Method Statement
Method Statement title. 220 KV Disconnector
Method Statement No. KP/01
Revision No. 00
Date of Issue. 13/7/2020
 
Owner/Client Contractor/ Job Performer

Logo: Logo:

   
       
Approved by: Prepared by:
Name - Muhammad Abdul Fareh Khan

   
   
Designation: Designation:
  Executive Engineer
   
   
   

Location of Work (as specific as possible)

 
Site Name: KAPCO
Specific Location of Task: 220 KV Disconnector
 
Description of Work: (Title)
220 KV Grid Station KAPCO

Start of work date     Expected Duration of Work


3 days 

JSA Completed?   R
Risk prediction completed and   R
reviewed?
Page: 2/8
Method Statement

Table of Contents
1 Introduction...................................................................................................................................3
2 Scope.............................................................................................................................................3
3 Reference Documents....................................................................................................................3
4 Summary of Equipment.................................................................................................................3
5 Method for execution of Excavation Work....................................................................................3
5.1 Manpower Requirement ........................................................................................................3
5.2 Sequence of the Work............................................................................................................4
5.3 Detail work procedure............................................................................................................4
5.4 Risk Assessment.........................................................................................................5
6 Personnel protective equipment.....................................................................................................6
7 Responsible personnel................................................................................................................6-8
Page: 3/8
Method Statement

1 Introduction
This method statement has been developed to comply with client’s requirements and will serve
as technical guidelines to installation of 220kV Isolator. This method statement will serve for
KAPCO Grid Station. This method statement is with reference to client’s specifications, quality
procedures and other related standards.

2 Scope
Dismantling and installation of 220 KV Isolator at new desired location.

3 Reference Documents
The work will be carried out in accordance with the following documents:
 HSE Plan
 Standard Work Instruction / Installation Procedure
 Approved Method Statement

4 Summary of Equipment
Normally following tools /Equipment will be used for the scope of work covered under this
method of statement:
 Safety tools and warning barriers
 Power & Mechanical Tools
 Slings
 Scaffolding & Accessories
 Power tools
 Crane/Fork lifter

5 Method for execution of Excavation Work


5.1 Manpower Requirement
1- Project Manager / Project Engineer
2- Site Manager
3- Site Supervisor
4- Skilled/unskilled labor
5- Helpers
6- EHS Supervisor
All the power tools should be operated by competent persons.
Page: 4/8
Method Statement
5.2 Sequence of the Work
Ensure all safety measures

Disconnection of Main Conductor /


Bus bar

Dismantling of old isolator and it’s


steel structure

Erection of steel structure and


installation of isolator at new desired
location

5.3 Detail of work Procedure.


 Inspection and shifting of isolator and it’s accessories
 Precautions shall be taken against live Electric Zones by providing hard barricade with
visuals in native language
 For all activities safety measure should be taken
 Erection of scaffolding or use of crane for the removal of main conductor / bus bar
 Dismantling of steel structure from current location
 Erection of steel structure at new desired location
 Installation of Isolator on steel structure.
 Connection of Main conductor / bus bar with the new installed isolator with the help of
hardware connector.

5.4 Risk Assessment


No. Hazard Control Measure
Page: 5/8
Method Statement
Use proper and right tool. Use PPE. Inspect and
1 Nails, sharp corners, tools
remove projected nails from formwork after use

Movement of materials by
Permit to Work System. Regular inspection and
2 defective plant equipment and
maintenance of plant equipments.
Dumper

3 Equipment hitting working people Trained people, tool box talks on regular basis

Adequate designed (as required) and checked


4 Incorrect formworks
formwork. Use of PPE at the time of execution

5 Dust/ Noise Use PPE, Masks, Earmuffs and goggles


Competent Scaffolds, Barricade area, Warning
6 Fall/ Trip
signs, tool box talks, safety harness
7 Accumulation of gas / water Supervision and continuous monitoring

Note: Supervisor and safety officer shall be alert and spot hazards (if any others) and will take
control measure. JSA will be provided at site

6 Personnel Protective Equipment


What PPE’s must be required?
Mandatory Task Specific

Tick the
check box
for
specifying
the Task
Specific
PPE’S Safety Safety Reflective Safety Ear Gloves Dust Face Safety Gas
Helmet goggle vest shoe Plugs Mask Shield Harness Mask

         

Specify the names of additional task specific PPE’s (If Required)


