Tamilnadu Transmission Corporation Limited Cost Data For 400 KV DC Line On DC Towers (Wind Zone-4, Tc-2) With Twin Moose Conductor
Tamilnadu Transmission Corporation Limited Cost Data For 400 KV DC Line On DC Towers (Wind Zone-4, Tc-2) With Twin Moose Conductor
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-4, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc.,
58
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-4, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
32 Tower protection works 15% on Foundation 5820266.40
33 TOTAL COST OF FOUNDATION 44622042.40
34 Total Cost of materials & Foundation 148200749.41
35 Erection charges(10% on item 27) 10357870.70
36 10 KM Tree/Crop compensation 2000000 KM 20000000.00
Total amount (Item 34+35+36) 178558620.11
35 GST @ 18% on total amount 32140551.62
59
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-2, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc.,
60
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-2, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
30° to 60° High angle & Dead end tower
32 Tower protection works 15% on Foundation 3406306.80
33 TOTAL COST OF FOUNDATION 26115018.80
34 Total Cost of materials & Foundation 121613845.81
33 Erection charges(10% on item 27) 9549882.70
10 KM Tree/Crop compensation 2000000 KM 20000000.00
Total amount 151163728.51
35 GST @ 18% on total amount 27209471.13
61
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc.,
62
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
32 Tower protection works 15% on Foundation 5555140.65
33 TOTAL COST OF FOUNDATION 42589411.65
34 Total Cost of materials & Foundation 149944658.66
33 Erection charges(10% on item 27) 10735524.70
10 KM Tree/Crop compensation 2000000 KM 20000000.00
Total amount 180680183.36
35 GST @ 18% on total amount 32522433.00
63
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE 2, TC 2) WITH QUAD MOOSE
CONDUCTOR
Sl. Amount in Rs.
No Quantity Unit Description Rate in Rs. Per
.
1 Galvanised steel tower materials with
extension part wherever necessary,
and bolts and nutsetc.,
12945 MT
457.78 MT a) HT Steel 69000 MT 31586820.00
380.25 MT b) MS 65000 MT 24716250.00
37.04 MT c) Ordinary Bolts & nuts 90000 MT 3333600.00
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 4927 No. 120 KN Disc Insulators 491.3 No. 2420635.10
3 19976 No. 160 KN Disc Insulators 867 No. 17319192.00
Conductor & Earth wire accessories
4 78 Set Twin I suspension string for QUARD
ACSR Moose 20100 Set 1567800.00
5 54 Set Single I suspension pilot string with
counter weight 36493 Set 1970622.00
6 204 Set QUAD Tension string 56358 Set 11497032.00
7 1091 Set Spacer Damper for Quard ACSR
Moose 6 Nos. for 330m 2019 Set 2202729.00
8 306 Set Rigid Spacer for conductor ACSR
Moose 3 Nos. per jumper 2218.5 Set 678861.00
9 120 Set
Midspan compression joint for Moose 1268.2 Set 152184.00
10 60 No. Repair sleeve for Moose 403 No. 24180.00
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00
