ANNEXURE - "C" -MPR FOR QUALITY CONTROL

QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH OCTOBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
1.0 TESTS ON BORROW AREAS FOR EMBANKMENT AND SUBGRADE/FLY ASH
1.1 FSI 1 test / 1500 mᶟ 562 562 0 24 24 0 586 586 0 5 0 207 207 0
1.2 GSA 1 test / 1500 mᶟ 562 562 0 24 24 0 586 586 0 5 0 209 209 0
1.3 LL / PL / PI 1 test / 1500 mᶟ 703 703 0 24 24 0 727 727 0 5 0 209 209 0
1.4 MDD / OMC 1 test / 1500 mᶟ 710 710 0 24 24 0 734 734 0 5 0 215 215 0
1.5 CBR Test 1 test / 3000 mᶟ 363 363 0 8 8 0 371 371 0 6 0 203 203 0
1.6 FDD (Emb. Layer) 1 set / 3000 m² 25027 24987 40 1370 1362 8 26397 26349 48 415 0 12884 12884 0
1.7 FDD (Sub. Layer) 1 test / 2000 m² 8656 8629 27 560 554 6 9216 9183 33 143 0 5301 5301 0
2.0 TESTS ON OGL SAMPLES (MCW&SR)
2.1 FSI 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.2 GSA 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.3 LL / PL / PI 1 test / 250m 206 206 0 0 0 0 206 206 0 0 0 83 83 0
2.4 MDD / OMC 1 test / 250m 211 211 0 0 0 0 211 211 0 0 0 84 84 0
2.5 CBR Test As Required 32 32 0 0 0 0 32 32 0 0 0 16 16 0
2.6 FDD (OGL) Min. 6 Pit 1632 1632 0 12 12 0 1644 1644 0 3 0 1137 1137 0
3.0 TESTS ON EXCAVATED SOIL
3.1 FSI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.2 GSA 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.3 LL / PL / PI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.4 MDD / OMC 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.5 CBR Test As Required 7 7 0 0 0 0 7 7 0 0 0 5 5 0
4.0 TEST ON GRANULAR SUB BASE COURSE (GSB)
4.1 GRADATION 1 test / 400 mᶟ 789 789 0 37 37 0 826 826 0 8 0 341 341 0
4.2 LL / PL / PI 1 test / 400 mᶟ 789 789 0 37 37 0 826 826 0 5 0 286 286 0
4.3 MDD / OMC 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.4 CBR Test 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.5 AIV As Required 15 15 0 0 0 0 15 15 0 0 0 16 16 0
4.6 FDD (GSB) 1 test / 1000 m² 1789 1782 7 106 102 4 1895 1884 11 32 0 821 821 0
5.0 TEST ON AGGREGATE BASE COURSE (WMM)
5.1 Mix Aggregate Gradation 1 test / 200 mᶟ 812 812 0 36 36 0 848 848 0 9 0 326 326 0
5.2 Plasticity Index 1 test / 200 mᶟ 786 786 0 36 36 0 822 822 0 4 0 266 266 0
5.3 AIV 1 test / 1000 mᶟ 216 216 0 19 19 0 235 235 0 3 0 77 77 0
5.4 MDD / OMC 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 4 4 0
5.5 Water Absorption 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 3 3 0
5.6 FI & EI 1 test / 500 mᶟ 368 368 0 19 19 0 387 387 0 3 0 93 93 0
5.7 FDD (WMM) 1 Set of 3 test / 1000 mᶟ 3287 3259 28 90 90 0 3377 3349 28 32 0 1273 1273 0
5.8 FDD (DLC) 1 Set of 3 test / 2000 mᶟ 551 551 0 15 15 0 566 566 0 5 0 180 180 0
5.9 FDD (SHOULDER) 1 test / 2000 m² 474 474 0 0 0 0 474 474 0 0 0 216 216 0
5.10 FDD (MEDIAN) 1 test / 2000 m² 105 105 0 0 0 0 105 105 0 0 0 45 45 0
5.11 FDD (BACKFILLING) MIn. 3 Pit 216 216 0 0 0 0 216 216 0 0 0 63 63 0
6.0 FINE AGGREGATE (SAND FOR CONCRETE)
6.1 Sieve Analysis / Gradation On Daily Basis 384 384 0 29 29 0 413 413 0 5 0 179 179 0
6.2 Specific Gravity (SSD) As Required 80 80 0 0 0 0 80 80 0 0 0 40 40 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH OCTOBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
6.3 Water Absorption / Moisture Content On Daily Basis 353 353 0 29 29 0 382 382 0 8 0 168 168 0
6.4 Silt Content Once in a week 128 128 0 5 5 0 133 133 0 2 0 106 106 0
7.0 COARSE AGGREGATE (FOR CONCRETE)
7.1 Sieve Analysis / Gradation of 10mm On Daily Basis 472 472 0 29 29 0 501 501 0 6 0 189 189 0
7.2 Sieve Analysis / Gradation of 20mm On Daily Basis 468 468 0 29 29 0 497 497 0 6 0 189 189 0

