P
Paintable, rapid, high
modulus polyurethane
sealant and adhesive
a
performance rating PW-EXT-INT-CC. dry. We recommend applying Primer A if the
M 4
absorbent surfaces are not solid enough, if
Mapeflex PU 45 FT hardens following its they have a slightly powdery surface or if the
PU
reaction with atmospheric humidity and its joints are subject to high mechanical stress or
special characteristics offers a guarantee frequent, prolonged contact with liquids.
of long service life. It may be used on both When applied on non-absorbent surfaces
horizontal and vertical surfaces. such as iron, steel, aluminium, copper,
The product is ready to use and is available ceramic, klinker, glass and zinc-plated sheet,
in both metal cartridges and soft cartridges Mapeflex MS45 forms a good bond if the
equipped with a special extrusion gun, which surface is cleaned with a suitable degreasing
makes the product particularly easy to apply. product. Applying Primer A on the surface
The consistency of the product is ideal for will improve adhesion over the years.
quick application and its rapid-hardening When applying on plastics, it may help to
characteristics allows the surface to be put roughen the surface by using fine sandpaper
into service quickly with resulting economic and then to apply a coat of Primer P,
advantages. special product for plastic materials.
Before painting over Mapeflex PU 45 FT
make sure it is completely polymerised. Application of Primer A
We recommend using elastomeric paint Apply with a brush a thin, even coat of
such as Elastocolor Paint after treating Primer A one-component polyurethane
the surface of the sealant with Colorite primer for absorbent surfaces on the areas
Performance. Always carry out preliminary where it is required.
tests to make sure the sealant and paint are Leave the primer to dry before applying the
compatible. sealant (around 2 hours at +23°C e 50% R.H.).
RECOMMENDATIONS Application of Primer M
•D o not use on dusty or flaky surfaces. Apply with an even coat of Primer A on the
• Do not use on damp surfaces. areas where it is required with a brush single
Flexible bonding of • Do not use to seal joints in stone and component, solvent-free polyurethane
construction members marble: use Mapesil LM. primer for non-absorbent surfaces around
and features •D o not use on surfaces which are dirty with the edges of the joint.
oil, grease or mould-stripping compounds, The successive sealant must only be
as the bonding could be compromised. applied once the primer is no longer sticky
•D o not use on bituminous surfaces where (after approximately 40 minutes at +23°C
the bleeding of oil may be present. and 50% R.H).
•D o not apply Mapeflex PU 45 FT if the
temperature is below +5°C. Application of Primer P
•D o not contaminate the surface of the Roughen the surface of the substrate, remove
product with alcohol while still wet to all loose and uneven areas and apply an even
prevent affecting its correct polymerisation. layer of Primer P, one-component solvent-
based primer. Leave to dry (approximately
APPLICATION PROCEDURE 20 minutes at +23°C) before extruding the
Preparation of surfaces to be sealed sealant.
or bonded
All the surfaces to be sealed or bonded must Preparation and application
be dry, sound and free of dust, crumbling of Mapeflex PU 45 FT when used
parts, oil, grease, wax and old paint. When as a sealant
used for sealing, Mapeflex PU 45 FT must 300 ml cartridge; place the cartridge in the
only bond perfectly to the sides and not to special extrusion gun, make a hole in the
the bottom. Therefore, in expansion and tip of the cartridge, screw on the extrusion
contraction joints, place a suitable diameter nozzle, cut the nozzle at an angle of 45° and
of Mapefoam compressible, closed-cell dependent on the width required. Squeeze out
Flexible sealing
expanded polyethylene cord at the bottom the product in a continuous flow into the joint.
of construction joints of the joint to leave a depth in the joint Take care to avoid entrapping air in the joint.
according to the table below: 600 ml cartridge; place the cartridge in the
special extrusion gun, cut off the tip of the
WIDTH OF JOINT DEPTH OF SEALANT
cartridge, cut the extrusion nozzle at an angle
of 45° and dependent on the width required.
Up to 10 mm Same as width
Squeeze out the product in a continuous flow
From 11 to 20 mm 10 mm in all cases
into the joint. Take care to avoid entrapping
air in the joint.
More than 20 mm Half the width
Immediately after extruding the sealant,
smooth over the surface with a tool with
Mapeflex PU 45 FT withstands movements a suitable size and shape while keeping it
when in service up to 20% of the average continuously wet with Mapei Easy Smooth
width of the sealed joint. If movements solution or soap and water.
are greater than 20% when in service, use
Mapeflex PU40 polyurethane sealant with a Preparation and application
low modulus of elasticity. of Mapeflex PU 45 FT when used
To avoid the sealant spreading out of the as a flexible adhesive
joint, and to leave an attractive finish, we When bonding sections with a restricted
recommend using masking tape along the surface area or weight, extrude single drops
edges of the joints, which must be removed of the product on the back of the section
immediately after smoothing off the sealant. and press it well down onto the substrate to
Mapeflex PU 45 FT bonds well even without spread the adhesive uniformly. When bonding
the use of a primer on substrates which are sections with a large surface area, extract a
TECHNICAL DATA (typical values)
PRODUCT IDENTITY
FINAL PERFORMANCES
Springback (%): 90
flex
pe5 FT
series of vertical, parallel beads around COLOURS AVAILABLE
a
15 cm apart and press on well to spread the Mapeflex PU 45 FT is available in white,
M 4
adhesive uniformly. 111 grey, 113 grey, beige, brown and black.
If required, the bonded element may be
PU
adjusted within approx. 6 minutes of laying at STORAGE
a temperature of +23°C. Mapeflex PU 45 FT may be stored for
When bonding heavy loads or in critical laying 12 months in a cool, dry place in its sealed,
conditions, extra support such as clamps or original packaging.