12 34 Set Tension Clamp for Earth wire
7/3.66mm 845.0649 Set 28732.21
13 5 Set Midspan compression joint for GS
Earth wire 7/3.66mm 352.75 Set 1763.75
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40
15 47 No. Flexible copper bond for earthing 935 No. 43945.00
16 243.6 KM ACSR Moose conductors 1.0% sag 309470 KM 75386892.00
17 10.1 KM GI EARTH WIRE 7/3.66mm 1.5% sag
52331 KM 528543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 No. 51405.00
20 7 No. Counter poise earthing (120m length) 9484 No. 66388.00
Tower Accessories
21 30 No. Number plate 299 No. 8970.00
22 30 No. Danger Board 362 No. 10860.00
23 60 No. Phase plate( Set of three) 319 No. 19140.00
24 120 No. Circuit plate 306 No. 36720.00
25 30 No. Anti-climbing devices 14292 No. 428760.00
64
26 TOTAL COST OF MATERIALS 176548435.06
TOWER FOUNDATIONS
27 13 No. A type tower 532435 No. 6921655.00
0° to 2° Suspension tower
28 4 No. B type tower 1651651 No. 6606604.00
2° to 15° Light angle tower
29 4 No. C type tower 2066562 No. 8266248.00
15° to 30° Medium angle tower
30 9 No. D type tower 2424891 No. 21824019.00
30° to 60° High angle & Dead end
tower
31 Tower protection works 15% on foundation 3269176.05
32 TOTAL FOUNDATION COST 46887702.05
65
Route lenth taken
DA DB DC DD
13 4 4 9
5.479 17.9759 19.592 21.629
11.306 8.32268 10.75328 13.6
0.702002 1.441715 1.47252 1.72588
276 138
1152 1152 1152
78
54
48 48 108
72 72 162
13
8 8 18
16 16 36
13 8 8 18
10 3 3 7
3 1 1 2
13 4 4 9
13 4 4 9
26 8 8 18
26 8 8 18
13 4 4 9
66
13
67
10 KM
416.1596 457.78
345.6818 380.25
36.31589 37.04
4830 4927
19584 19976
78 78
54 54
204 204
1090.909 1091
306 306
120 120
60 60
13 13
34 34
5 5
68 68
47 47
240 243.6
10 10.1
10 10.5
23 23
7 7
30 30
30 30
60 60
120 120
30 30
68
13 13
4 4
4 4
9 9
69
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE 4 TC 2) WITH QUAD MOOSE
CONDUCTOR
66
26 TOTAL COST OF MATERIALS 186088155.06
67
TOWER FOUNDATIONS
27 13 No. A type tower 946538 No. 12304994.00
0° to 2° Suspension tower
28 4 No. B type tower 2229207.00 No. 8916828.00
2° to 15° Light angle tower
29 4 No. C type tower 2698242.00 No. 10792968.00
15° to 30° Medium angle tower
30 9 No. D type tower 3287720.00 No. 29589480.00
30° to 60° High angle & Dead end
tower
31 Tower protection works 15% on foundation 9240640.50
32 TOTAL COST ON FOUNDATION 70844910.50
Total Cost of materials &
33 FOUNDATION 256933065.56
68
DA DB DC DD
13 4 4 9
8.34 20.207 24.034 26.468
10.302 10.411 10.942 15.703
0.791 1.279 1.648 1.972
276 138
1152 1152 1152
78
54
48 48 108
72 72 162
13
8 8 18
16 16 36
13 8 8 18
10 3 3 7
3 1 1 2
13 4 4 9
13 4 4 9
26 8 8 18
26 8 8 18
13 4 4 9
69
70
13
71
10 KM
523.596 575.96
360.665 396.73
39.739 40.53
4830 4927
19584 19976
78 78
54 54
204 204
1090.909 1091
306 306
120 120
60 60
13 13
34 34
5 5
68 68
47 47
240 243.6
10 10.1
10 10.5
23 23
7 7
30 30
30 30
60 60
120 120
30 30
72
73
13 13
4 4
4 4
9 9
74
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE 5, TC 1) WITH QUAD MOOSE
CONDUCTOR
Sl. Amount in Rs.
