Professional Documents
Culture Documents
Waha Oil Company: Engineering Specification Air-Cooled Transformer / Rectifier Units For Cathodic Protection Systems
Waha Oil Company: Engineering Specification Air-Cooled Transformer / Rectifier Units For Cathodic Protection Systems
ENGINEERING SPECIFICATION
Rev.
Issued Endorsed Appr’d
No. Date Description
By By By
Signature
Rev.0
Page 1 of 5 ENG-TS-X-SP-0013.doc
TABLE OF CONTENTS
1. GENERAL ................................................................................................................ 3
2. DESIGN PARAMETERS........................................................................................ 3
3. FACTORY TESTS................................................................................................... 4
4. DOCUMENTATION ............................................................................................... 4
5. SPARE PARTS......................................................................................................... 5
Page 2 of 5 ENG-TS-X-SP-0013.doc
1. GENERAL
2. DESIGN PARAMETERS
Page 3 of 5 ENG-TS-X-SP-0013.doc
g) Sunshade : Suitable for site assembly. Shade to extend 400mm
(minimum) beyond the equipment outline and provide a free
air space of 250mm (minimum) above the equipment.
h) Grounding : Enclosure and cover grounding points shall be complete with
lugs suitable for 16mm2 stranded copper cable.
i) Hardware : Handles, locks and hinges shall be of stainless steel.
j) Support : Unit shall be fitted with brackets, which fully supports the
equipment, to enable wall, frame or pole mounting.
k) Standards : Each unit shall comply with the applicable criteria outlined in
BS171, BS7671, BS9720, BS9000 and BS EN 60146-1-1/3
(or other equivalent standards as approved by WAHA) as well
as related standards and codes identified therein.
l) Surface finish : All external surfaces, including sunshade, shall be blast
cleaned to ISO8501, grade Sa2.5, Zinc flame sprayed (100 µm
thickness) and polyester powder coated (80 µm minimum
thickness); finish colour light grey.
m) Fuses : Each unit shall be supplied with one complete, spare set of all
fuses, conveniently mounted within the enclosure.
n) Rating Plate : Stainless steel rating plate is to be fixed to the outside of the
unit, stating manufacturer's name, unit serial number, date of
manufacture, design temperature, ac input and dc output
ratings as a minimum.
3. FACTORY TESTS
Each T/R unit shall be subjected to the manufacturer's standard inspection and tests to verify the
function and operability of the equipment. Tests shall include, but not be limited to, the
following:
• Power frequency voltage tests
• Insulation tests
• Performance and functional tests
• Output polarity tests
• Load and no load tests
Supplier shall provide a detailed listing, including reference standards, of proposed testing in his
quotation.
A certified test report shall be submitted to the Purchaser prior to the date of shipment from the
factory.
4. DOCUMENTATION
Supplier shall be responsible for the submission of 3 (three) sets of each of the following
technical documentation :
• Outline Drawings
• Wiring Diagrams
• Test Reports
• Operations and Maintenance Manual, including fault finding instructions and complete
spare parts’ listing.
Page 4 of 5 ENG-TS-X-SP-0013.doc
5. SPARE PARTS
The spare parts shall be identical to those which are supplied in the original T/R unit. Supplier
shall include within his quotation a complete priced listing of all necessary spare parts. This
listing should include, but not be limited to, the following minimum components:
• DC breakers
• DC ammeters
• DC voltmeters
• Fuses
• Surge protectors
• Touch up paint, suitable for repair of scratches etc.
• Any others as listed by the Supplier
Page 5 of 5 ENG-TS-X-SP-0013.doc