TO : LUKMAN HAKIM OUR REF : 016/IK/X1/2015

ADDRES : JAKARTA DATE : 23 November 2015


Telp : TERM : -
Fax : PIC :
Email : CURRENCY : IDR
ATT : PAGE : -

Harga Satuan /
No. Referensi Nama Barang Jumlah Harga Status
pcs

1 PEKERJAAN ELEKTRIKAL STANDART


2 Komponen Gardu
3 ● Transformator 1000 Kva 231,000,000 1 pcs 231,000,000
4 ● Cubikel PB Trafo 34,875,000 1 lot 34,875,000
5 ● Cubikel LBS 55,647,000 1 pcs 55,647,000
6 ● CAPACITOR BANK 600 KVARH 123,120,000 1 pcs 123,120,000
7 ● PANEL LVMDP 1600 AMP 98,700,000 1 pcs 98,700,000
8 ● SUB PANEL SDPAS /dE 250 amp 9,890,000 5 pcs 49,450,000
9 ● SUB PANEL SDP F. 400 AMP 15,890,000 1 pcs 15,890,000
10 ● PANEL KD 8 X 30 AMP (80 kp) 7,890,000 2 pcs 15,780,000
11 ● PANEL BOILER / STAR DELTA ? 1 pcs
12 ●PANEL STAR DELTA BLOWER 75 AMP 25,900,000 1 pcs 25,900,000
13 ● PANEL Y Δ BLOWER TRANS 30 AMP 18,000,000 1 pcs 18,000,000
14 ● PANEL PENERANGAN ? 1 pcs
15 KABELINDO ● Kabel XLPE ukuran 3 x 240 mm 1,365,000 70 mtr 95,550,000
16 KABELINDO ● Kabel 1 x 240 mm 301,000 1 pcs 301,000
17 KABELINDO ● Kabel TM N2XBY 1 X 70MM 30 mtr -
18 KABELINDO ● TERMINATING TM 3,800,000 4 pcs 15,200,000
19 KABELINDO ● ELASTIMOL ( TM ) 1 pcs -
20 KABELINDO ● SILINGEND ( TM ) 1 pcs -
21 KABELINDO ● SEUN VINYL KABEL TIS ISOLASI 1 pcs -
22 ● TRAY CABLE 400 X 50 536,800 50 mtr 9,125,600
23 ● PEMASANGAN LAMPU pcs -
24 ● BIKIN GARDU PABRIK STANDART 1 pcs -
-
Note :
- Term of payment 50% DP 7 days after PO,
Bruto 788,538,600
50 % cash Before delivery, 3 working days before DO
Disc
- This quotation valid until a week (7 days)
- Stock condition is READY for now
PPN 78,853,860
- Delivery FOB Jakarta
Netto 867,392,460

Thanks & regards,

Gustaf
Technical Engineering - Facility Manager