SHEIKH JABER AL-AHMAD AL-SABAH CAUSEWAY PROJECT (DOHA LINK)

DOCUMENT NUMBER TITLE REV Rev. Date PAGE


Inspection and Test Plan for
RA214-32-GEN-CS-ITP-000049 Construction of Curbs at Bridge Decks A0 26/09/2017 2 of 5
and Onshore Highway

TABLE OF CONTENTS

1. INSPECTION AND TEST PLAN ...................................................................................................... 3


2. ATTACHMENTS: FORM OF INSPECTION REPORT AND CHECKLISTS ............................... 5
1. Inspection and Test Plan (ITP)

Controlling Inspection Points


Acceptance Document / Verifying
No. Activity Frequency GS CONS Records
Criteria Requirement Personnel
Reference
1.0 Requirements Before Construction
Employer’s
Approved by Requirements/ Approved MS and
1.1 Submit MS and ITP for Approval Prior to Start of Works GS/CONS X R
Engineer/Consultant Specifications ITP

Employer
Approved by Requirements/
1.2 Submit Drawings for Approval Prior to Start of Works GS/CONS X R Approved Drawings
Engineer/Consultant Specifications

2.0 Incoming Materials Inspections


Conform to Drawings/ Drawings/
Inspection of Materials
Specifications/ Method Specifications/
- Concrete for Curb Foundations,
Statement / BSI BS EN Method Statement /
2.1 Curb As Required GS/CONS X, H W ICIM
1340-2003 Class 2 / BSI BS EN 1340-2003
-Expansion Joints (Bituminized
GSKRH Clause 505 / Class 2 / GSKRH
Celotex)
Approved RAM Clause 505

3.0 Construction Activities


Drawings/
Conform to Drawings/
Specifications/
Specifications/ Method RFIT for Location
Location Survey and Setting Out Method Statement /
3.1 Statement / BSI BS EN As Required GS/CONS X, H W Survey and Setting
of Curb Construction Areas BSI BS EN 1340-2003
1340-2003 Class 2 / Out, ITC
Class 2 / GSKRH
GSKRH Clause 505
Clause 505
Controlling Inspection Points
Acceptance Document / Verifying
No. Activity Frequency GS CONS Records
Criteria Requirement Personnel
Reference
Drawings/
Conform to Drawings/
Specifications/
Specifications/ Method RFIT for Location
Preparation Works Prior to Curbs Method Statement /
3.2 Statement / BSI BS EN As Required GS/CONS X, H W Survey and Setting
Construction BSI BS EN 1340-2003
1340-2003 Class 2 / Out, ITC
Class 2 / GSKRH
GSKRH Clause 505
Clause 505
Construction of Cast –In-Situ
Drawings/
Curb Foundation Conform to Drawings/
Specifications/
 Shape and Dimension Specifications/ Method
Check Method Statement /
3.3 Statement / BSI BS EN As Required GS/CONS X, H W RFIT, ITC
BSI BS EN 1340-2003
 Concrete Compressive 1340-2003 Class 2 /
Class 2 / GSKRH
Strength Test GSKRH Clause 505
Clause 505
 Workmanship
Construction of 20mm Drawings/
Conform to Drawings/
Sand/Cement Bed Specifications/
 Materials Specifications/ Method
Method Statement /
3.4 Statement / BSI BS EN As Required GS/CONS X, H W RFIT, ITC
 Thickness, Shape, and BSI BS EN 1340-2003
1340-2003 Class 2 /
Dimension Class 2 / GSKRH
GSKRH Clause 505
 Workmanship Clause 505

Installation of Precast Concrete


Curbs Drawings/
Conform to Drawings/
 Type Check Specifications/
Specifications/ Method
 Materials Method Statement /
3.5 Statement / BSI BS EN As Required GS/CONS X, H W RFIT, ITC
 Installation and BSI BS EN 1340-2003
1340-2003 Class 2 /
Workmanship Class 2 / GSKRH
GSKRH Clause 505
 Level Clause 505
 Thickness
Controlling Inspection Points
Acceptance Document / Verifying
No. Activity Frequency GS CONS Records
Criteria Requirement Personnel
Reference
Drawings/
Final Inspection of Completed Conform to Drawings/
Curb Construction Specifications/
Specifications/ Method
Method Statement /
3.6  Punch listing Statement / BSI BS EN As Required GS/CONS X, H W RFIT, ITC
BSI BS EN 1340-2003
 Damage Check 1340-2003 Class 2 /
Class 2 / GSKRH
 Workmanship Check GSKRH Clause 505
Clause 505

Legend: X – Execution of Inspection and Test


H – Hold Point (Party cannot proceed until specified action and signal off) GS – GS Engineering and Construction
W – Witness Point (Party must be notified and may attend test/inspection) CONS – Engineer/Consultant
R – Review of Inspection and Test Reports
RFIT – Request for Inspection and Test
ITC – Inspection and Test Checklist
ICIM – Inspection Checklist for Incoming Materials

2. Attachments: Forms of Inspection Report and Checklists

As required, only approved project standard forms shall only be used (where applicable) for the request for inspection and test (RFIT), and
inspection and test checklist (ITC).