TAMILNADU TRANSMISSION CORPORATION LIMITED

COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-4, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc.,

339.47 MT a) HT Steel 69000 MT 23423430.00


246.86 MT b) MS 65000 MT 16045900.00
22.2 MT c) Ordinary Bolts & nuts 90000 MT 1998000.00
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 3097 No. 120 KN Disc Insulators 491.3 No. 1521556.10
3 9988 No. 160 KN Disc Insulators 867 No. 8659596.00
Conductor & Earth wire accessories
4 78 Set Single I suspension string for Twin ACSR
Moose 18354.05 Set 1431615.90
5 54 Set Single I suspension pilot string with counte 39037 Set 2107998.00
6 204 Set Double Tension string 21269 Set 4338876.00
7 408 Set Vibration Damper for Twin ACSR Moose 1317.5 Set 537540.00
8 1273 Set Bundle spacer for Twin Moose 1413.55 Set 1799449.15
8 306 Set Rigid Spacer for conductor ACSR Moose 3 849.15 Set 259839.90
9 60 Set Midspan compression joint for Moose 1268.2 Set 76092.00
10 30 No. Repair sleeve for Moose 403 No. 12090.00
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00
12 34 Set Tension Clamp for Earth wire 7/3.66mm
845.0649 Set 28732.21
13 5 Set Midspan compression joint for GS Earth
wire 7/3.66mm 352.75 Set 1763.75
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40
15 47 No. Flexible copper bond for earthing 935 No. 43945.00
16 121.8 KM ACSR Moose conductors 1.0% sag 309470 KM 37693446.00
17 10.1 KM GS EARTH WIRE 7/3.66mm 1.50% sag
52331 KM 528543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 Each 51405.00
20 7 No. Counter poise earthing (120m length) 9484 Each 66388.00
21 Tower Accessories
22 30 No. Number plate 299 Each 8970.00
23 30 No. Danger Board 362 Each 10860.00
24 60 No. Phase plate( Set of three) 319 Each 19140.00
25 60 No. Circuit plate 306 Each 18360.00
26 30 No. Anti-climbing devices 14292 Each 428760.00
27 TOTAL COST OF MATERIALS 103578707.01
TOWER FOUNDATIONS
28 13 No. DA type tower 504989 Each 6564857.00
0° to 2° Suspension tower
29 4 No. DB type tower 1175718 Each 4702872.00
2° to 15° Light angle tower
30 4 No. DC type tower 1575728 Each 6302912.00
15° to 30° Medium angle tower
31 9 No. DD type tower 2359015 Each 21231135.00
30° to 60° High angle & Dead end tower

58
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-4, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
32 Tower protection works 15% on Foundation 5820266.40
33 TOTAL COST OF FOUNDATION 44622042.40
34 Total Cost of materials & Foundation 148200749.41
35 Erection charges(10% on item 27) 10357870.70
36 10 KM Tree/Crop compensation 2000000 KM 20000000.00
Total amount (Item 34+35+36) 178558620.11
35 GST @ 18% on total amount 32140551.62

36 Labour Welfare Fund 1.0% on Foundation


& Erection Charges 549799.13

Transportation & Insurance charges (5%


37 on Item 27) 5178935.35
38 Contingencies (1% on Material,
Foundation & Erection) 1837375.55
39 Total Cost of Materials, Foundation and
Erection charges but excluding GST
185574931.01
40 Establishment & Supervision Charges at
15.0% on item 40 27836240.00
41 Total Cost of Materials, Foundation and
Erection charges including GST & LWF
218265281.76
42 TOTAL COST PER 10 KM 246101521.76
43 EPF at 13.36 % on labour portion 3881240.22
44 ESI at 4.75 % on labour portion 1339817.66
45 Land compensation 2038660.00
46 TOTAL COST PER 10 KM 253361239.65
47 TOTAL COST PER 1 KM 25336123.96
(Rounding to nearest 1000) SAY 25337000.00
COST PER KM IN LAKHS 253.37

59
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-2, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc.,

171.55 MT a) HT Steel 69000 MT 11836950.00


306.90 MT b) MS 65000 MT 19948500.00
17.8 MT c) Ordinary Bolts & nuts 90000 MT 1602000.00
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 3097 No. 120 KN Disc Insulators 491.3 No. 1521556.10
3 9988 No. 160 KN Disc Insulators 867 No. 8659596.00
Conductor & Earth wire accessories
4 78 Set Single I suspension string for Twin ACSR
Moose 18354.05 Set 1431615.90
5 54 Set Single I suspension pilot string with
counter weight 39037 Set 2107998.00
6 204 Set Double Tension string 21269 Set 4338876.00
7 408 Set Vibration Damper for Twin ACSR Moose 1317.5 Set 537540.00
8 1273 Set Bundle spacer for Twin Moose 1413.55 Set 1799449.15
8 306 Set Rigid Spacer for conductor ACSR Moose 3 849.15 Set 259839.90
9 60 Set Midspan compression joint for Moose 1268.2 Set 76092.00
10 30 No. Repair sleeve for Moose 403 No. 12090.00
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00
12 34 Set Tension Clamp for Earth wire 7/3.66mm
845.0649 Set 28732.21
13 5 Set Midspan compression joint for GS Earth
wire 7/3.66mm 352.75 Set 1763.75
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40
15 47 No. Flexible copper bond for earthing 935 No. 43945.00
16 121.8 KM ACSR Moose conductors 1.0% sag 309470 KM 37693446.00
17 10.1 KM GS EARTH WIRE 7/3.66mm 1.50% sag
52331 KM 528543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 Each 51405.00
20 7 No. Counter poise earthing (120m length) 9484 Each 66388.00
21 Tower Accessories
22 30 No. Number plate 299 Each 8970.00
23 30 No. Danger Board 362 Each 10860.00
24 60 No. Phase plate( Set of three) 319 Each 19140.00
25 60 No. Circuit plate 306 Each 18360.00
26 30 No. Anti-climbing devices 14292 Each 428760.00
27 TOTAL COST OF MATERIALS 95498827.01
TOWER FOUNDATIONS
28 13 No. DA type tower 346813 Each 4508569.00
0° to 2° Suspension tower
29 4 No. DB type tower 634261 Each 2537044.00
2° to 15° Light angle tower
30 4 No. DC type tower 810426 Each 3241704.00
15° to 30° Medium angle tower
31 9 No. DD type tower 1380155 Each 12421395.00

