ITP For Construction of Curbs
ITP For Construction of Curbs
TABLE OF CONTENTS
Employer
Approved by Requirements/
1.2 Submit Drawings for Approval Prior to Start of Works GS/CONS X R Approved Drawings
Engineer/Consultant Specifications
As required, only approved project standard forms shall only be used (where applicable) for the request for inspection and test (RFIT), and
inspection and test checklist (ITC).