7.3 Sieve Analysis / Gradation of All in Aggregate On Daily Basis 354 354 0 15 15 0 369 369 0 3 0 144 144 0

7.4 Specific Gravity (3test = 1 set) As Required 81 81 0 0 0 0 81 81 0 0 0 35 35 0


7.5 AIV One for each source 106 106 0 4 4 0 110 110 0 2 0 44 44 0
7.6 FI & EI One for each source 85 85 0 2 2 0 87 87 0 1 0 35 35 0
7.7 Water Absorption / Moisture Content On Daily Basis 315 315 0 29 29 0 344 344 0 8 0 116 116 0
8.0 CEMENT/FLY ASH
Physical Tests (Cement)
8.1 Fineness Test 1 test per lot 166 166 0 5 5 0 171 171 0 1 0 54 54 0
8.2 Standard Consistency Test 1 test per lot 136 136 0 5 5 0 141 141 0 1 0 49 49 0
8.3 Soundness Test 1 test per lot 116 116 0 2 2 0 118 118 0 1 0 44 44 0
8.4 Intial & Final Setting Time Test 1 test per lot 136 136 0 5 5 0 141 141 0 1 0 49 49 0
8.5 Compressive Strength Test 1 test per lot
(i) 3 Days (Set) 77 77 0 1 1 0 78 78 0 1 0 33 33 0
(ii) 7 Days (Set) 80 80 0 1 1 0 81 81 0 1 0 34 34 0
(iii) 28 Days (Set) 89 89 0 1 1 0 90 90 0 1 0 39 39 0
Physical Tests (Fly Ash)
8.6 Gradation 1 test per lot 49 49 0 2 2 2 51 51 2 1 0 23 23 0
8.7 Fineness Test 1 test per lot 64 64 0 1 1 1 65 65 1 1 0 25 25 0
8.8 Sp. Gravity As Required 9 9 0 0 0 0 9 9 0 0 0 5 5 0
9.0 PRIME COAT / TACK COAT
9.1 Rate of Spray ( PRIME COAT ) 3 test / Day 263 263 0 18 18 0 281 281 0 6 0 122 122 0
9.2 Rate of Spray ( TACK COAT ) FOR DBM 3 test / Day 263 263 0 18 18 0 281 281 0 6 0 122 122 0
9.3 Rate of Spray ( TACK COAT ) FOR BC 3 test / Day 18 18 0 33 33 0 51 51 0 9 0 15 15 0
10.0 DENSE BITUMEN MACADAM (DBM)
10.1 Sieve Analysis 1 test for each 197 197 0 18 18 0 215 215 0 8 0 99 99 0

10.2 Bitumen Extraction & Gradation Test 400 ton of mix & Min. 2 211 211 0 18 18 0 229 229 0 8 0 113 113 0
test / day
10.3 Aggregate Impact Value 1 test / 350 mᶟ 121 121 0 6 6 0 127 127 0 2 0 45 45 0
10.4 Comb. Flakiness & Elongation Index 1 test / 350 mᶟ 121 121 0 6 6 0 127 127 0 2 0 42 42 0
10.5 GMM 1 test / day 108 108 0 6 6 0 114 114 0 4 0 55 55 0

10.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 420 420 0 18 18 0 438 438 0 8 0 196 196 0