60
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-2, TC-2) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
30° to 60° High angle & Dead end tower
32 Tower protection works 15% on Foundation 3406306.80
33 TOTAL COST OF FOUNDATION 26115018.80
34 Total Cost of materials & Foundation 121613845.81
33 Erection charges(10% on item 27) 9549882.70
10 KM Tree/Crop compensation 2000000 KM 20000000.00
Total amount 151163728.51
35 GST @ 18% on total amount 27209471.13

36 Labour Welfare Fund 1.0% on Foundation


& Erection Charges 356649.02

Transportation & Insurance charges (5%


37 on Item 27) 4774941.35
38 Contingencies (1% on Material,
Foundation & erection) 1559386.70
39
Total Cost of Materials, Foundation and
Erection charges but excluding GST 157498056.56
40 Establishment & Supervision Charges at
15.0% on item 40 23624708.00
41 Total Cost of Materials, Foundation and
Erection charges including GST & LWF
185064176.70
42 TOTAL COST PER 10 KM 208688884.70
43 EPF at 13.36 % on labour portion 2751434.49
44 ESI at 4.75 % on labour portion 949804.79
45 Land compensation 2038660.00
46 TOTAL COST PER 10 KM 214428783.98
47 TOTAL COST PER 1 KM 21442878.40
(Rounding to nearest 1000) SAY 21443000.00
COST PER KM IN LAKHS 214.43

61
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc.,

456.03 MT a) HT Steel 69000 MT 31466070.00


181.92 MT b) MS 65000 MT 11824800.00
21.7 MT c) Ordinary Bolts & nuts 90000 MT 1953000.00
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 3097 No. 120 KN Disc Insulators 491.3 No. 1521556.10
3 9988 No. 160 KN Disc Insulators 867 No. 8659596.00
Conductor & Earth wire accessories
4 78 Set Single I suspension string for Twin ACSR
Moose 18354.05 Set 1431615.90
5 54 Set Single I suspension pilot string with counte 39037 Set 2107998.00
6 204 Set Double Tension string 21269 Set 4338876.00
7 408 Set Vibration Damper for Twin ACSR Moose 1317.5 Set 537540.00
8 1273 Set Bundle spacer for Twin Moose 1413.55 Set 1799449.15
8 306 Set Rigid Spacer for conductor ACSR Moose 3 849.15 Set 259839.90
9 60 Set Midspan compression joint for Moose 1268.2 Set 76092.00
10 30 No. Repair sleeve for Moose 403 No. 12090.00
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00
12 34 Set Tension Clamp for Earth wire 7/3.66mm
845.0649 Set 28732.21
13 5 Set Midspan compression joint for GS Earth
wire 7/3.66mm 352.75 Set 1763.75
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40
15 47 No. Flexible copper bond for earthing 935 No. 43945.00
16 121.8 KM ACSR Moose conductors 1.0% sag 309470 KM 37693446.00
17 10.1 KM GS EARTH WIRE 7/3.66mm 1.50% sag
52331 KM 528543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 Each 51405.00
20 7 No. Counter poise earthing (120m length) 9484 Each 66388.00
21 Tower Accessories
22 30 No. Number plate 299 Each 8970.00
23 30 No. Danger Board 362 Each 10860.00
24 60 No. Phase plate( Set of three) 319 Each 19140.00
25 60 No. Circuit plate 306 Each 18360.00
26 30 No. Anti-climbing devices 14292 Each 428760.00
27 TOTAL COST OF MATERIALS 107355247.01
TOWER FOUNDATIONS
28 13 No. DA type tower 511917 Each 6654921.00
0° to 2° Suspension tower
29 4 No. DB type tower 1174767 Each 4699068.00
2° to 15° Light angle tower
30 4 No. DC type tower 1482792 Each 5931168.00
15° to 30° Medium angle tower
31 9 No. DD type tower 2194346 Each 19749114.00
30° to 60° High angle & Dead end tower

62
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. No. Quantity DESCRIPTION Rate in Rs. Per Amount in Rs.
32 Tower protection works 15% on Foundation 5555140.65
33 TOTAL COST OF FOUNDATION 42589411.65
34 Total Cost of materials & Foundation 149944658.66
33 Erection charges(10% on item 27) 10735524.70
10 KM Tree/Crop compensation 2000000 KM 20000000.00
Total amount 180680183.36
35 GST @ 18% on total amount 32522433.00

