OCB AT LEVEL 18 STRUCTURAL DEFECTS PRELIMINARY REPORT

Project : OCIC New Office Building_OCB


Str.Def. No: 1
Date: 5-Feb-20
Attendee: CMED PMD
Note : This is just the preliminary Structural Defects report for level 18. Some item has not yet 100% installed and completed.
Total Defect is 44 nos.
Completed and done is zero nos.(0%)
Outstanding need to do rectified 44 nos.(100%)

No. Outstanding issue IMAGE Areas Location Remark

A. Level 18

1 Repair drop slab edge Slab drop Outstanding

2 Repair slab soffit Slab soffit Outstanding

3 Remve debris and repair slab soffit Slab soffit Outstanding

4 Repair slab soffit Slab soffit Outstanding

5 Remove debris, clean, repair slab drop Slab drop Outstanding

The edge between


6 Remove plywood slab soffit and slab Outstanding
drop

7 Remove plywood Slab soffit Outstanding

8 Remove debris Slab drop Outstanding

9 Remove plywood Slab drop Outstanding

10 Remove debris and plywood Slab soffit Outstanding

11 Repair edge slab drop Slab drop Outstanding

1
No. Outstanding issue IMAGE Areas Location Remark

12 Remove sack and excess concrete Column Outstanding

Between RC wall
13 Clean and remove debris
and slab soffit
Outstanding

14 Remove debris and repair beam Hang beam Outstanding

15 Remove plywood Slab soffit Outstanding

16 Remove plywood Slab soffit Outstanding

17 Remove debris and repair beam Hang beam Outstanding

18 Repair drop slab edges Slab drop Outstanding

Remove and clean masking tape


19 before start to do plastering work.
Column Outstanding

Remove and clean debris,and repair


20 edge slab drop
Slab drop Outstanding

21 Remove debris and repair beam Hang beam Outstanding

22 Remove masking tape Column Outstanding

2
No. Outstanding issue IMAGE Areas Location Remark

23 Remove and clean masking tape Slab soffit Outstanding

24 Repair edge slab drop Slab drop Outstanding

25 Repair RC wall RC wall Outstanding

26 Repair edge slab drop Slab drop Outstanding

27 Repair edge slab drop Slab drop Outstanding

28 Repair and clean debris slab drop Slab drop Outstanding

29 Remove rebar RC wall RC wall Outstanding

30 Remove sack and excess concrete Column Outstanding

31 Remove plywood Edge slab drop Outstanding

32 Remove excess concrete Stiffener Outstanding

33 Repair edge slab drop Slab drop Outstanding

34 Remove rebar Slab drop Outstanding

35 Remove debris beam Slab drop Outstanding

3
No. Outstanding issue IMAGE Areas Location Remark

36 Repair edge slab drop Slab drop Outstanding

37 Remove plywood Slab drop Outstanding

38 Repair slab soffit Slab soffit Outstanding

39 Remove and clean masking tape Slab drop Outstanding

40 Repair edge slab drop Slab drop Outstanding

Remove, chip, and clean excess


41 concrete RC wall at staircase area.
Staircase Outstanding

Remove, chip, and clean excess


42 concrete RC wall at staircase area.
Staircase Outstanding

Remove, chip, and clean excess


43 concrete RC wall at staircase area.
Staircase Outstanding

Remove, chip, and clean excess


44 concrete RC wall at staircase area.
Staircase Outstanding

Prepared By: Checked By:

Name: Deng Som Name: Ricardo Diga Jr


Position: Senior QAQC Position: QAQC Manager
Date: 05 Feb 2020 Date: 05 Feb 2020

4
OCB AT LEVEL 19 STRUCTURAL DEFECTS PRELIMINARY REPORT
Project : OCIC New Office Building_OCB
Str.Def. No: 1
Date: 24-Jan-20
Attendee: CMED PMD
Note : This is just the preliminary Structural Defects report for level 19. Some item has not yet 100% installed and completed.
Total Defect is 37 nos.
Completed and done is 7 nos.(19%)
Outstanding need to do rectified 30 nos.(81%)

