SAMABULA ROOFING PROJECT

MATERIAL COST
DATE PARTICULARS AMOUNT ($)
Purchase Corrugated Iron from Longrun:
0.63 TCT MANOR RED XRW NZ STEEL
$ 11,904.00
COLORBOND AZ150 G300 (0.55 BMT) X
02-06-20 760MM PROFILE: CORRUGATED R/IRON
STD CORR RIDGE CAP - 25/1.800M $ 517.50
STD CORR FLASHING -10/ 1.800M $ 171.00
Screws Timber 14 X 65- MANOR RED 4100pcs $ 2,583.00
Purchased the Following items from R C Manubhai:
*Tropik Pine 75mm x 50mm 10/4.8m
*NZ Pine Dry Dressed all round 250mm x 25mm 6/4.8m
*NAIL JOLT HEAD GALVANISED 75mm [3""] x 3.75mm 1KG
02-06-20 $ 2,414.48
*NAIL JOLT HEAD GALVANISED 100mm [4""] x 4.50mm 1KG
*NAIL CLOUT GALVANISED 30mm [1-3/16""] x 2.80mm 1KG
*ALUMINIUM FOIL- FLAME RETARDANT (SISALATION) 1,250mm x 40mtrs
(50) DOUBLE SIDED
17-06-20 Purchased screws from Long Run Fiji 500pcs $ 315.00
Total Material Cost $ 17,904.98

LABOUR COST
DATE PARTICULARS AMOUNT ($)
Parnish Ram - Mileage Claim $ 225.00
31/5/20-22/06/20 Parnish Ram - Perdiem $ 5,610.00
Meal Allowance $ 50.00
Asaeli Tabuarua - Casual Handymans Wages ($310+ $365) $ 675.00
Esava Basaga- Casual Handymans Wages ($310+ $365) $ 675.00
Total Labour Cost $ 7,235.00
TOTAL COST $ 25,139.98