36 Labour Welfare Fund 1.0% on Foundation


& Erection Charges 533249.36

Transportation & Insurance charges (5%


37 on Item 27) 5367762.35
38 Contingencies (1% on Material,
Foundation & erection) 1860479.46
39 Total Cost of Materials, Foundation and
Erection charges but excluding GST
187908425.16
40 Establishment & Supervision Charges at
15.0% on item 40 28186264.00
41 Total Cost of Materials, Foundation and
Erection charges including GST & LWF 220964107.53
42 TOTAL COST PER 10 KM 249150371.53
43 EPF at 13.36 % on labour portion 3821329.42
44 ESI at 4.75 % on labour portion 1319136.24
45 Land compensation 2038660.00
46 TOTAL COST PER 10 KM 256329497.19
47 TOTAL COST PER 1 KM 25632949.72
(Rounding to nearest 1000) SAY 25633000.00
COST PER KM IN LAKHS 256.33

63
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE 2, TC 2) WITH QUAD MOOSE
CONDUCTOR
Sl. Amount in Rs.
No Quantity Unit Description Rate in Rs. Per
.
1 Galvanised steel tower materials with
extension part wherever necessary,
and bolts and nutsetc.,
12945 MT
457.78 MT a) HT Steel 69000 MT 31586820.00
380.25 MT b) MS 65000 MT 24716250.00
37.04 MT c) Ordinary Bolts & nuts 90000 MT 3333600.00
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 4927 No. 120 KN Disc Insulators 491.3 No. 2420635.10
3 19976 No. 160 KN Disc Insulators 867 No. 17319192.00
Conductor & Earth wire accessories
4 78 Set Twin I suspension string for QUARD
ACSR Moose 20100 Set 1567800.00
5 54 Set Single I suspension pilot string with
counter weight 36493 Set 1970622.00
6 204 Set QUAD Tension string 56358 Set 11497032.00
7 1091 Set Spacer Damper for Quard ACSR
Moose 6 Nos. for 330m 2019 Set 2202729.00
8 306 Set Rigid Spacer for conductor ACSR
Moose 3 Nos. per jumper 2218.5 Set 678861.00
9 120 Set
Midspan compression joint for Moose 1268.2 Set 152184.00
10 60 No. Repair sleeve for Moose 403 No. 24180.00
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00
12 34 Set Tension Clamp for Earth wire
7/3.66mm 845.0649 Set 28732.21
13 5 Set Midspan compression joint for GS
Earth wire 7/3.66mm 352.75 Set 1763.75
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40
15 47 No. Flexible copper bond for earthing 935 No. 43945.00
16 243.6 KM ACSR Moose conductors 1.0% sag 309470 KM 75386892.00
17 10.1 KM GI EARTH WIRE 7/3.66mm 1.5% sag
52331 KM 528543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 No. 51405.00
20 7 No. Counter poise earthing (120m length) 9484 No. 66388.00
Tower Accessories
21 30 No. Number plate 299 No. 8970.00
22 30 No. Danger Board 362 No. 10860.00
23 60 No. Phase plate( Set of three) 319 No. 19140.00
24 120 No. Circuit plate 306 No. 36720.00
25 30 No. Anti-climbing devices 14292 No. 428760.00

64
26 TOTAL COST OF MATERIALS 176548435.06
TOWER FOUNDATIONS
27 13 No. A type tower 532435 No. 6921655.00
0° to 2° Suspension tower
28 4 No. B type tower 1651651 No. 6606604.00
2° to 15° Light angle tower
29 4 No. C type tower 2066562 No. 8266248.00
15° to 30° Medium angle tower
30 9 No. D type tower 2424891 No. 21824019.00
30° to 60° High angle & Dead end
tower
31 Tower protection works 15% on foundation 3269176.05
32 TOTAL FOUNDATION COST 46887702.05

33 Total Cost of materials & Foundation 223436137.11

32 Erection charges(10% on item 26) 17654843.51

33 10 KM Tree/Crop compensation 2000000 KM 20000000.00


Total amount 261090980.61

34 GST @ 18% on total amount 46996376.51


Labour Welfare Fund 1.0% on
35 Foundation & Erection Charges 645425.46
Transportation & Insurance charges
36 (5% on Item 26) 8827421.75
37 Contingencies (1% on Foundation,
material & Erection charges) 2699184.02
38 Total Cost of Materials, Foundation
and Erection charges but excluding
GST 272617586.39
39 Establishment & Supervision Charges
at 15.0% on item 39 40892637.96
40 Total Cost of Materials, Foundation
and Erection charges including GST &
LWF 320259388.35
41 TOTAL COST PER 10 KM 361152026.31
42 EPF at 13.36 % on labour portion
5010005.59
43 ESI at 4.75 % on labour portion 1729471.41
44 Land compensation 2038660.00
45 TOTAL COST PER 10 KM 369930163.31
46 TOTAL COST PER 1 KM 36993016.33
(Rounding to nearest 1000) SAY 36994000.00
COST PER KM IN LAKHS 369.94

65
Route lenth taken

DA DB DC DD
13 4 4 9
5.479 17.9759 19.592 21.629
11.306 8.32268 10.75328 13.6
0.702002 1.441715 1.47252 1.72588

276 138
1152 1152 1152

78

54
48 48 108

72 72 162

13

8 8 18

16 16 36
13 8 8 18

10 3 3 7
3 1 1 2

13 4 4 9
13 4 4 9
26 8 8 18
26 8 8 18
13 4 4 9

66
13

67
10 KM

Total Adding 10%

416.1596 457.78
345.6818 380.25
36.31589 37.04

4830 4927
19584 19976

78 78

54 54
204 204

1090.909 1091

306 306

120 120
60 60

13 13

34 34

5 5

68 68
47 47
240 243.6

10 10.1
10 10.5

23 23
7 7

30 30
30 30
60 60
120 120
30 30

68
13 13

4 4

4 4

9 9

69
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE 4 TC 2) WITH QUAD MOOSE
CONDUCTOR

Sl. Amount in Rs.