No Quantity Unit Description Rate in Rs. Per
. 10 KM
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc., DA DB DC DD Total Adding 10%
12945 MT 13 4 4 9
718.49 MT a) HT Steel 69000 MT 49575810.00 11.422 23.652 29.562 32.426 653.176 718.49
368.8 MT b) MS 65000 MT 23972000.00 8.399 11.068 10.398 15.58 335.271 368.8
40.5 MT c) Ordinary Bolts & nuts 90000 MT 3645000.00 0.687 1.468 1.738 1.995 39.71 40.5
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 4927 No. 120 KN Disc Insulators 491.3 No. 2420635.10 276 138 4830 4927
3 19976 No. 160 KN Disc Insulators 867 No. 17319192.00 1152 1152 1152 19584 19976
Conductor & Earth wire accessories
4 78 Set Twin I suspension string for QUARD
ACSR Moose 20100 Set 1567800.00 78 78 78
5 54 Set Single I suspension pilot string with
counter weight 36493 Set 1970622.00 54 54 54
6 204 Set QUAD Tension string 56358 Set 11497032.00 48 48 108 204 204
7 1091 Set Spacer Damper for Quad ACSR Moose 7
Nos. for 400m 2019 Set 2202729.00 1090.909 1091
8 306 Set Rigid Spacer for conductor ACSR Moose
3 Nos. per jumper 2218.5 Set 678861.00 72 72 162 306 306
9 120 Set Midspan compression joint for Moose 1268.2 Set 152184.00 120 120
10 60 No. Repair sleeve for Moose 403 No. 24180.00 60 60
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00 13 13 13
12 34 Set Tension Clamp for Earth wire 7/3.66mm
845.0649 Set 28732.21 8 8 18 34 34
13 5 Set Midspan compression joint for GS Earth
wire 7/3.66mm 352.75 Set 1763.75 5 5
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40 16 16 36 68 68
15 47 No. Flexible copper bond for earthing 935 No. 43945.00 13 8 8 18 47 47
16 243.6 KM ACSR Moose conductors 1.5% sag 309470 KM 75386892.00 240 243.6
17 10.1 KM GI EARTH WIRE 7/3.66mm 1.0% sag
52331 KM 528543.10 10 10.1
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50 10 10.5
Earthing Materials
19 23 No. Pipe type earthing 2235 No. 51405.00 10 3 3 7 23 23
20 7 No. Counter poise earthing (120m length) 9484 No. 66388.00 3 1 1 2 7 7
Tower Accessories
21 30 No. Number plate 299 No. 8970.00 13 4 4 9 30 30
22 30 No. Danger Board 362 No. 10860.00 13 4 4 9 30 30
23 60 No. Phase plate( Set of three) 319 No. 19140.00 26 8 8 18 60 60
24 120 No. Circuit plate 306 No. 36720.00 26 8 8 18 120 120
25 30 No. Anti-climbing devices 14292 No. 428760.00 13 4 4 9 30 30
26 TOTAL COST OF MATERIALS 194104575.06
TOWER FOUNDATIONS
27 13 No. A type tower 996637 No. 12956281.00 13 13 13
0° to 2° Suspension tower
28 4 No. B type tower 2211665 No. 8846660.00 4 4 4
2° to 15° Light angle tower
29 4 No. C type tower 2814836 No. 11259344.00 4 4 4
15° to 30° Medium angle tower
30 9 No. D type tower 4209477 No. 37885293.00 9 9 9
68
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DOUBLE CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
1 Galvanised steel tower materials with extension part
