/s DILIP BUILDCON LIMITED
EPC CONTRACTOR M/s VARAHA INFRA LIMITED (JV)