No Quantity Unit Description Rate in Rs. Per
.
1 Galvanised steel tower materials with
extension part wherever necessary,
and bolts and nutsetc.,
12945 MT
575.96 MT a) HT Steel 69000 MT 39741240.00
396.73 MT b) MS 65000 MT 25787450.00
40.53 MT c) Ordinary Bolts & nuts 90000 MT 3647700.00
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 4927 No. 120 KN Disc Insulators 491.3 No. 2420635.10
3 19976 No. 160 KN Disc Insulators 867 No. 17319192.00
Conductor & Earth wire accessories
4 78 Set Twin I suspension string for QUARD
ACSR Moose 20100 Set 1567800.00
5 54 Set Single I suspension pilot string with
counter weight 36493 Set 1970622.00
6 204 Set QUAD Tension string 56358 Set 11497032.00
7 1091 Set Spacer Damper for Quad ACSR Moose
7 Nos. for 400m 2019 Set 2202729.00
8 306 Set Rigid Spacer for conductor ACSR
Moose 3 Nos. per jumper 2218.5 Set 678861.00
9 120 Set
Midspan compression joint for Moose 1268.2 Set 152184.00
10 60 No. Repair sleeve for Moose 403 No. 24180.00
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00
12 34 Set Tension Clamp for Earth wire
7/3.66mm 845.0649 Set 28732.21
13 5 Set Midspan compression joint for GS
Earth wire 7/3.66mm 352.75 Set 1763.75
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40
15 47 No. Flexible copper bond for earthing 935.00 No. 43945.00
16 243.6 KM ACSR Moose conductors 1.5% sag 309470 KM 75386892.00
17 10.1 KM GI EARTH WIRE 7/3.66mm 1.0% sag
52331 KM 528543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 No. 51405.00
20 7 No. Counter poise earthing (120m length) 9484 No. 66388.00
Tower Accessories
21 30 No. Number plate 299 No. 8970.00
22 30 No. Danger Board 362 No. 10860.00
23 60 No. Phase plate( Set of three) 319 No. 19140.00
24 120 No. Circuit plate 306 No. 36720.00
25 30 No. Anti-climbing devices 14292 No. 428760.00

66
26 TOTAL COST OF MATERIALS 186088155.06

67
TOWER FOUNDATIONS
27 13 No. A type tower 946538 No. 12304994.00
0° to 2° Suspension tower
28 4 No. B type tower 2229207.00 No. 8916828.00
2° to 15° Light angle tower
29 4 No. C type tower 2698242.00 No. 10792968.00
15° to 30° Medium angle tower
30 9 No. D type tower 3287720.00 No. 29589480.00
30° to 60° High angle & Dead end
tower
31 Tower protection works 15% on foundation 9240640.50
32 TOTAL COST ON FOUNDATION 70844910.50
Total Cost of materials &
33 FOUNDATION 256933065.56

34 Erection charges(10% on item 26) 18608815.51

35 10 KM Tree/Crop compensation 2000000 KM 20000000.00


Total amount 295541881.06
36 GST @ 18% on total amount 53197538.59
Labour Welfare Fund 1.0% on
37 Foundation & Erection Charges 894537.26
Transportation & Insurance charges
38 (5% on Item 26) 9304407.75
39 Contingencies 1% on Foundation
Erection and Materials 3048462.89
40 Total Cost of Materials, Foundation
and Erection charges but excluding
GST 307894751.70
41 Establishment & Supervision Charges
at 15.0% on item 41 46184212.76
42 Total Cost of Materials, Foundation
and Erection charges including GST &
LWF 361986827.55
43 TOTAL COST PER 10 KM 408171040.31
44 EPF at 13.36 % on labour portion
6459876.89
45 ESI at 4.75 % on labour portion 2229972.04
46 Land compensation 2038660.00
47 TOTAL COST PER 10 KM 418899549.23
48 TOTAL COST PER 1 KM 41889954.92
(Rounding to nearest 1000) SAY 41890000.00
COST PER KM IN LAKHS 418.90

