Shinko KV centrifugal pumps have been designed and manufactured as cargo oil

unloading pumps for oil tankers. And, on the basis of our many years of experience
and service, consideration has been given to the following points in our design:

1. High efficiency
2. High performance under various suction conditions
3. Materials suitable for crude oil and product oil
4. Construction for minimizing vibration
5. Rigidity against external force

GENERAL CHARACTERISTICS
The vertical KV models are single-stage double suction cargo oil pumps. And, we have the following 7
standard models classified by capacity:
Model KV300 KV350 KV400 KV450-3 KV450-3A KV450-4 KV500-2A
Item
2000 3000 3500 4000
Normal capacity (m3/h) 1000 1500 4500 5500
2500 3500 4000 5000
1620 1410 1300 1180
Normal speed at total head 150m (min−1) 1900 1910 1190 1200
1650 1450 1300 1200
Rotation Counter-clockwise when viewed from coupling side
Suction bore (mm) 350 400 450 600 600 600 700
Discharge bore (mm) 300 350 400 450 450 450 500
Lubrication of pump bearing Grease lubrication
Amount of grease for upper side (g) 70 70 110 150 150 270 270
Amount of grease for lower side (g) 50 50 70 110 110 150 150
Lubrication of inter. shaft bearing Grease lubrication
Amount of grease for upper side (g) 70 70 110 150 150 270 270
Amount of grease for lower side (g) 70 70 110 150 150 270 270
Bulkhead stuffing box seal Grease lubrication
Amount of grease filled (g) 240 240 280 300 300 360 360
Brand of grease NLGI NO.2
Lubrication of gear coupling Gear oil
Amount of oil filled (R) 0.44 0.44 0.61 1.04 1.04 1.31 1.31
Brand of oil ISO VG680
Pump (bronze casing) 1030 1300 1400 2400 2400 3000 3650
Weight Inter. shaft 2m, floating shaft 2m
and bearing support 590 590 700 1050 1050 1300 1300
(kg)
Water in casing 200 300 450 850 850 1100 1600

PERFORMANCE CHART

1
DESIGN & MATERIALS
The cargo pump consists of a pump, a bulkhead stuffing box positioned between the pump room and the
engine room, an intermediate shaft, and a floating shaft.
The standard materials for parts and components are shown in the following table:

PART MATERIAL REQ.NO.


