U-shaped grouting cell positioned at bottom of excavation (after Sliwinski
plates). This technique is similar to the Bauer system of tip grouting used on the Jedda- and Fleming, 1984). Mecca Expressway (Bruce, 1983) and the Brooklyn Queen’s Expressway (1988). The difference is that Lizzi had the plates covered with an impermeable liner to ensure that separation of grout injection ports and concrete was maintained (see Figure 9). The impermeable liner ensured that no permeation into the surrounding soil occurred.