68
DA DB DC DD
13 4 4 9
8.34 20.207 24.034 26.468
10.302 10.411 10.942 15.703
0.791 1.279 1.648 1.972

276 138
1152 1152 1152

78

54
48 48 108

72 72 162

13

8 8 18

16 16 36
13 8 8 18

10 3 3 7
3 1 1 2

13 4 4 9
13 4 4 9
26 8 8 18
26 8 8 18
13 4 4 9

69
70
13

71
10 KM

Total Adding 10%

523.596 575.96
360.665 396.73
39.739 40.53

4830 4927
19584 19976

78 78

54 54
204 204

1090.909 1091

306 306

120 120
60 60

13 13

34 34

5 5

68 68
47 47
240 243.6

10 10.1
10 10.5

23 23
7 7

30 30
30 30
60 60
120 120
30 30

72
73
13 13

4 4

4 4

9 9

74
COST DATA FOR 400 KV DC LINE ON DC TOWERS (WIND ZONE 5, TC 1) WITH QUAD MOOSE
CONDUCTOR
Sl. Amount in Rs.
No Quantity Unit Description Rate in Rs. Per
. 10 KM
1 Galvanised steel tower materials with
extension part wherever necessary, and
bolts and nutsetc., DA DB DC DD Total Adding 10%
12945 MT 13 4 4 9
718.49 MT a) HT Steel 69000 MT 49575810.00 11.422 23.652 29.562 32.426 653.176 718.49
368.8 MT b) MS 65000 MT 23972000.00 8.399 11.068 10.398 15.58 335.271 368.8
40.5 MT c) Ordinary Bolts & nuts 90000 MT 3645000.00 0.687 1.468 1.738 1.995 39.71 40.5
0 MT d)Anti-theft bolts and nuts 90000 MT 0.00
2 4927 No. 120 KN Disc Insulators 491.3 No. 2420635.10 276 138 4830 4927
3 19976 No. 160 KN Disc Insulators 867 No. 17319192.00 1152 1152 1152 19584 19976
Conductor & Earth wire accessories
4 78 Set Twin I suspension string for QUARD
ACSR Moose 20100 Set 1567800.00 78 78 78
5 54 Set Single I suspension pilot string with
counter weight 36493 Set 1970622.00 54 54 54
6 204 Set QUAD Tension string 56358 Set 11497032.00 48 48 108 204 204
7 1091 Set Spacer Damper for Quad ACSR Moose 7
Nos. for 400m 2019 Set 2202729.00 1090.909 1091
8 306 Set Rigid Spacer for conductor ACSR Moose
3 Nos. per jumper 2218.5 Set 678861.00 72 72 162 306 306
9 120 Set Midspan compression joint for Moose 1268.2 Set 152184.00 120 120
10 60 No. Repair sleeve for Moose 403 No. 24180.00 60 60
11 13 Set Suspension clamp for Earth wire
7/3.66mm 845 Set 10985.00 13 13 13
12 34 Set Tension Clamp for Earth wire 7/3.66mm
845.0649 Set 28732.21 8 8 18 34 34
13 5 Set Midspan compression joint for GS Earth
wire 7/3.66mm 352.75 Set 1763.75 5 5
14 68 No. Vibration Damper for Earth wire
7/3.66mm 640.05 Set 43523.40 16 16 36 68 68
15 47 No. Flexible copper bond for earthing 935 No. 43945.00 13 8 8 18 47 47
16 243.6 KM ACSR Moose conductors 1.5% sag 309470 KM 75386892.00 240 243.6
17 10.1 KM GI EARTH WIRE 7/3.66mm 1.0% sag
52331 KM 528543.10 10 10.1
18 10.5 KM OFC ground wire with accessories 229705 KM 2411902.50 10 10.5
Earthing Materials
19 23 No. Pipe type earthing 2235 No. 51405.00 10 3 3 7 23 23
20 7 No. Counter poise earthing (120m length) 9484 No. 66388.00 3 1 1 2 7 7
Tower Accessories
21 30 No. Number plate 299 No. 8970.00 13 4 4 9 30 30
22 30 No. Danger Board 362 No. 10860.00 13 4 4 9 30 30
23 60 No. Phase plate( Set of three) 319 No. 19140.00 26 8 8 18 60 60
24 120 No. Circuit plate 306 No. 36720.00 26 8 8 18 120 120
25 30 No. Anti-climbing devices 14292 No. 428760.00 13 4 4 9 30 30
26 TOTAL COST OF MATERIALS 194104575.06
TOWER FOUNDATIONS
27 13 No. A type tower 996637 No. 12956281.00 13 13 13
0° to 2° Suspension tower
28 4 No. B type tower 2211665 No. 8846660.00 4 4 4
2° to 15° Light angle tower
29 4 No. C type tower 2814836 No. 11259344.00 4 4 4
15° to 30° Medium angle tower
30 9 No. D type tower 4209477 No. 37885293.00 9 9 9

30° to 60° High angle & Dead end tower


31 Tower protection works 15% on foundation 10642136.70
32 TOTAL COST ON FOUNDATION 81589714.70

33 Total Cost of materials & FOUNDATION 275694289.76

34 Erection charges(10% on item 26) 19410457.51

35 10 KM Tree/Crop compensation 2000000 KM 20000000.00


Total amount 315104747.26

36 GST @ 18% on total amount 56718854.51


Labour Welfare Fund 1.0% on
37 Foundation & Erection Charges 1010001.72
Transportation & Insurance charges (5%
38 on Item 26) 9705228.75
39 Contingencies 1% on Foundation
Erection and Materials 3248099.76
40
Total Cost of Materials, Foundation and
Erection charges but excluding GST 328058075.78
41 Establishment & Supervision Charges at
15.0% on item 41 49208711.37
42 Total Cost of Materials, Foundation and
Erection charges including GST & LWF
385786932.00
43 TOTAL COST PER 10 KM 434995643.37
44 EPF at 13.36 % on labour portion 7161576.85
45 ESI at 4.75 % on labour portion 2472201.31
46 Land compensation 2038660.00
47 TOTAL COST PER 10 KM 446668081.53
48 TOTAL COST PER 1 KM 44666808.15
(Rounding to nearest 1000) SAY 44667000.00
COST PER KM IN LAKHS 446.67

68
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DOUBLE CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
1 Galvanised steel tower materials with extension part
wherever necessary, and bolts and nutsetc.,