wherever necessary, and bolts and nutsetc.,
70
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DOUBLE CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
36 Labour Welfare Fund 1.0% on Foundation &
Erection Charges 1,574,006.09
71
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV 4 CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
1 Galvanised steel tower materials with extension part
wherever necessary, and bolts and nutsetc.,
72
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV 4 CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
35
GST @ 18% on total amount 80566021.40
36 Labour Welfare Fund 1.0% on Foundation &
Erection Charges 1,629,751.22
Transportation & Insurance charges (5% on Item
37 27) 13,230,694.30
38 Contingencies (1% on Material, Erection &
Foundation charges 4,608,197.02
39
Total Cost of Materials, Foundation and Erection
charges but excluding GST 465,427,899.09
40 Establishment & Supervision Charges at 15.0% on
item 40 69,814,184.86
41 Total Cost of Materials, Foundation and Erection
charges including GST & LWF 547,623,671.70
42
TOTAL COST FOR 10 KM 617437856.56
43 EPF at 13.36 % on labour portion
11154802.94
44 ESI at 4.75 % on labour portion
3850676.89
45 Land compensation
2038660.00
46 TOTAL COST PER 10 KM 634481996.39
47 TOTAL COST PER 1 KM 63448199.64
(Rounding to nearest 1000) SAY 63,449,000.00
COST PER KM IN LAKHS 634.49
73
110 KV Lines
Sl. No Name of line A B C D
1 Villupuram-Deviakurichi @alagapuram 5 8
2 Vengaimadalam -Musiri @ Jambunathapuram 5
3 Vaitheeswarankoil-Thiruvengadu@Poraiiyar 54 11 31
4 Nemilithippikadu-Pattukottai@Karambayam 5 1 3
5 Kadalangudi-Vaitheeswarankoil@nidur 3
6 Villupuram-Deviakurichi @manalurpet 56 26
7 Kopoovanur-Periyavadivadi 27 6 4
8 Kadalangudi-Aduthura@Jayakondam 24 19 14
9 Perambalur-Krishnapuram@alambadi 3
10 Perambalur-Ariyalur@Perali 4
12 Mayiladuthurai-Thiryuvarur@Perambur 8 3 5
13 Thirumakottai-Voimedu 88 25 27
14 Neyveli-Deviyakurichy@Adari 3
15 KGTPS-Koothakudi 28 18 4
16 Trichy-Samayapuram 1 4
17 Trichy-Samayapuram 70 13 44
18 Trichy-Samayapuram@Kambarasampettai 5 7
19 Kdalankudi-Neyveli line 96 27 13
20 KGTPS-Paliyur@Kumbakonam 76 28 61
21 Kumbakonam-Koilvenni 54 15 10
22 Kumbakonam-Koilvenni@Kumbakonam230KV SS 12 3 17
23 Neyveli-Villupuran@Thurunavalur 23 6 10
24 Pudukottai230-Sipcot SS 12
25 Pudukottai-Thirumayam@Pudukottai urban SS 7 19
26 Thanjavur Thuruvarur line 134 29 72
27 Alundur-Trichy@Manikandam 1 1 6
28 Rajathivalasi@olapalayam 6
29 Arasur-Annur@Pasur 6 7
30 KG Denim @ Thenthirumalai 6 13
31 Udumalpet-Ponnapuram@Kottamangalam 11
32 Ingur-Thingalur@Pallukondapalayam 4 9
33 Thudiyalur-Sandinallah Feeder 2 18
34 Ingur-Ponnapuram@kurukathhi 23 17 28
35 Erode-Pugalur@Kurukathi 42 34 24
36 Arasur-Ingur@Vengipalayam 6 5 6
37 Thudiyalur-Sandinallah Feeder 4 3 2
38 Aliyar-Negamam@Thalakarai 29 58
