Sample KPI and KRA Manual

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 10

Name of the Dept: - Contracts

Sl No Key Performance Indicator Target Weight Target


Achieved

(a) (b) (c) (d) (e)

Mr XXXXXX
Turnaround time for the selection of contractor for the
1 07 days
contracts ≤ 5 Lakhs
2 Adherence to the contract budget 100%
Final Score

(f) =
(e)*100/(c)*(d)
Name of the Dept: - Design and Development

Sl No Key Performance Indicator Target Weight Target


Achieved

(a) (b) (c) (d) (e)

Preparation of master list of drawings with all the drawing


1 10 days
numbers and deliverable dates

2 Adherence to the shedule of master list of drawings 100%

Turnaround time for the issue of required drawings to the


3 45 days
Estimation or other concerned Dept with 100% accuracy

4 Number of revisions on the drawing submitted to the Zero/drawing


Estimation Dept and Site Execution Team
Final Score

(f) =
(e)*100/(c)*(d)
Name of the Dept: - Land Survey

Sl No Key Performance Indicator Target Weight Target


Achieved

(a) (b) (c) (d) (e)

Number of observations raised on the accuracy of the


1 demarcation exercise done for the buildings in XXXX Project Zero
Phase II

Variance between benchmark and actual measurement of


2 OGL for all the buildings in XXXXX Phase II Zero

Variance in estimated quantity and actual excavation


3 zero
quantity for each building of XXXXX Phase II
Turnaround time for contour and plane table survey of
4 village YYYYY, 70 acre land 8 days

Turnaround time for contour and plane table survey of


5 5 days
ZZZZZ, 28 acre land
Accuracy of measurement of OGL of all buildings in PPPPP
6 100%
and QQQQQ
7 Demarcation accuracy of XXXXXX in YYYYYY 100%
Final Score

(f) =
(e)*100/(c)*(d)
KRAs for Container Terminal Department

Target/Measure
Sl No KPI Statement Weight
with Timeline

(a) (b) (c) (d)


Turnaround time to move container from pre-gate to in-gate and
1 from in-gate to out-gate 40 ninutes

100 containers to
2 Turnaround time to load containers in a vessel with two cranes be loaded in ≤ 12
hours
Target
Final Score Remarks
Achieved

(e) (f) = ((d)*(e))/(c)


KRAs for Project Mechanical Department

Target/Measure with
Sl No KPI Statement
Timeline

(a) (b) (c)

Completion of pre-order ctivities and technology finalisation after


1 Two months
budgetary approval (in relation with consultant)
Technical evaluation, comparisons, and technical recommendations
2 One month
on of receipt of final offer
Turnaround time for creation of item codes, service code after
3 One month
finalisation of BOQ & placement of LOI/PO

4 Turnaround time for technical clarification, drawing and QAP approval One month
Weight Target Achieved Final Score Remarks

(f) =
(d) (e)
((d)*(e))/(c)