1511.69 MT HT STEEL 69000 MT 104,306,610.00


501.78 MT MS STEEL 65000 MT 32,615,700.00
78.94 MT c) Ordinary Bolts & nuts 90000 MT 7,104,600.00
0 MT d)Anti-theft bolts and nuts 90000 MT -
2 4364 No. 120 KN Disc Insulators 491.3 No. 2,144,033.20
3 9988 No. 160 KN Disc Insulators 867 No. 8,659,596.00
Conductor & Earth wire accessories
4 78 Set Single I suspension string for Twin ACSR Moose 18354.05 Set 1,431,615.90
5 108 Set Single I suspension pilot string with counter weight 39037 Set 4,215,996.00
6 204 Set Double Tension string 21269 Set 4,338,876.00
7 408 Set Vibration Damper for Twin ACSR Moose 1317.5 Set 537,540.00
8 1273 Set Bundle spacer for Twin Moose 1413.55 Set 1,799,449.15
8 306 Set Rigid Spacer for conductor ACSR Moose 3 Nos. per 849.15 Set 259,839.90
9 60 Set Midspan compression joint for Moose 1268.2 Set 76,092.00
10 30 No. Repair sleeve for Moose 403 No. 12,090.00
11 13 Set Suspension clamp for Earth wire 7/3.66mm 845 Set 10,985.00
12 34 Set Tension Clamp for Earth wire 7/3.66mm 845.0649 Set 28,732.21
13 5 Set Midspan compression joint for GS Earth wire
7/3.66mm 352.75 Set 1,763.75
14 68 No. Vibration Damper for Earth wire 7/3.66mm 640.05 Set 43,523.40
15 47 No. Flexible copper bond for earthing 935 No. 43,945.00
16 121.8 KM ACSR Moose conductors 1.0% sag 309470 KM 37,693,446.00
17 10.10 KM GI EARTH WIRE 7/3.66mm 1.50% sag 52331 KM 528,543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2,411,902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 No. 51,405.00
20 7 No. Counter poise earthing (120m length) 9484 No. 66,388.00
21 Tower Accessories
22 30 No. Number plate 299 No. 8,970.00
23 30 No. Danger Board 362 No. 10,860.00
24 60 No. Phase plate( Set of three) 319 No. 19,140.00
25 60 No. Circuit plate 306 No. 18,360.00
26 30 No. Anti-climbing devices 14292 No. 428,760.00
27 TOTAL COST ON MATERIALS 208,868,762.11
TOWER FOUNDATIONS
28 13 No. QA type tower 1864771 No. 24,242,023.00
0° to 2° Suspension tower
29 4 No. QB type tower 3605828 No. 14,423,312.00
2° to 15° Light angle tower
30 4 No. QC type tower 4687194 No. 18,748,776.00
15° to 30° Medium angle tower
31 9 No. QD type tower 6810387 No. 61,293,483.00
30° to 60° High angle & Dead end tower
32 Tower protection works 15% on Foundation cost 17,806,139.10
33 TOTAL COST OF FOUNDATION 136,513,733.10
32 Total Cost of materials & Foundation 345,382,495.21
33 Erection charges(10% on item 27) 20,886,876.21
34 10 KM Tree/Crop compensation 2000000 KM 20,000,000.00
Total amount 386,269,371.42
35 GST @ 18% on total amount 69528486.86

70
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV DOUBLE CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
36 Labour Welfare Fund 1.0% on Foundation &
Erection Charges 1,574,006.09

Transportation & Insurance charges (5% on Item


37 27) 10,443,438.11
38 Contingencies (1% on Material, Erection &
Foundation charges 3,967,128.10
39 Total Cost of Materials, Foundation and Erection
charges but excluding GST 400,679,937.62
40 Establishment & Supervision Charges at 15.0% on
item 40 60,101,990.64
41 Total Cost of Materials, Foundation and Erection
charges including GST & LWF 471,782,430.57
42
TOTAL COST FOR 10 KM 531884421.21
43 EPF at 13.36 % on labour portion
10387750.04
44 ESI at 4.75 % on labour portion
6484402.32
45 Land compensation
2038660.00
46 TOTAL COST PER 10 KM 550795233.57
47 TOTAL COST PER 1 KM 55079523.36
(Rounding to nearest 1000) SAY 55,080,000.00
COST PER KM IN LAKHS 550.80

71
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV 4 CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
1 Galvanised steel tower materials with extension part
wherever necessary, and bolts and nutsetc.,

