BOQ'S

34.691 (M)

UPLIFT AND BEAUTIFICATION OF DIVISIONAL HEADQUARTERS IN


N.O.W:-
KHYBER PAKHTUNKHWA. ADP NO 1456/140796 (2017-18)

S.Head:- DIVISIONAL HEAD QUARTER ABBOTTABAD (ROAD SECTOR)


REHABILITATION/ IMPROVEMENT OF ABBOTTABAD BAZAR ROADS (6.40-
S.Head:-
KM) SH:- 0-2.5 KM (2.50-KM)

S.No MRS Description of Item Qty Unit Rate Amount


1 03-18-a+b+c Transportation of earth all types upto 4-Km. 1117.00 M3 458.84 512524
2 04-19-c Dismantling : Plain Cement Concrete 1:2:4 117.00 M3 2185.1 255657
3 16-04 -b Water Bound Macadam Base Course 28.00 M3 2,517.88 70501
Plain Cement Concrete Including placing,
4 06-05-i 35.26 M3 5,481.08 193241
compacting, furnishing and curing (Ratio 1:4:8)
5 16-58-c Cold Milling of asphalt concrete 0-30 mm 23332.50 M2 67.17 1567244
6 16-07 Bituminous Tack Coat 23332.50 M2 45.75 1067462
Asphaltic Wearing Course (Asphalt Batch Plant
7 16-12-b 1166.63 M3 18758.33 21884031
Hot Mixed)
Cutting of Asphalt edges for PCC shoulders upto
8 N.S.I 5000.00 M 40.00 200000
any depth and disposal.
16-65-a Pavement marking in reflective thermoplast paint
9 6250.00 m 150.24 939000
with glass beads for line 15cm width
10 16-19-c-03 Supply & Fixing of Cat Eyes 1170.00 Each 331.23 387539
16-19-a-02 Supply and Fixing aluminium alloy road studs as
11 per specs 117.00 Each 843.63 98705
Large, strip 146x30mm, 171 beads: Bi-direction
12 03-60-a Structural excavation in common material 686.73 M3 315.25 216493
Cement Concrete (brick/stone ballast, 1.5" to
13 (06-03-b) 2"/nullah shingle well graded and cleaned) in 26.23 M3 4,153.70 108960
foundation & plinth(Ratio 1:4:8)
P.C.C (1:2:4) i/c placing compacting curing
14 06-05-f 600.21 M3 7,257.86 4356240
complete
15 06-06-a-03 RCC Concrete (1:2:4) 8.49 M3 9,538.28 80942
16 08-01-d-03 RRM Masonry C:S Ratio 1:6 141.43 M3 5,384.76 761567
Reinforced Concrete pipe culvert (AASHTO M-
17 16-23-b 14.62 M 3,901.69 57043
170)Dia 610 mm.
Structural back fill using common material
18 03-60-c 33.70 M3 442.27 14903
available at site
Cement Concrete (brick/stone ballast, 1.5" to
19 06-03-a 2"/nullah shingle well graded and cleaned) in 10.48 M3 5,219.71 54703
foundation & plinth (Ratio 1:3:6)
Pointing flush on stone work, upto 20' height On
20 11-19-c-02 39.00 M2 336.60 13127
stone work raised : in c/s mortar 1:3
Providing and Laying RCC pipe sewers complete
21 23-03-a-01 As per 20.00 M 2,179.05 43581
ASTM C-76-79, Class II : 12" i/d, Wall B
Providing and Laying non-reinforced concrete
22 23-02-c pipe, moulded with cement concrete : 9" i/d wall 20.00 M 1,328.20 26564
thickness 1".
Providing and fixing kerb stone (12"x14"x6") in
23 16-63-b cement sand mortar 1:3 in center media or round 298.00 Each 571.82 170402
about as specified.
Provide, lay, water & ram clean coarse sand
24 10-03-a 27.17 M3 1,475.43 40087
under floor / brick paving, complete
P/F Precast Concrete 7000 psi TUFF Tiles over
25 10-.45 bed of 2" thick sand or as Directed by Engineer 357.60 M2 1,089.11 389466
Incharge
Preparing surface and painting with emulsion
26 10-30-a+b+b 74.50 M2 323.25 24082
paint.
Fabrication of heavy steel work with angle, tees,
27 25-10 0.322 Tonne 139,213.30 44827
sheet iron etc for making trusses, girders etc

Supply & fabricate MS reinforcement for cement


28 06-07-c 1.00 Tonne 107,564.41 107564
concrete (hot rolled deformed bars Grade 60)
Total 33686453
Add 3% cost factor except N.S.I 1004594
G.Total 34691047

1- Contractor Premium____________%above/below on all schedule (MRS 2017) items Rs

2- Contractor Premium____________%above/below on Non schedule items Rs: 200000