10.7 Drilled Core Density 1test / 700 m² 451 451 0 24 24 0 475 475 0 11 0 242 242 0
10.8 Sp. Gravity & Water Absorption As Required 1 1 0 0 0 0 1 1 0 0 0 1 1 0
11.0 BITUMINOUS CONCRETE (BC)
11.1 Sieve Analysis 1 test for each 400 MT 15 15 0 32 32 0 47 47 0 12 0 18 18 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH OCTOBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
400 ton of mix & Min. 2
11.2 Bitumen Extraction & Gradation Test test / day
15 15 0 32 32 0 47 47 0 12 0 18 18 0

11.3 Aggregate Impact Value 1 test / 350 mᶟ 8 8 0 13 13 0 21 21 0 4 0 6 6 0


11.4 Comb. Flakiness & Elongation Index 1 test / 350 mᶟ 8 8 0 13 13 0 21 21 0 3 0 5 5 0
11.5 GMM 1 test / day 8 8 0 11 11 0 19 19 0 6 0 8 8 0

11.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 15 15 0 32 32 0 47 47 0 12 0 17 17 0

11.7 Drilled Core Density 1test / 700 m² 75 75 0 163 163 0 238 238 0 54 0 73 73 0
11.8 Sp. Gravity & Water Absorption As Required 1 1 0 0 0 0 1 1 0 0 0 1 1 0
12.0 BITUMEN VG-30
12.1 Penetration Grade at 25 Degree 1 test / lot 139 139 0 4 4 0 143 143 0 1 0 52 52 0
12.2 Softening Point 1 test / lot 139 139 0 4 4 0 143 143 0 1 0 52 52 0
12.3 Dutility at 27 Degree 1 test / lot 125 125 0 2 2 0 127 127 0 1 0 48 48 0
12.4 Viscosity 1 test / lot 101 101 0 2 2 0 103 103 0 1 0 43 43 0
12.5 Specific Gravity 1 test / lot 110 110 0 3 3 0 113 113 0 1 0 44 44 0
13.0 CONCRETE CUBE TESTING (SITE)
13.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 374 374 0 61 61 0 435 435 0 16 0 154 154 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 283 283 0 36 36 0 319 319 0 9 0 125 125 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 209 209 0 69 69 0 278 278 0 21 0 104 104 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 249 249 0 51 51 0 300 300 0 14 0 81 81 0
(v) M-30 RCC (SET) MORT&H - Section 1700 957 957 0 120 120 0 1077 1077 0 45 0 424 424 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 150 150 0 23 23 0 173 173 0 6 0 64 64 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 284 284 0 0 0 0 284 284 0 0 0 40 40 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 432 432 0 223 223 0 655 655 0 26 0 111 111 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 27 27 0 26 26 0 53 53 0 5 0 14 14 0
(X) M40 PILE (SET) MORT&H - Section 1700 30 30 0 16 16 0 46 46 0 6 0 10 10 0
(XI) M50 PSC (SET) MORT&H - Section 1700 1 1 0 6 6 0 7 7 0 5 0 6 6 0
(XII) M-45 PSC (SET) MORT&H - Section 1700 5 5 0 28 28 0 33 33 0 18 0 21 21 0
(XIII) DLC MORT&H - Section 600 582 582 0 4 4 0 586 586 0 2 0 171 171 0
(XIV) PQC (CUBE) MORT&H - Section 600 727 727 0 40 40 0 767 767 0 24 0 311 311 0
(XV) PQC ( BEAM) MORT&H - Section 600 727 727 0 40 40 0 767 767 0 25 0 312 312 0
13.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 500 500 0 58 58 0 558 558 0 18 0 91 91 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 358 358 0 19 19 0 377 377 0 6 0 43 43 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 682 682 0 22 22 0 704 704 0 8 0 114 114 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 303 303 0 23 23 0 326 326 0 10 0 78 78 0
(v) M-30 RCC (SET) MORT&H - Section 1700 1993 1993 0 77 77 0 2070 2070 0 32 0 365 365 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 484 484 0 10 10 0 494 494 0 3 0 96 96 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 724 724 0 0 0 0 724 724 0 0 0 157 157 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 854 854 0 86 86 0 940 940 0 15 0 204 204 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 31 31 0 7 7 0 38 38 0 2 0 21 21 0
(X) M40 PILE (SET) MORT&H - Section 1700 27 27 0 16 16 0 43 43 0 4 0 24 24 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH OCTOBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
(XII) M-45 PSC (SET) MORT&H - Section 1700 7 7 0 15 15 0 22 22 0 5 0 5 5 0
(XIII) M50 PSC (SET) MORT&H - Section 1700 0 0 0 4 4 0 4 4 0 3 0 3 3 0
(XIV) PQC (CUBE) MORT&H - Section 600 464 464 0 75 75 0 539 539 0 26 0 132 132 0