1511.69 MT HT STEEL 69000 MT 104,306,610.00


501.78 MT MS STEEL 65000 MT 32,615,700.00
78.94 MT c) Ordinary Bolts & nuts 90000 MT 7,104,600.00
0 MT d)Anti-theft bolts and nuts 90000 MT -
2 6194 No. 120 KN Disc Insulators 491.3 No. 3,043,112.20
3 19976 No. 160 KN Disc Insulators 867 No. 17,319,192.00
Conductor & Earth wire accessories
4 156 Set Single I suspension string for Twin ACSR Moose 18354.05 Set 2,863,231.80
5 108 Set Single I suspension pilot string with counter weight 39037 Set 4,215,996.00
6 408 Set Double Tension string 21269 Set 8,677,752.00
7 816 Set Vibration Damper for Twin ACSR Moose 1317.5 Set 1,075,080.00
8 2546 Set Bundle spacer for Twin Moose 1413.55 Set 3,598,898.30
8 612 Set Rigid Spacer for conductor ACSR Moose 3 Nos. per 849.15 Set 519,679.80
9 120 Set Midspan compression joint for Moose 1268.2 Set 152,184.00
10 60 No. Repair sleeve for Moose 403 No. 24,180.00
11 13 Set Suspension clamp for Earth wire 7/3.66mm 845 Set 10,985.00
12 34 Set Tension Clamp for Earth wire 7/3.66mm 845.0649 Set 28,732.21
13 5 Set Midspan compression joint for GS Earth wire
7/3.66mm 352.75 Set 1,763.75
14 68 No. Vibration Damper for Earth wire 7/3.66mm 640.05 Set 43,523.40
15 47 No. Flexible copper bond for earthing 935 No. 43,945.00
16 243.6 KM ACSR Moose conductors 1.0% sag 309470 KM 75,386,892.00
17 10.10 KM GI EARTH WIRE 7/3.66mm 1.50% sag 52331 KM 528,543.10
18 10.5 KM OFC ground wire with accessories 229705 KM 2,411,902.50
Earthing Materials
19 23 No. Pipe type earthing 2235 No. 51,405.00
20 7 No. Counter poise earthing (120m length) 9484 No. 66,388.00
21 Tower Accessories
22 30 No. Number plate 299 No. 8,970.00
23 30 No. Danger Board 362 No. 10,860.00
24 120 No. Phase plate( Set of three) 319 No. 38,280.00
25 120 No. Circuit plate 306 No. 36,720.00
26 30 No. Anti-climbing devices 14292 No. 428,760.00
27 TOTAL COST ON MATERIALS 264,613,886.06
TOWER FOUNDATIONS
28 13 No. QA type tower 1864771 No. 24,242,023.00
0° to 2° Suspension tower
29 4 No. QB type tower 3605828 No. 14,423,312.00
2° to 15° Light angle tower
30 4 No. QC type tower 4687194 No. 18,748,776.00
15° to 30° Medium angle tower
31 9 No. QD type tower 6810387 No. 61,293,483.00
30° to 60° High angle & Dead end tower
32 Tower protection works 15% on Foundation cost 17,806,139.10
33 TOTAL COST OF FOUNDATION 136,513,733.10
32 Total Cost of materials & Foundation 401,127,619.16
33 Erection charges(10% on item 27) 26,461,388.61
34 10 KM Tree/Crop compensation 2000000 KM 20,000,000.00
Total amount 447,589,007.76

72
TAMILNADU TRANSMISSION CORPORATION LIMITED
COST DATA FOR 400 KV 4 CIRCUITS LINE ON MC TOWERS (WIND ZONE-5, TC-1) WITH TWIN MOOSE
CONDUCTOR
Sl. Amount in Rs.
Quantity DESCRIPTION Rate in Rs. Per
No.
35
GST @ 18% on total amount 80566021.40
36 Labour Welfare Fund 1.0% on Foundation &
Erection Charges 1,629,751.22
Transportation & Insurance charges (5% on Item
37 27) 13,230,694.30
38 Contingencies (1% on Material, Erection &
Foundation charges 4,608,197.02
39
Total Cost of Materials, Foundation and Erection
charges but excluding GST 465,427,899.09
40 Establishment & Supervision Charges at 15.0% on
item 40 69,814,184.86
41 Total Cost of Materials, Foundation and Erection
charges including GST & LWF 547,623,671.70
42
TOTAL COST FOR 10 KM 617437856.56
43 EPF at 13.36 % on labour portion
11154802.94
44 ESI at 4.75 % on labour portion
3850676.89
45 Land compensation
2038660.00
46 TOTAL COST PER 10 KM 634481996.39
47 TOTAL COST PER 1 KM 63448199.64
(Rounding to nearest 1000) SAY 63,449,000.00
COST PER KM IN LAKHS 634.49