No. Outstanding issue IMAGE Areas Location Remark

A. Level 19

1 Repair drop slab edge Slab drop Outstanding

2 Remove plywood and clean slab soffit Slab drop Outstanding

3 Remove plywood slab soffit Slab drop Outstanding

4 Remove debris and clean slab soffit Slab Outstanding

5 Remove debris and clean slab soffit Slab drop Outstanding

Remove plywood before start to do


6 plastering
Slab drop Edge Done

7 Repair honeycomb of column Column Done

8 Remove plywood slab soffit Slab drop Edge Outstanding

9 Remove plywood slab soffit Slab drop Edge Outstanding

10 Remove plywood slab soffit Beam edge Outstanding

11 Repair drop slab edge Slab drop Outstanding

1
No. Outstanding issue IMAGE Areas Location Remark

12 Remove and clean sack on column Column Outstanding

13 Clean and remove debris Hang beam Outstanding

14 Remove plywood and rectify slab soffit Slab Outstanding

Remove excess concrete and rectify


15 beam alignment
Hang beam Outstanding

16 Rectify drop slab panel edge Slab drop Outstanding

17 Remove tie wire column Column Done

18 Repair drop slab edges Hang beam Outstanding

19 Remove debris at column Column Done

Repair beam alignment & remove


20 debris & excess concrete
Hang beam Outstanding

21 Remove plywood and tie wire Column Outstanding

22 Remove debris Slab drop Outstanding

2
No. Outstanding issue IMAGE Areas Location Remark

23 Remove rebar Slab Outstanding

Remove plywood and expose


24 concrete
Slab Done

25 Clean and remove debris Hang beam Outstanding

Between slab soffit


26 Remove plywood
and column
Done

27 Remove plywood Slab drop Outstanding

Remove slab drop panel and repair


28 edge
Slab drop Outstanding

29 Remove plywood Slab drop Edge Outstanding

30 Remove plywood Slab Outstanding

31 clean and remove rebar Slab drop Outstanding

32 Clean and remove debris Slab Outstanding

Between slab soffit


33 Remove plywood
and drop
Outstanding

34 Clean and remove debris Slab drop Outstanding

Remove, chip, and clean excess


35 concrete RC wall at staircase area.
Staircase Outstanding

3
No. Outstanding issue IMAGE Areas Location Remark

Remove, chip, and clean excess


36 concrete RC wall at staircase area.
Staircase Outstanding

Remove, chip, and clean excess


37 concrete RC wall at staircase area.
Staircase Outstanding

Prepared By: Checked By:

Name: Deng Som Name: Ricardo Diga Jr


Position: Senior QAQC Position: QAQC Manager
Date: 24 Jan 2020 Date: 24 Jan 2020

4
OCB AT LEVEL 20 STRUCTURAL DEFECTS PRELIMINARY REPORT
Project : OCIC New Office Building_OCB
Str.Def. No: 1
Date: 24-Jan-20
Attendee: CMED PMD
Note : This is just the preliminary Structural Defects report for level 20. Some item has not yet 100% installed and completed.
Total Defect is 38 nos.
Completed and done is 10 nos.(26%)
Outstanding need to do rectified 28 nos.(74%)