(XV) PQC ( BEAM) MORT&H - Section 600 464 464 0 75 75 0 539 539 0 26 0 132 132 0
14.0 CONCRETE CUBE/BEAM TESTING (MIX DESIGN
TRIALS)
14.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(v) M-35 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 3 3 0 3 3 0 6 6 0 2 0 5 5 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 2 2 0 0 0 0 2 2 0 0 0 2 2 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 72 72 0 4 4 0 76 76 0 2 0 41 41 0
(ix) M40 PILE (SET) MORT&H - Section 1700 53 53 0 0 0 0 53 53 0 0 0 16 16 0
(x) DLC MORT&H - Section 600 6 6 0 0 0 0 6 6 0 0 0 25 25 0
(xi) PQC MORT&H - Section 600 54 54 0 0 0 0 54 54 0 0 0 35 35 0
(xii) M50 PSC MORT&H - Section 1700 13 13 0 4 4 0 17 17 0 2 0 11 11 0
14.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(v) M-35 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 4 2 0 3 3 3 7 5 3 2 0 5 5 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 26 0 0 0 0 0 26 0 0 0 0 26 26 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 51 51 0 4 4 4 55 55 4 2 0 10 10 0
(iX) M40 PILE (SET) MORT&H - Section 1700 49 47 0 0 0 0 49 47 0 0 0 11 11 0
(x) PQC MORT&H - Section 600 53 53 0 0 0 0 53 53 0 0 0 7 7 0
(XI) M50 PSC MORT&H - Section 1700 12 12 0 4 4 4 16 16 4 2 0 6 6 0
15.0 THIRD PARTY TESTING
15.1 Soil Testing
(i) FSI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(ii) GSA (Silt & Clay) As Required 13 13 0 0 0 0 13 13 0 0 0 0 0 0
(iii) LL / PL / PI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(iv) MDD / OMC As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(v) CBR Test As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vi) Shrinkage Limit As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vii) Soluble Sulphate Test As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(viii) Soil Bearing Capacity (Plate Load Test) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(IX) C & Φ Value As Required 12 12 0 0 0 0 12 12 0 0 0 0 0 0
15.2 Steel
(i) 8mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH OCTOBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
(ii) 10mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iii) 12mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iv) 16mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) 20mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(vi) 25mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(vii) 32mm (3pc = 1 set) 1 test / lot 3 3 0 0 0 0 3 3 0 0 0 0 0 0
(viIi) 36mm (3pc = 1 set) 1 test / lot 3 3 0 0 0 0 3 3 0 0 0 0 0 0
15.3 Aggregate
(i) Fine Aggregate As Required 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(ii) Coarse Aggregate (10mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iii) Coarse Aggregate (20mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iv) Coarse Aggregate (40mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) GSB As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.4 Cement
(i) Ultratech (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(ii) Shree (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.5 Water As Required 4 4 0 0 0 0 4 4 0 0 0 0 0 0
15.6 Hume pipe Testing(1200mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.7 Hume pipe Testing(600mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.8 Admixture As Required 3 3 0 0 0 0 3 3 0 0 0 0 0 0
16.0 CALIBRATION IN-HOUSE
16.1 Batching Plant CP-30 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.2 Batching Plant CP-2.50 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.3 Batching Plant CP-18 6 Month 3 3 0 0 0 0 3 3 0 0 0 1 1 0
16.4 Hot Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.5 WMM Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 1 1 0

EPC Contractor Representative Authority's Engineer Representative


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Four-laning of Ambala - Kaithal Section of NH-65 from Km 0.000 (Ambala) to Km 50.860 (Pehowa) with
paved shoulder (length 50.860 km) in the State of Haryana under NHDP Phase-III on EPC Basis.