73
110 KV Lines
Sl. No Name of line A B C D
1 Villupuram-Deviakurichi @alagapuram 5 8
2 Vengaimadalam -Musiri @ Jambunathapuram 5
3 Vaitheeswarankoil-Thiruvengadu@Poraiiyar 54 11 31
4 Nemilithippikadu-Pattukottai@Karambayam 5 1 3
5 Kadalangudi-Vaitheeswarankoil@nidur 3
6 Villupuram-Deviakurichi @manalurpet 56 26
7 Kopoovanur-Periyavadivadi 27 6 4
8 Kadalangudi-Aduthura@Jayakondam 24 19 14
9 Perambalur-Krishnapuram@alambadi 3
10 Perambalur-Ariyalur@Perali 4
12 Mayiladuthurai-Thiryuvarur@Perambur 8 3 5
13 Thirumakottai-Voimedu 88 25 27
14 Neyveli-Deviyakurichy@Adari 3
15 KGTPS-Koothakudi 28 18 4
16 Trichy-Samayapuram 1 4
17 Trichy-Samayapuram 70 13 44
18 Trichy-Samayapuram@Kambarasampettai 5 7
19 Kdalankudi-Neyveli line 96 27 13
20 KGTPS-Paliyur@Kumbakonam 76 28 61
21 Kumbakonam-Koilvenni 54 15 10
22 Kumbakonam-Koilvenni@Kumbakonam230KV SS 12 3 17
23 Neyveli-Villupuran@Thurunavalur 23 6 10
24 Pudukottai230-Sipcot SS 12
25 Pudukottai-Thirumayam@Pudukottai urban SS 7 19
26 Thanjavur Thuruvarur line 134 29 72
27 Alundur-Trichy@Manikandam 1 1 6
28 Rajathivalasi@olapalayam 6
29 Arasur-Annur@Pasur 6 7
30 KG Denim @ Thenthirumalai 6 13
31 Udumalpet-Ponnapuram@Kottamangalam 11
32 Ingur-Thingalur@Pallukondapalayam 4 9
33 Thudiyalur-Sandinallah Feeder 2 18
34 Ingur-Ponnapuram@kurukathhi 23 17 28
35 Erode-Pugalur@Kurukathi 42 34 24
36 Arasur-Ingur@Vengipalayam 6 5 6
37 Thudiyalur-Sandinallah Feeder 4 3 2
38 Aliyar-Negamam@Thalakarai 29 58
39 SRPudur-Arumuganeri@Sanganankulam 1 2 3
40 Koilpatty Traction ss 23 6 10
41 Madurai-Anuppankulam 88 19 25
42 Madurai-Anuppankulam & Virudunagar Spurline 84 24 20
43 Kappalur-Pasumalai 35 20 12
44 Kayathar-Arumuganeri@srimoolakarai 13 4 6
45 Theni-Pasumalai@Valuthur 2 2 9
47 THeni-Pasumalai@Kandamanur Villakku 3 7 7
48 Tuticorin-Arumuganeri 71 4 17
49 Pasumalai-Alagarkoil@Ilanthaikulam 1 2
50 Kavanur-Ilayankudi@Maravamangalam 50 6 19
51 Muthiyapuram-Tuticorin Coal Yard 11 5 24
52 Pasumalai-Sempatty Feeder I 150 20 37
53 Pasumalai-Alagarkoil@Otthakadai 4
54 Sempatty-Thei Feeder II @ Nilakottai 9 13
55 Pallakkapalyam-Thevur 15 18 10
56 Zuzuvadi-Bagalur 20 14 21
57 Hosur-Pagalur@Narignanapuram 12 30 5
58 Hosur-Kempatty 15 12 14
59 Sholingur-Brakes India 6
60 Mettur-Singarpet 166 45 14
61 Karimangalam-Vellichandai 33 18 15
62 Mosur-Pallur@Punnai 22 10 12
63 Deviyakurichy-Thammampatty@Gudamalai 2
64 Karimangalam-Hosur@Guruparapalli 1 4
65 Deviyakurichy-Krishnapuram@Thedavur 2 5 4
66 DharmapuriDharmapuri 110 KV SS 21 23 21
67 Dharmapuri-Vellichandai 34 40 34
68 Mettur-Singarapet@Thoppur 3
69 Salem-Sankari@Veerapandi 1 6
70 Salem-Theviyakurichy@Belur 10 22 31
71 Alandur-Paramathy@Valayapatty 63 31 19
72 T-Off to Vaduventhangal SS 9 9 8
73 Vaniyambadi-Alangayam 38 17 9
74 Vinnamagalam-Vadakathipatty 3 3 2
1853 729 1045
AVERAGE for 10 KM 20.33667 8.000773 11.46887
Say 20 8 12
ANNEXURE-6
230 KV Lines
Length Sl. No Name of line A B C
2.91 1 Palladam-Ingur 6
1.014 2 Myvadi-Pugalur@Kurakathi 45 41
23.414 3 Palladam-Ingur@Kurakathi 45 46
2.674 4 Karaikudi-Kavanur 209 49
0.45 5 Vellappaneri-Kayathar 11 10
21.605 6 Soolagiri-Singarapet @Guruparapalli
11.41 7 Deviakurichy-Pudanchandai@Valyapatty 21 49
12.944 8 Mettur-Karimangalam@Dharmapuri 2 7
0.57 9 Dharmapuri-Gurparapalli 79 93
0.84 412 301
3.91 AVERAGE FOR 10KM LINE 16.38171 11.96819
36.5 Say 16 12
0.34
12.6
1.056 ANNEXURE-3
32.685 400KV Lines
2.745 1 MTPS-Thiruvalam 323 132 110
37.94 2 Thiruvalam-Kanagammachatram 123 19 24
40.693 3 Abishekapatty-Kanarpatty 23 5 3
19.9 4 Kayathar-Kanarpatty 20 3 2
7.912 5 LI-LO Alamathy-SVCM @Guindy 19 7 5
9.805 6 Ottiambakkam-Guindy 11 4 4
3.037 7 Manali-Korattur 39 14 17
5.754 8 Thervoi-alamathy-NCTPS-Korattur 64 8 19
61.677 235 9 LI-LO MTPS-Arasur@Karamadai 400 KV 44 11 14
1.159 666 203 198
1.195 AVERAGE FOR 10KM LINE 12.95528 3.948832 3.851571
2.635 Say 13 4 4
3.3
3.3
2.6
5.625
17.14
26.45
3.52
2.563
16.665
0.79
10.3
35.376
32.264
15.395
5.92
3.1
3.5
22.655
0.445
18.453
8.595
57.95
0.316
4.62
10.325
13.52
11.845
9.205
0.945
63.75
16.22
10.885
0.14
0.76
2.2
15.585
26.24
0.31
1.02
14.443
29.84
6.344
15.314
2.055
911.162
D Length
10 3.6
39 30.865
51 32.215
68 88.173
27 11.047
3 0.77
26 24.055
9 3.2
60 57.575
293 251.5
11.6501
12

226 270.141
42 70.698
18 14.9
14 12.675
14 13.3
26 14.8
84 48.9
26 39.5
15 29.162
465 514.076
9.045355
9