Rubber boots and rubber gloves for concrete work

7 Responsible Personnel

PROJECT MANAGER

HSE In charge Site Engineer


Page: 6/8
Method Statement

Electrical
Supervisor

Technicians Foremen

Skilled Labor Unskilled Labor

Project Manager/ Project Engineer


 Review SOW, drawings & Specification of the project to be executed.
 Coordinate with Client Representative.
 If there is any discrepancy in drawings, specifications etc.
 Visit the work site before start execution.
 Identifies resources needed and assigns individual responsibilities.
 Manages day-to-day operational aspects of a project.
 Effectively applies our methodology and enforces project standards.
 Responsible for looking after all quality assurance / quality control functions.
 Visit site and monitor site activities as per schedule.
 Deal with client representative regarding daily observations & requirements of site.
 Monitor & Manage the entire project in all aspects to continue smooth operations at site.
 Prepare daily progress reports and send them to client.
 Appreciate the EHS responsibilities of personnel under his authority and ensure that each
employee knows his / her responsibility and suitably equipped to perform tasks safely in their
respective area of responsibility.
 Ensure site safety rules and legal & other requirements are identified and implemented.
 Ensure that all employees are provided with appropriate personal protective equipment and
received EHS induction, training, appropriate tools/equipment/machines to perform their task
safely.

Site Manager
 Monitor all aspects of Quality Control relative to civil works during construction to ensure
adherence to the technical requirements.
 Provide expertise to site team to avoid/resolve quality problems.
 Determines project schedule by studying project plan and specifications; calculating time
requirements sequencing project elements.
Page: 7/8
Method Statement
 Prepares project status reports by collecting, analyzing, and summarizing information
and trends recommending actions.
 Routinely report job progress status.
 Assist project manager in providing technical excellence and standards for the execution.
 Prepare work force staffing requirements and process schedules for projects.
 Maintains safe and clean working environment by enforcing procedures, rules, and
regulations
 Assist with proposals.
 Routinely communicate with Client counterpart on project.
 To read, understand and implement the Company Safety Policy and the arrangements
described in the Company and area Safety Management System documents.
 Act as acting project manager in the absence of project manager.
 Support Site EHS Officer to ensure that all activities are being performed in a safe manner.
HSE In Charge
 To conduct site safety orientation of all staff, workers and visitors deputed/visited at site.
 Inspection of Material/Equipment/tools includes vehicles, hand and power tools, Fire
available at site.
 Tool box talk with contractor supervisors and workers regarding work specific hazards and
their control. Making sure of permits availability before commencing the task of each
working day.
 Proper barrication of the area and sufficient sign posts are available at site.
 Maintain a close co-ordination with the entire field HSE inspector.
 Shall visit the site daily and spend at-least hours of his time on all ongoing site locations &
shall record his observations violations / non conformances.
 Shall forward the noted observations / violations / non-conformance via daily site observation
sheet to the respective field HSE inspector deputed with an agreed date of closure.
 Shall liaise with the reporting requirements of the client (if any)
 Shall monitor the close out of any actions clients / reports / observation sheet generated by the
client in close co-ordination with the HSE manage
 Shall verify & monitor that acceptable level of housekeeping is maintained at all times at the
work location.
 Maintain, verify & monitor the conductance of tool box talk by respective field HSE
inspector.
 Shall be discussing the highlighted reported HSE violations with PM subsequently initiating
appropriate action.
HSE Supervisor
 Ensure their full time presence on site.
 Identify record & close out the violations & non conformances on the site in co-ordination
with the HSE in charge.
 Submit the daily observation sheet to the HSE in charge.
 Conduct the daily housekeeping inspection of the site record it & submit the same to the HSE
In-charge.
Page: 8/8
Method Statement
 Verify & maintain appropriate waste segregation a frequent waste dispose from site.
 Discuss the activity based / specific risk assessment in a tool box talk with all the workers
involved in the activity & forward the same to the HSE in charge.
 Inspect the site store area (if any) on the site & ensure the storage of material in safe manner
in liaison with the site store personnel.
 Ensure PPE compliance on site.
 Conduct the monthly inspection of the firefighting equipment on site record the same for
submission to HSE in charge.
 Conduct the emergency evacuation drill / medical drill on monthly basis & record the same
for submission to HSE in charge.
Appropriate quantity of all applicable PPEs are available with sub-contractor and also ensure 100 %
of PPEs at site.