ANNEXURE -"F"
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
AUTHORITY'S ENGINEER : MSV INTERNATIONAL INC.
: M/s DILIP BUILDCON LIMITED
EPC CONTRACTOR M/s VARAHA INFRA LIMITED (JV)

DAILY WEATHER REPORT MONTH OCTOBER-2017


Location of Weather Station: DBL Base Camp @ 17+300 rhs Matheri
TEMPARATURE HUMIDITY RAINFALL
DATE STATUS REMARK
Min. ͦC Max. ͦC Min. Max. 24hrs (mm)
1-Oct-2017 25.8 36.1 52 87 0.00 SUNNY
2-Oct-2017 25.1 36.4 47 84 0.00 SUNNY
3-Oct-2017 24.9 36.4 48 82 0.00 SUNNY
4-Oct-2017 24.4 36.1 49 84 0.00 SUNNY
5-Oct-2017 24.7 36.2 40 82 0.00 SUNNY
6-Oct-2017 24.4 36.7 41 82 0.00 SUNNY
7-Oct-2017 23.9 36.7 42 81 0.00 SUNNY
8-Oct-2017 23.1 36.3 42 82 0.00 SUNNY
9-Oct-2017 23.3 36.1 44 84 0.00 CLOUDY+SUNNY
10-Oct-2017 23.6 36.2 42 81 0.00 SUNNY
11-Oct-2017 24.0 36.0 43 80 0.00 SUNNY
12-Oct-2017 24.1 35.8 46 79 0.00 SUNNY
13-Oct-2017 24.3 35.8 46 81 0.00 SUNNY
14-Oct-2017 22.1 34.9 42 81 0.00 SUNNY
15-Oct-2017 21.9 34.1 42 79 0.00 SUNNY
16-Oct-2017 21.0 33.8 38 78 0.00 SUNNY
17-Oct-2017 20.2 33.1 39 78 0.00 SUNNY
18-Oct-2017 19.8 33.1 35 76 0.00 SUNNY
19-Oct-2017 19.6 32.8 36 78 0.00 SUNNY
20-Oct-2017 19.9 33.2 35 77 0.00 SUNNY
21-Oct-2017 19.0 32.5 34 78 0.00 SUNNY
22-Oct-2017 19.1 32.1 35 78 0.00 CLOUDY+SUNNY
23-Oct-2017 18.5 31.6 34 80 0.00 CLOUDY+SUNNY
24-Oct-2017 17.8 31.0 32 81 0.00 SUNNY
25-Oct-2017 18.0 30.1 33 79 0.00 SUNNY
26-Oct-2017 18.4 29.8 37 79 0.00 SUNNY
27-Oct-2017 18.2 29.4 35 80 0.00 SUNNY
28-Oct-2017 17.4 29.9 34 80 0.00 SUNNY
29-Oct-2017 17.9 29.1 33 81 0.00 CLOUDY+SUNNY
30-Oct-2017 18.1 28.4 32 82 0.00 CLOUDY+SUNNY
31-Oct-2017 18.0 28.9 31 86 0.00 CLOUDY+SUNNY
Summary of Rain Fall In (mm)
Up to Previous Month (mm) During this Month Commulative (mm)
854.40 0.00 854.40
EPC Contractor's Representat Authority Engineer Representative.
NATIONAL HIGHWAYS AUTHORITY OF INDIA
Four-laning of Ambala - Kaithal Section of NH-65 from Km 0.000 (Ambala) to Km 50.860 (Pehowa) with paved shoulder (length 50.860 km) in the State of Haryana under NHDP Phase-III on EPC
Basis.