NAME OF PART FOR
NO. NAME JIS ASTM
1PUMP
EQUIVALENT
B584
1 VOLUTE CASING BRONZE CAC402 C92300 1
2 VOLUTE COVER 〃 〃 〃 1 424 416
A48
4 PUMP BED CAST IRON FC200 NO.35 1
7-1 BEARING HOUSING 〃 〃 〃 1
414 421
7-2 BEARING HOUSING 〃 〃 〃 1 404 417
9 BEARING COVER 〃 〃 〃 1
411 422
10 BEARING COVER 〃 〃 〃 1
14-1 BEARING INNER CASE 〃 〃 〃 1 402
14-2 BEARING INNER CASE 〃 〃 〃 1
PHOSPHOR B427
16 IMPELLER BRONZE CAC502A C90700 1
18 IMPELLER SHAFT STAINLESS STEEL SUS329J1 S32900 1 431
A276
19 IMPELLER KEY 〃 SUS304 304 1
20 COUPLING KEY CARBON STEEL S55C AISI1055 1
27 IMPELLER NUT SPECIAL
1 439 401
AL BRONZE
34 BALL BEARING SPECIAL STEEL 1
35 BALL BEARING 〃 1
B584 435
38 MOUTH RING BRONZE CAC406 C83600 2
B584
46-1 THROTTLE BUSH 〃 CAC604 C93800 1
46-2 THROTTLE BUSH 〃 〃 〃 1
412 403
46-3 OIL SEAL RUBBER 1
46-4 OIL SEAL 〃 1 419 415
B584
48-1 FLINGER BRONZE CAC403 C90500 1 423 418
48-2 FLINGER STAINLESS STEEL SCS13 A351 1
432 70
54A MECHANICAL SEAL 1SET -1
54B MECHANICAL SEAL 1SET 433 353
57 PACKING RING RUBBER 1
CARBON A686 20 354
70-1 SNAP RING TOOL STEEL SK85 WI-8 1
A276
70-2 SPLIT RING STAINLESS STEEL SUS304 304 1SET 420 9
CARBON A686
70-3 SNAP RING TOOL STEEL SK85 WI-8 1 14
B584 -1 34
146-1 MECHANICAL SEAL COVER BRONZE CAC406 C83600 1
146 48
146-2 MECHANICAL SEAL COVER 〃 〃 〃 1 -1 -1
353 BEARING NUT STEEL SS400 A283D 1
54A 7-1
354 BEARING WASHER 〃 〃 〃 1
18 46
401 BEARING SUPPORT 〃 〃 〃 1 -3
A48
402 BEARING CASE CAST IRON FC200 NO.35 1 19 46
-1
403 BEARING HOUSING 〃 〃 〃 1
2 27
404 BEARING COVER 〃 〃 〃 1
411 BALL BEARING SPECIAL STEEL 1 16 38
412 BALL BEARING 〃 1 70
-2 1
414 PACKING RING FELT 1
415 GLAND PACKING CARBONIZED FIBER 2
46
-2
416 SLEEVE CARBON STEEL S48C 1
54B
417 SLEEVE 〃 〃 1
146
418 SLEEVE 〃 〃 2 -2
419 COUPLING FLANGE 〃 〃 1 46
-4
420 COUPLING FLANGE 〃 〃 1
421 HUB 〃 〃 1
57
422 HUB 〃 〃 1 35
48
423 HUB 〃 〃 2 14 -2
424 COUPLING BOLT NUT & WASHER CARBON STEEL S45C AISI1045
3SETS -2
STEEL SS400 A283D 7-2
431 INTERMEDIATE SHAFT Cr-Mo STEEL SCM435 AISI4137 1 70
-3
432 FLOATING SHAFT 〃 〃 〃 1
4
10
433 COUPLING KEY CARBON STEEL S55C AISI1055 4
A276
435 BELLOWS STAINLESS STEEL SUS304 304 1
439 DOUBLING PLATE STEEL SS400 A283D 1

2
CONTROL SYSTEM

This system has been installed to implement automatic cargo unloading with only cargo pumps
to prevent not only cavitation but also gas and vapour intake.
The basic operation of this system is described as follows:
1. After starting the cargo pump, on the cargo control console:
(1) The NOR/CLOSE selector, which acts on the gas extraction
valve, is set to "NOR".
(2) The control switch, which acts on the vacuum pumps, is set
to "AUTO".
(3) The AUTO/MANUAL selector, which acts on the discharge
control valve, is set to "AUTO".

PUMP ROOM ENTRANCE

GAS
EXTRACTION
VALVE

RECIRCULATION GAS EXTRACTION PIPE
VALVE

Inert gas

EXHAUST
EXHAUST PIPE VALVE

UPPER DECK

ENGINE
SLOP TANK CARGO TANK ROOM
NON VACUUM ELECTRIC
RETURN PUMP MOTOR
VALVE

STARTER
SEALING
WATER
TANK

DRAIN SEPARATOR
VALVE

VACUUM PUMP UNIT

Level 7 0%

LEVEL Level 50%
TRANSMITTER

Level 5%
SUCTION
SUCTION PIPE VALVE

BELL− DRAIN TANK
MOUTH FOR
MAINTENANCE

3
2. When approaching the final unloading stage, the cargo liquid 4. When the vapour is extracted by the vacuum
level in the cargo tank lowers and part of the cargo becomes pumps, the separator level rises again.
vapour, which accumulates in the upper portion of the separator, If the level rises to 70%, the gas extraction
and the separator level begins to lower. valve closes. And, in 20 seconds, the vacuum
pumps stop and the discharge control valve
3. When the separator level lowers to 50%, the vacuum pumps opens.
start from an air signal sent from the level transmitter.
At the same time, the gas extraction valve is opened and the 5. The above-mentioned unloading process is
discharge control valve is throttled. repeated many times so as to prevent the
vapour from entering into the cargo pump
when the vapour accumulates in the separator.

