Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

UEM CONSTRUCTION

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN RAWANG AND IPOH (BALANCE OF WORKS)
RAIL WELD JOINT ULTRASONIC TEST RECORD

SUBCONTRACTOR: REFERENCE:
BLOCK SECTION: From to DATE OF TEST:
Up/ Down Line RHS/ LHS TYPE OF WELD:

LOCATION: 0 45 45 70 DEGREE PROBE - RAIL FOOT


JOINT REF.: DEGREE TANDEM DEGREE DEGREE FIELD SIDE GAUGE SIDE
PROBE SINGLE SIDE
PANEL NO: TOE ANKLE TOE ANKLE
ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF
Threshold amplitude 20% 20% 40% 40% 40% 40% 40% 40% 25% 25% 25% 25% 25% 25% 25% 25%
% OF Full Scale
Stand Off Position (mrn)
Rail Depth (mm)
Individual Point Count
Sub Total Point Count Max 11
Amount of Hump * Please circle Result = PASS / FAIL
Total Points Max 12
* to be recorded it subtotal point count exceeds 10
Remarks:

Signature Name Designation Date


Recorded By USFD Operator:

Witnessed, Reviewed & Stamped By


Subcontractor's NDT Inspector
Witnessed & Verified By SE Rep.

UEMC-F-TW002, Rev.0,Date: 01-06-05


(Ranhill/ Minco)

UEMC-F-TW002, Rev.0,Date: 01-06-05

You might also like