BORROW AREA SUMMARY

GRAIN SIZE ANALYSIS LIQUID LIMIT


Submitted/A
FSI MDD OMC CBR @ 97
BORROW DISTANCE FROM PPROVED SILT & DATE OF
VILLAGE LOCATION SIDE GRAVEL SAND LL PL PI % DRY REMARK'S
AREA NO. EXISTING CHAINAGE QTY. CLAY APPROVAL
DENSITY
(Cum)
% % % % % % % % %
01 (P-1) FUJALPUR 19+250 LHS APPROX. 8.0 KM 12000 11.98 2.15 53.45 44.40 23.59 N.P. N.P. 1.997 9.99 12.75 10/4/2016 APPROVED
01 (P-2) FUJALPUR 19+250 LHS APPROX. 8.0 KM 11760 12.75 2.15 53.12 44.74 23.88 N.P. N.P. 1.998 10.28 12.95 10/20/2016 APPROVED
01 (P-3) FUJALPUR 19+250 LHS APPROX. 8.0 KM 23760 15.56 1.04 39.93 59.03 29.47 N.P. N.P. 1.905 11.18 12.95 11/21/2016 APPROVED
02 (P-1) KHASPUR 15+800 LHS APPROX. 10.0 KM 6030 13.32 0.71 31.68 67.62 29.80 21.63 8.17 1.960 10.68 12.40 11/30/2016 APPROVED
02 (P-2) KHASPUR 15+800 LHS APPROX. 10.0 KM 18000 12.90 0.89 31.98 67.13 29.79 21.18 8.61 1.941 10.48 12.65 11/30/2016 APPROVED
03 (P-1) NAGGAL 20+100 LHS APPROX. 10.0 KM 12000 12.51 1.48 51.24 47.29 23.59 N.P. N.P. 1.988 10.53 12.70 11/30/2016 APPROVED
03 (P-2) NAGGAL 20+100 LHS APPROX. 10.0 KM 18000 12.87 1.42 50.59 48.00 22.92 N.P. N.P. 1.992 10.44 12.98 11/30/2016 APPROVED
04 (P-1) MAHRU 15+800 RHS APPROX. 14.0 KM 9000 13.38 1.16 28.57 70.28 30.17 21.88 8.29 1.877 11.27 12.17 11/29/2016 APPROVED
04 (P-2) MAHRU 15+800 RHS APPROX. 14.0 KM 42000 13.87 1.43 29.27 69.31 29.95 23.26 6.69 1.870 11.18 12.97 11/29/2016 APPROVED
06 (P-1) UNTSAR 06+000 RHS APPROX. 7.5 KM 18750 14.21 0.92 41.03 58.05 29.38 21.74 7.58 1.870 10.58 13.02 11/17/2016 APPROVED
07 (P-1) SEGTA 23+550 RHS APPROX. 2.0 KM 18360 13.47 0.93 39.05 60.02 30.05 22.60 7.46 1.900 10.50 12.95 11/17/2016 APPROVED
08 (P-1) BAROLI 23+200 LHS APPROX. 4.0 KM 36000 12.97 0.19 49.79 50.02 24.40 N.P. N.P. 1.939 10.56 13.73 11/22/2016 APPROVED
08 (P-2) BAROLI 23+200 LHS APPROX. 4.0 KM 6000 12.05 0.16 46.54 53.31 23.00 N.P. N.P. 1.952 10.75 - 4/15/2017 APPROVED