39 SRPudur-Arumuganeri@Sanganankulam 1 2 3
40 Koilpatty Traction ss 23 6 10
41 Madurai-Anuppankulam 88 19 25
42 Madurai-Anuppankulam & Virudunagar Spurline 84 24 20
43 Kappalur-Pasumalai 35 20 12
44 Kayathar-Arumuganeri@srimoolakarai 13 4 6
45 Theni-Pasumalai@Valuthur 2 2 9
47 THeni-Pasumalai@Kandamanur Villakku 3 7 7
48 Tuticorin-Arumuganeri 71 4 17
49 Pasumalai-Alagarkoil@Ilanthaikulam 1 2
50 Kavanur-Ilayankudi@Maravamangalam 50 6 19
51 Muthiyapuram-Tuticorin Coal Yard 11 5 24
52 Pasumalai-Sempatty Feeder I 150 20 37
53 Pasumalai-Alagarkoil@Otthakadai 4
54 Sempatty-Thei Feeder II @ Nilakottai 9 13
55 Pallakkapalyam-Thevur 15 18 10
56 Zuzuvadi-Bagalur 20 14 21
57 Hosur-Pagalur@Narignanapuram 12 30 5
58 Hosur-Kempatty 15 12 14
59 Sholingur-Brakes India 6
60 Mettur-Singarpet 166 45 14
61 Karimangalam-Vellichandai 33 18 15
62 Mosur-Pallur@Punnai 22 10 12
63 Deviyakurichy-Thammampatty@Gudamalai 2
64 Karimangalam-Hosur@Guruparapalli 1 4
65 Deviyakurichy-Krishnapuram@Thedavur 2 5 4
66 DharmapuriDharmapuri 110 KV SS 21 23 21
67 Dharmapuri-Vellichandai 34 40 34
68 Mettur-Singarapet@Thoppur 3
69 Salem-Sankari@Veerapandi 1 6
70 Salem-Theviyakurichy@Belur 10 22 31
71 Alandur-Paramathy@Valayapatty 63 31 19
72 T-Off to Vaduventhangal SS 9 9 8
73 Vaniyambadi-Alangayam 38 17 9
74 Vinnamagalam-Vadakathipatty 3 3 2
1853 729 1045
AVERAGE for 10 KM 20.33667 8.000773 11.46887
Say 20 8 12
ANNEXURE-6
230 KV Lines
Length Sl. No Name of line A B C
2.91 1 Palladam-Ingur 6
1.014 2 Myvadi-Pugalur@Kurakathi 45 41
23.414 3 Palladam-Ingur@Kurakathi 45 46
2.674 4 Karaikudi-Kavanur 209 49
0.45 5 Vellappaneri-Kayathar 11 10
21.605 6 Soolagiri-Singarapet @Guruparapalli
11.41 7 Deviakurichy-Pudanchandai@Valyapatty 21 49
12.944 8 Mettur-Karimangalam@Dharmapuri 2 7
0.57 9 Dharmapuri-Gurparapalli 79 93
0.84 412 301
3.91 AVERAGE FOR 10KM LINE 16.38171 11.96819
36.5 Say 16 12
0.34
12.6
1.056 ANNEXURE-3
32.685 400KV Lines
2.745 1 MTPS-Thiruvalam 323 132 110
37.94 2 Thiruvalam-Kanagammachatram 123 19 24
40.693 3 Abishekapatty-Kanarpatty 23 5 3
19.9 4 Kayathar-Kanarpatty 20 3 2
7.912 5 LI-LO Alamathy-SVCM @Guindy 19 7 5
9.805 6 Ottiambakkam-Guindy 11 4 4
3.037 7 Manali-Korattur 39 14 17
5.754 8 Thervoi-alamathy-NCTPS-Korattur 64 8 19
61.677 235 9 LI-LO MTPS-Arasur@Karamadai 400 KV 44 11 14
1.159 666 203 198
1.195 AVERAGE FOR 10KM LINE 12.95528 3.948832 3.851571
2.635 Say 13 4 4
3.3
3.3
2.6
5.625
17.14
26.45
3.52
2.563
16.665
0.79
10.3
35.376
32.264
15.395
5.92
3.1
3.5
22.655
0.445
18.453
8.595
57.95
0.316
4.62
10.325
13.52
11.845
9.205
0.945
63.75
16.22
10.885
0.14
0.76
2.2
15.585
26.24
0.31
1.02
14.443
29.84
6.344
15.314
2.055
911.162
D Length
10 3.6
39 30.865
51 32.215
68 88.173
27 11.047
3 0.77
26 24.055
9 3.2
60 57.575
293 251.5
11.6501
12
226 270.141
42 70.698
18 14.9
14 12.675
14 13.3
26 14.8
84 48.9
26 39.5
15 29.162
465 514.076
9.045355