The document is a bill of quantities (BOQ) for the uplift and beautification of the Divisional Headquarters in Khyber Pakhtunkhwa. It includes 27 items related to the rehabilitation and improvement of roads in Abbottabad Bazar, totaling over Rs. 34.69 million. The BOQ provides details of the description, quantity, unit, rate and amount for each item, such as transportation of earth, dismantling of concrete, asphalt works, drainage works, and steel fabrication. The contractor is asked to provide a percentage premium above or below the schedule rates for items as well as the non-schedule rate for one item.
The document is a bill of quantities (BOQ) for the uplift and beautification of the Divisional Headquarters in Khyber Pakhtunkhwa. It includes 27 items related to the rehabilitation and improvement of roads in Abbottabad Bazar, totaling over Rs. 34.69 million. The BOQ provides details of the description, quantity, unit, rate and amount for each item, such as transportation of earth, dismantling of concrete, asphalt works, drainage works, and steel fabrication. The contractor is asked to provide a percentage premium above or below the schedule rates for items as well as the non-schedule rate for one item.
The document is a bill of quantities (BOQ) for the uplift and beautification of the Divisional Headquarters in Khyber Pakhtunkhwa. It includes 27 items related to the rehabilitation and improvement of roads in Abbottabad Bazar, totaling over Rs. 34.69 million. The BOQ provides details of the description, quantity, unit, rate and amount for each item, such as transportation of earth, dismantling of concrete, asphalt works, drainage works, and steel fabrication. The contractor is asked to provide a percentage premium above or below the schedule rates for items as well as the non-schedule rate for one item.
UPLIFT AND BEAUTIFICATION OF DIVISIONAL HEADQUARTERS IN
N.O.W:- KHYBER PAKHTUNKHWA. ADP NO 1456/140796 (2017-18)
S.Head:- DIVISIONAL HEAD QUARTER ABBOTTABAD (ROAD SECTOR)
REHABILITATION/ IMPROVEMENT OF ABBOTTABAD BAZAR ROADS (6.40- S.Head:- KM) SH:- 0-2.5 KM (2.50-KM)
S.No MRS Description of Item Qty Unit Rate Amount
1 03-18-a+b+c Transportation of earth all types upto 4-Km. 1117.00 M3 458.84 512524 2 04-19-c Dismantling : Plain Cement Concrete 1:2:4 117.00 M3 2185.1 255657 3 16-04 -b Water Bound Macadam Base Course 28.00 M3 2,517.88 70501 Plain Cement Concrete Including placing, 4 06-05-i 35.26 M3 5,481.08 193241 compacting, furnishing and curing (Ratio 1:4:8) 5 16-58-c Cold Milling of asphalt concrete 0-30 mm 23332.50 M2 67.17 1567244 6 16-07 Bituminous Tack Coat 23332.50 M2 45.75 1067462 Asphaltic Wearing Course (Asphalt Batch Plant 7 16-12-b 1166.63 M3 18758.33 21884031 Hot Mixed) Cutting of Asphalt edges for PCC shoulders upto 8 N.S.I 5000.00 M 40.00 200000 any depth and disposal. 16-65-a Pavement marking in reflective thermoplast paint 9 6250.00 m 150.24 939000 with glass beads for line 15cm width 10 16-19-c-03 Supply & Fixing of Cat Eyes 1170.00 Each 331.23 387539 16-19-a-02 Supply and Fixing aluminium alloy road studs as 11 per specs 117.00 Each 843.63 98705 Large, strip 146x30mm, 171 beads: Bi-direction 12 03-60-a Structural excavation in common material 686.73 M3 315.25 216493 Cement Concrete (brick/stone ballast, 1.5" to 13 (06-03-b) 2"/nullah shingle well graded and cleaned) in 26.23 M3 4,153.70 108960 foundation & plinth(Ratio 1:4:8) P.C.C (1:2:4) i/c placing compacting curing 14 06-05-f 600.21 M3 7,257.86 4356240 complete 15 06-06-a-03 RCC Concrete (1:2:4) 8.49 M3 9,538.28 80942 16 08-01-d-03 RRM Masonry C:S Ratio 1:6 141.43 M3 5,384.76 761567 Reinforced Concrete pipe culvert (AASHTO M- 17 16-23-b 14.62 M 3,901.69 57043 170)Dia 610 mm. Structural back fill using common material 18 03-60-c 33.70 M3 442.27 14903 available at site Cement Concrete (brick/stone ballast, 1.5" to 19 06-03-a 2"/nullah shingle well graded and cleaned) in 10.48 M3 5,219.71 54703 foundation & plinth (Ratio 1:3:6) Pointing flush on stone work, upto 20' height On 20 11-19-c-02 39.00 M2 336.60 13127 stone work raised : in c/s mortar 1:3 Providing and Laying RCC pipe sewers complete 21 23-03-a-01 As per 20.00 M 2,179.05 43581 ASTM C-76-79, Class II : 12" i/d, Wall B Providing and Laying non-reinforced concrete 22 23-02-c pipe, moulded with cement concrete : 9" i/d wall 20.00 M 1,328.20 26564 thickness 1". Providing and fixing kerb stone (12"x14"x6") in 23 16-63-b cement sand mortar 1:3 in center media or round 298.00 Each 571.82 170402 about as specified. Provide, lay, water & ram clean coarse sand 24 10-03-a 27.17 M3 1,475.43 40087 under floor / brick paving, complete P/F Precast Concrete 7000 psi TUFF Tiles over 25 10-.45 bed of 2" thick sand or as Directed by Engineer 357.60 M2 1,089.11 389466 Incharge Preparing surface and painting with emulsion 26 10-30-a+b+b 74.50 M2 323.25 24082 paint. Fabrication of heavy steel work with angle, tees, 27 25-10 0.322 Tonne 139,213.30 44827 sheet iron etc for making trusses, girders etc