09 (P-1) UNTSAR 06+000 RHS APPROX. 8.0 KM 6120 12.55 0.56 39.63 59.81 32.63 22.78 9.84 1.810 11.90 12.40 11/22/2016 APPROVED
09 (P-2) UNTSAR 06+000 RHS APPROX. 8.0 KM 19380 11.12 0.35 38.18 61.46 32.75 22.89 9.86 1.833 11.69 12.67 4/17/2017 APPROVED
10 (P-1) BAROLI 23+200 LHS APPROX. 4.2 KM 27000 5.82 0.00 84.78 15.22 35.97 N.P. N.P. 1.670 13.32 - 11/23/2016 APPROVED
11 (P-1) JHANSA (THOL) 30+600 LHS APPROX. 8.5 KM 15000 13.12 10.82 39.58 49.60 31.53 22.69 8.83 1.966 10.74 - 11/9/2016 APPROVED
11 (P-2) JHANSA (THOL) 30+600 LHS APPROX. 8.5 KM 32925 12.94 10.78 39.74 49.48 31.16 22.39 8.77 1.963 10.75 11.31 11/22/2016 APPROVED
11 (P-3) JHANSA (THOL) 30+600 LHS APPROX. 8.5 KM 3000 13.36 9.91 37.92 52.17 31.33 21.98 9.35 1.963 10.61 10.18 4/19/2017 APPROVED
12 (P-1) NAISE 39+600 RHS APPROX. 4.0 KM 60000 12.48 0.72 20.92 78.36 33.64 21.47 12.18 1.884 11.39 12.50 11/28/2016 APPROVED
13 (P-1) JALBEDA 43+000 BHS APPROX. 0.2 KM 15000 13.99 0.64 29.22 70.14 33.24 23.08 10.16 1.910 11.65 9.98 11/24/2016 APPROVED
16 (P-1) UNTSAR 06+000 RHS APPROX. 10.0 KM 20160 22.54 0.00 15.22 84.78 36.80 20.74 16.07 1.861 12.26 9.90 11/28/2016 APPROVED
17 (P-1) SEGTA 23+550 RHS APPROX. 2.5 KM 10500 13.96 0.00 21.30 78.70 33.81 23.81 10.00 1.923 11.26 10.64 4/17/2017 APPROVED
18 (P-1) BAROLI 23+200 LHS APPROX. 4.5 KM 9000 9.99 0.00 70.76 29.24 27.04 N.P. N.P. 1.781 10.78 10.77 4/27/2017 APPROVED
19 (P-1) JANSUI 25+750 RHS APPROX. 0.3 KM 27000 15.69 0.00 11.23 88.77 31.99 21.37 10.62 1.930 10.47 12.36 4/19/2017 APPROVED
20 (P-1) DOMLI 09+500 RHS APPROX. 3.0 KM 17150 10.71 0.00 16.84 83.16 34.06 23.10 10.97 1.826 12.54 9.98 4/18/2017 APPROVED
21 (P-1) DEVINAGAR 04+400 RHS APPROX. 0.5 KM 9000 17.08 0.00 25.99 74.01 32.73 23.14 9.59 1.980 10.23 9.00 3/1/2017 APPROVED
22 (P-1) NESI 42+000 RHS APPROX. 4.0 KM 13950 15.50 0.00 37.17 62.83 24.19 N.P. N.P. 1.934 10.53 11.40 3/1/2017 APPROVED