No. Outstanding issue IMAGE Areas Location Remark

A. Level 20

Between slab soffit


1 Remove plywood
and hang beam
Outstanding

2 Remove plywood Column Outstanding

3 Remove plywood Slab soffit Done

4 Clean debris Slab drop edge Outstanding

5 Rectify slab Slab drop edge Outstanding

6 Remove rebar Slab soffit Outstanding

7 Remove debris and clean Slab drop edge Outstanding

8 Remove rebar Slab drop Outstanding

9 Rectify between RC wall and slab RC wall Outstanding

10 Remove debris,clean,& repair Hang beam Outstanding

Remove excess concrete and rectify


11 beam alignment, and remove plywood
Hang beam Outstanding

1
No. Outstanding issue IMAGE Areas Location Remark

12 Remove tie wire Column Done

13 Remove plywood Slab soffit Outstanding

Remove debris, clean, remove excess


14 concrete, and rectify beam alignment
Hang beam Outstanding

15 Remove excess concrete and repair Slab drop edge Done

16 Remove plywood column Done

17 Repair honeycomb at RC wall Column Done

18 Remove plywood at column Slab soffit Done

Remove debris, clean at beam, and


19 rectify joints
Edge of slab soffit Outstanding

20 Remove plywood Slab soffit Outstanding

21 Remove rebar Slab drop Outstanding

22 Rectify edge of slab Slab drop edge Outstanding

2
No. Outstanding issue IMAGE Areas Location Remark

Clean, remove debris, and excess


23 concrete
Hang beam Outstanding

24 Repair RC wall RC wall Done

Between hang
25 Clean and remove debris
beam and column
Outstanding

26 Repair slab soffit Slab soffit Outstanding

27 Clean and remove debris at beam Hang beam Outstanding

28 Repair honeycomb at RC wall RC wall Outstanding

29 Repair honeycomb at beam Hang beam Outstanding

30 Repair honeycomb at slab soffit Slab soffit Outstanding

31 Remove rebar Slab soffit Outstanding

Slab soffit Outstanding

32 Remove plywood

Slab soffit

33 Repair honeycomb Slab drop Outstanding

34 Clean and remove debris Slab drop Outstanding

3
No. Outstanding issue IMAGE Areas Location Remark

35 Repair edge slab Slab drop Outstanding

36 Remove plywood Slab drop Outstanding

37 Clean slab soffit Slab drop Outstanding

38 Clean and remove debris Slab drop edge Outstanding

Prepared By: Checked By:

Name: Deng Som Name: Ricardo Diga Jr


Position: Senior QAQC Position: QAQC Manager
Date: 24 Jan 2020 Date: 24 Jan 2020

4
OCB AT LEVEL 21 STRUCTURAL DEFECTS PRELIMINARY REPORT
Project : OCIC New Office Building_OCB
Str.Def. No: 1
Date: 24-Jan-20
Attendee: CMED PMD
Note : This is just the preliminary Structural Defects report for level 21. Some item has not yet 100% installed and completed.
Total Defect is 16 nos.
Completed and done is 3 nos.(19%)
Outstanding need to do rectified 13 nos.(81%)

No. Outstanding issue IMAGE Areas Location Remark

A. Level 21

1 Rectify and repair alignment of beam Beam Outstanding

2 Remove plywood debris Beam Done

3 Remove debris Slab drop Outstanding

4 Clean and rectify alignment of beam Beam Outstanding

5 Remove excess concrete Beam Outstanding

6 Remove plywood Edge of slab Done

between slab and


7 Remove excess plywood
RC walls
Done

8 Remove plywood Slab soffit Outstanding

9 Remove plywood Slab soffit Outstanding

Honeycomb repair & chip excess


10 concrete
Slab drop Outstanding

11 Chip and repair excess concrete beam Outstanding

1
No. Outstanding issue IMAGE Areas Location Remark

12 Remove debris Slab drop Outstanding

between slab and


13 Remove plywood
RC walls
Outstanding

Clean,chip, level peg staircase RC


14 walls
Staircase Outstanding

Clean, chip, remove plywood, excess


15 concrete at staircase RC walls
Staircase Outstanding

16 Repair honeycomb at staircase Staircase Outstanding

Prepared By: Checked By:

Name: Deng Som Name: Ricardo Diga Jr


Position: Senior QAQC Position: QAQC Manager
Date: 24 Jan 2020 Date: 24 Jan 2020