6. When the level in the cargo tank lowers


further, a vortex takes place around the
CARGO CONTROL ROOM suction bell mouth and gas is taken in.
This gas is separated from the cargo in the
CARGO CONTROL CONSOLE
separator, and is accumulated at the upper
portion of the separator, which is the same
ELECTRIC CONTROL

STRIPPING
FINISH LAMP process as with the vapour.
LOW LEVEL PRESSURE
CIRCUIT

LAMP SWITCH VACUUM PUMP GAS


CONTROL
SWITCH
EXTRACTION
VALVE 7. If the level in the cargo tank lowers much
SEPARATOR
N/C SELECTOR
further, the liquid level around the bell
LEVEL & VALVE
POSITION GAUGE A/M MANUAL mouth fluctuates heavily and a large amount
of gas is taken in.
SELECTOR LOADER
AIR SET
SOLENOID
S VALVE
The separator level lowers substantially even
if the two vacuum pumps continue to run
Control
LOW
air
SELECTOR
simultaneously and the discharge control
0 . 7 MPaG
S RELAY

valve is at a very small opening degree.


If the separator level reaches 5%, the orange
Signal air 0.02∼0.1MPaG
PUMP ROOM low level lamp on the console turns on to
indicate that the unloading process has entered
Signal air 0 . 0 2 ∼ 0 . 1 MPaG

Signal air 0 . 0 2 ∼ 0 . 1 MPaG

into the end of the stripping stage.

8. When this condition continues for about 3


DISCHARGE PIPE

minutes, the orange stripping finish lamp


on the console flickers with a buzzing sound,
which indicates the completion of the
unloading work using this system.
AIR SET

GAS RELEASE Control
VALVE POSITIONER air
0 . 7 MPaG

VALVE
POSITION
TRANSMITTER
BUTTER
−FLY
ACTUATOR
VALVE
DISCHARGECONTROL
CARGO VALVE
OIL PUMP

CARGO LIQUID
SEALING WATER
SEALING WATER & GAS
NON-RETURN COMPRESSED AIR
VALVE
SIGNAL AIR
ELECTRIC WIRE

4
●OCIMF Recommendation (option) (CARGO CONTROL ROOM)

For pump room safety, OCIMF recommendations are as CARGO CONSOLE

follows: BH. S. BOX TEMP.


PUMP
CRT
VIB.
Temperature Monitoring PP BRG TEMP.
(UPP. SIDE)
MONITOR

All cargo pump glands, bearings, and casings should be PP CSG TEMP. VIB. ALM LAMP
equipped with a temperature monitoring system with PP BRG TEMP.
MECH. LEAK ALM LAMP
remote read-outs, alarm, and shut-down functions. (LOW. SIDE)

Vibration Monitoring (ENGINE ROOM)


Fixed vibration monitoring equipment is provided on all
centrifugal cargo pumps. The equipment should include GROUP BOARD

a remote alarm facility. TEMP. MONITOR


TRIP
Cargo Pump Leakage Detection RELAY
BOX
All centrifugal cargo pumps should be equipped with a
double seal arrangement designed to contain any

leakage from the shaft seal and to provide remote alarm ∼
indication of its occurrence.
BARRIER

BULKHEAD

(PUMP
ROOM) STUFFING BOX
JUNC. BOX
JUNC. BOX

VIB. SENSOR

BEARING HOUSING MECH.


PUMP CASING LEAK
SENSOR

Disch. Suc.
FS-P

Dimensions:mm
KV450-3
Model KV300 KV350 KV400 KV450-3A KV450-4 KV500-2A

Suc. 350 400 450 600 600 700


Bore
A A
Disch. 300 350 400 450 450 500
B 350 400 500 600 650 650

C 700 800 850 1000 1100 1200


E 400 450 450 600 600 700
F 500 570 550 640 700 760

G 580 650 720 850 920 970


H C
P 420 420 465 610 660 755
FOR REMOVAL OF
VOLUTE COVER B Q 450 450 500 650 700 800
DISCH.

U V
R 360 360 390 530 580 680
S 150 150 200 300 320 400

E

T 230 230 255 340 370 430


R SUC.

P U 120 120 170 250 275 335



V 80 80 80 90 95 95
Z 35 35 35 42 42 48
8−φZ FOUNDATION BOLT HOLES H min. 700 750 840 1080 1180 1310
ARROW A−A min. 2550 2620 2710 3350 3570 3620
W
max. 3730 3800 4320 4950 5375 5470