EPC Contractor Representative Authority Engineer Representative


GRAIN SIZE ANALYSIS LIQUID LIMIT
Submitted/A
FSI MDD OMC CBR @ 97
BORROW DISTANCE FROM PPROVED SILT & DATE OF
VILLAGE LOCATION SIDE GRAVEL SAND LL PL PI % DRY REMARK'S
AREA NO. EXISTING CHAINAGE QTY. CLAY APPROVAL
DENSITY
(Cum)
% % % % % % % % %
23 (P-1) NEAR TOLL PLAZA 04+400 RHS APPROX. 1.0 KM 5292 12.15 0.00 17.98 82.13 27.38 N.P. N.P. 1.941 10.58 12.20 5/11/2017 APPROVED
24 (P-1) DEVINAGAR 03+500 RHS APPROX. 3.0 KM 30000 12.97 0.00 23.08 76.92 27.75 17.63 10.12 1.921 10.39 10.42 4/17/2017 APPROVED
25(P-1) SAKRAON 20+900 LHS APPROX. 1.5 KM 50400 13.18 0.00 24.46 75.54 28.05 17.70 10.35 1.921 10.76 10.48 4/18/2017 APPROVED
25(P-2) SAKRAON 20+900 LHS APPROX. 1.5 KM 20160 17.29 0.00 27.79 72.21 30.20 19.89 10.31 1.906 10.83 9.67 7/6/2017 APPROVED
26 (P-1) SURAJGARH 44+030 LHS APPROX. 1.6 KM 35990 13.50 0.00 36.79 63.21 28.24 N.P. N.P. 1.944 10.47 10.42 5/6/2017 APPROVED
27 (P-1) TEJAN 18+460 LHS APPROX. 3.0 KM 9053 17.09 0.00 37.55 62.45 30.94 19.05 11.89 1.943 10.38 10.52 5/13/2017 APPROVED
28 (P-1) GUMTI 29+300 LHS APPROX. 16.0 KM 37500 - - - - 18.75 NP NP 1.981 9.25 - 5/17/2017 APPROVED
29 (P-1) NAGGAL 23+200 LHS APPROX. 0.3 KM 15015 16.19 0.00 23.86 76.14 30.75 18.73 12.02 1.958 10.43 9.38 5/19/2017 APPROVED
30 (P-1) NAGGAL 23+528 RHS APPROX. 0.5 KM 17246 21.30 0.00 31.67 68.33 31.92 22.38 9.54 1.871 11.32 11.18 6/19/2017 APPROVED
31 (P-1) TALHERI 46+100 LHS APPROX. 2.0 KM 20966 18.02 0.00 40.75 59.25 30.45 21.55 8.90 1.838 10.18 10.84 5/19/2017 APPROVED
32 (P-1) TALHERI 7+600 LHS APPROX. 2.0 KM 9072 16.27 0.00 18.33 81.67 30.37 20.95 9.42 1.948 11.18 14.58 5/19/2017 APPROVED
33 (P-1) GOVINDGARH 18+460 LHS APPROX. 2.5 KM 9072 18.36 0.00 34.11 65.90 29.50 20.02 9.48 1.926 10.47 10.48 5/19/2017 APPROVED
35 (P-1) HASANPUR 24+020 LHS APPROX. 0.5 KM 10800 17.65 0.00 34.00 66.10 30.10 21.17 8.93 1.898 10.41 9.80 5/22/2017 APPROVED
36 (P-1) NESI 41+200 RHS APPROX. 2.2 KM 50058 19.43 0.00 39.44 60.56 30.01 21.29 8.72 1.891 10.50 10.78 6/5/2017 APPROVED
38 (P-1) RAMPUR 11+000 RHS APPROX. 4.0 KM 6000 15.82 0.00 39.10 60.90 29.15 21.26 7.89 1.850 10.43 12.00 6/3/2017 APPROVED
39 (P-1) SEGTA 23+528 RHS APPROX. 3.0 KM 13973 19.25 0.00 29.23 70.77 30.08 20.84 9.46 1.862 11.34 10.92 6/29/2017 APPROVED
15.55 0.00 23.31 76.69 30.57 21.64 8.93 1.912 10.85 11.94
41 (P-1) UNTSAR 11+000 RHS APPROX. 5.0 KM 43538 7/29/2017 APPROVED
6.45 0.00 86.00 14.00 25.83 NP NP 1.793 12.99 13.23
42 (P-1) THASKA MIRA JI 37+820 LHS APPROX. 3.0 KM 8190 18.34 0.00 24.32 75.68 30.05 20.64 9.41 1.898 10.58 11.47 7/31/2017 APPROVED
43 (P-1) NESI MIRA JI 42+500 RHS APPROX. 4.5 KM 51690 5.98 0.00 85.83 14.28 24.33 NP NP 1.800 12.65 14.65 8/23/2017 APPROVED
45 (P-1) KOURLI 00+000 RHS APPROX. 2.5 KM 7452 18.53 0.00 24.32 75.68 31.04 21.65 9.39 1.915 10.78 12.27 9/15/2017 APPROVED
46 (P-1) KOURLI 00+000 RHS APPROX. 2.3 KM 46219 18.50 0.00 24.07 75.93 31.04 21.62 9.42 1.939 10.50 12.85 9/16/2017 APPROVED
47 (P-1) JARAUT 00+000 LHS APPROX. 6.7 KM 5040 21.99 0.00 29.63 70.38 32.30 21.71 10.59 1.958 10.48 11.10 9/28/2017 APPROVED
48 (P-1) JARAUT 00+000 LHS APPROX. 6.8 KM 9900 21.18 0.00 24.87 75.13 31.94 21.84 10.11 1.954 10.31 11.60 10/9/2017 APPROVED
50 (P-1) NESI 42+250 RHS APPROX. 5.0 KM 23100 TESTING UNDER PROCESS
51 (P-1) MANIKPUR 2+000 RHS APPROX. 1.5 KM 12500 TESTING UNDER PROCESS
TOTAL QUANTITY (M3) ===>> 1065071