NHAI/KNT/Aurad-Bidar/2020/150645 Dated : 11.03.2020
CORRIGENDUM-6
Sub: Two Laning with paved shoulder from km. 0.000 to km. 45.878 of Aurad -
Bidar Section of NH-161A on EPC Mode under Bharatmala Pariyojna in the state of
Karnataka -Corrigendum-VI - reg.
Ref: NIT No. NHAI/KNT/LOT3/AURAD-BIDAR/2020/ 147603 dated 17.01.2020.
sir,
The bid due date for the subject project has been extended to 18.03.2020
at 11:00 AM. Further, the estimated cost of the project has been revised to Rs.
330.27 Cr. The Corrigendum on account of these changes is annexed herewith for
your reference.
Yours faithfully,
aes
(Akil Ahmad)
General Manager (T)-KNTCORRIGENDUM-VI
| S.No. | Clause Reference | Existing Clause Revised Clause
[Request for Proposal (RFP) Document
| x Bidding schedule Description | Existing bidding schedule | | | Description Revised bidding schedule
Bid due date 1203.2020 a 11:00 AM | Biddue dato 48.03.2000 at 11:00 AM
Opening of Technical bids 13.08.2020 at 11:30 AM
[Opening of Terie ids 19.03.2020 af 1:30
Notice Inviting
(wiry
Bid
Estimated Cost
Rs, 336.64 Crore
fal
[Estimated Cost T
Rs. 330.27 Crore _ |
"Clause 1.1.1 of RFP
Clause 2.2.2.2 (i) of
REP
Estimated Project Cost: Rs. 336.64 Crore 1
For demonstrating technical capacity and experience (the
Capacity”), the Bidder shall, over the past [5 (five]}
vears preceding the Bid Due Date, have received |
payments for construction of Eligible Project(s), or has
undertaken construction works by itself in a PPP project, such
that the sum total thereof, as further adjusted in accordance
with clause 2.2.2.5 (i) & (i), is more than Rs. 504,96 crore (Rs.
five hundred four crore and ninety six lakh only) [the
“Threshold Technical Capacity”)
Estimated Project Cost: RS. 330.27 Crore
For demonstrating technical capacity and experience (the
“Technical Capacity”), the Bidder shall, over the past [5 (Fve))
financial years preceding the Bid Due Date, have received
payments for construction of Eligible Projects), or has
undertaken construction works by itself in a PPP project, such
that the sum total thereof, as further adjusted in accordance with
clause 2.2.2.5 (i) & (i, is more than Rs. 495.41 crore (Rs. four
hundred ninety five crore and forty one lakh only) (the
“Threshold Technical Capacity’)
Clause 22.2.2
REP
) of
Provided that at least one similar work of 25% of Estimated |
Project Cost Rs. 84.16 crore (Rs. eighty four crore and sixteen |
lakh only ) shall have been completed from the Eligible Projects |
in Category 1 and/or Category 3 specified in Clause 2.2.2.5. For |
this purpose, a project shall be considered to be completed, if
more then 80% of the value of work has been completed and
such completed value of work is equal to or more than 25% of
the estimated project cost.
‘The sole Bidder or in case the Bidder being a Joint Venture, any
member of Joint Venture shall_necessarily demonstrate
Provided that st least one similar work of 25% of Estimated
Project Cost Rs. 82.57 crore (Rs. eighty two crore and fifty sever
lakh only ) shall have been completed from the Eligible Projects in
Category 1 and/or Category 3 specified in Clause 2.2.2.5. For this
Purpose, a project shall be considered to be completed, if more
than 90% of the value of work has been completed and such
completed value of work is equal to or more than 25% of the
estimated project cost:
The sole Bidder or in case the Bidder being a Joint Venture, any
member of Joint Venture shall necessarily demonstrate additional
7S.No.
‘Clause Reference
Existing Clause
Revised Clause |
‘additional experience in construction of _ Major
Bridge/ROBs/Flyovers in the last 5 (Five) financial years
preceding the Bid Due Date i. shall have completed atleast
1 Major Bridge/ROB/Flyover having span equal to or
an 16.25 meters.
‘experience in construction of Major Bridge/ROBs/Flyovers in the
last 5 (Five) financial years preceding the Bid Due Date i.e. shi
have completed atleast one similar Major Bridge/ROB/Flyover
having span equal to or greater than 16.25 meters.
RFP
Clause 22.26 (il) of
RFP.
(updated to the price level of the year based on
ingicated in table below) of Rs. 67.33 crore
crore and thirty three lakh only) for the last 5
years.
For a project to qualify as an Eligible Project under Categories 3
and 4, the Bidder should have received payments from its
for construction works executed, fully or part
executed and certified by the Engineer:
independent Engineer/Authority’s Engineer during the
ly preceding the Bid Due Date,
and only the amounts (gross) actually received/ work executed,
during such 5 (five) financial years shall qualify for purposes of
‘computing the Experience Score. However, receipts of or wor
executed amount less than Rs. 33.66 crore (Rs. thirty three
crore and sixty six lakh only) shall not be reckoned as receipts
for Eligible Projects. For the avoidance of doubt, construc
works shall not include supply of goods or equipment except
when such goods or equipment form part of a turn-key
construction contract / EPC contract for the project. Further,
the cost of land and also cost towards pre-construction
activities (like shifting of utilities etc.) shall not be included
hereunder,
| 6. Clause 2.2.2.3 (i) of | shall have a minimum Net Worth (th vancial | The Bidder shall have a minimum Net Worth (the “Financial
RFP Capacity") of Rs. 16.83 crore (Rs. sixteen crore and eighty | Capacity”) of Rs. 16.51 crore (Rs. sixteen crore and fifty one lakh
| three lakh only) st the close ofthe preceding financial year. | only) tthe close of the preceding financial year
[3 [etaase 22.23 Wi) of The Bidder shall have 2 minimum Average Annual Turnover i have @ minimum Average Annual Turnover |
ice level of the year based on factors indicated |
105 crore (Rs. sixty six crore and five lakh
) financial years |
only) for the last
For a project to qualify as an Eligible Project under Categories 3 |
and 4, the Bidder should have received payments its |
lien construction works executed, fully or partially, or
work executed and certified by the Engineer-in-
charge/Independent Engineer/Authority’s Engineer during the 5 |
ive) financial years immediately preceding the Bid Due Date,
and only the amounts (gross) actually received/ work executed,
during such 5 for purposes of
computing the Exp: ts of or work
executed amount 5. 33.03 crore (Rs. thirty three er
and three lakh only) shall not be reckoned as receipts for
Projects. For the avoidance of doubt, construction wot
include supply of goods or equipment except when such goods or
equipment form part of a turn-key construction contract / EPC
towards pre-construction acti
shall not be included hereunder.
ies (like shifting of ul