Professional Documents
Culture Documents
Hazrd Identification Plan - July 2019
Hazrd Identification Plan - July 2019
Hazrd Identification Plan - July 2019
b) Doing work unsafely and exposure to b) PTW must available on site and
danger would cause near misses, incident need to brief / explain to all workers Emergency contact no:
and accident to the workers. working in the project on the content a) Hussin (Arza) - 7174009
of HIP. b) Ganasan (ARZA) 8746038
c) HSE Officer.: 8754005
c) Toolbox talk should be done d) Ambulance - 991
before start any work. Cascade work e) Police - 993
activity and hazard to the workers. f) Bomba - 995
g) Search & Rescue - 998
h) Shell Emergency - 2999
2. Erect and Installing a) Wrong technique of installation and a) Only experience personnel are All personnel
Assemblies Structure assemblies can cause the frame collapse. allowed to carry out the works involved in the
including transferring and manual activities. 'STOP' if any unsafe act on site
b) Falling from height. handling. and report to Supervisor.
c) Injury to back while lifting the materials. b) Where possible, working at height
should be avoided. If not, work
activity should be done using proper
ladder and usage of safety harness
by trained workers.
3. Staging Area a) Materials lying on the floor can cause a) Ensure good housekeeping practices All personnel
someone trip, slip and fall. in the working area. involved in the
activities.
b) Housekeeping must be done at all Emergency contact no:
times to prevent injuries before, during
a) Hussin (Arza) - 7174009
and after work is carried out. Put all
materials and separate the unusable b) Ganasan (ARZA) 8746038
materials at different area with c) HSE Officer.: 8754005
barricade. d) Ambulance - 991
e) Police - 993
a) Conform to Lifting and Hoisting, Supervisor, Forklift f) Bomba - 995
4. Lifting using Forklift a) Materials or equipment may fall from BSP-ASS-Standard-004. operator/Banksma g) Search & Rescue - 998
the forks of the forklift due to improper Provision of qualified forklift n h) Shell Emergency - 2999
positioning or incorrect technique of lifting, Operator and Banksman in line
overloading, defective forklift or due to with HSE training Standard, BSP-
02-Standard-0001 for the activity 'STOP' if any unsafe act on site
rough terrain or fork in tilted position.
and report to Supervisor.
b) Perform Risk assessment
Conform to BSP-13.03-Procedure-012,
Module 14 on Material Handling
Blocked or blind spot view resulting in property Conform to lifting and Hoisting BSP- Supervisor, Forklift
damage or striking personnel ASS-Standard-004 operator/Banksma Emergency contact no:
Provision of qualified forklift n a) Hussin (Arza) - 7174009
Operator and Banksman in line b) Ganasan (ARZA) 8746038
with HSE training Standard, BSP- c) HSE Officer.: 8754005
02-Standard-0001 for the activity d) Ambulance - 991
Established good communication e) Police - 993
between the Forklift Operator f) Bomba - 995
and Banksman g) Search & Rescue - 998
Banksman to stand at position h) Shell Emergency - 2999
where forklift operator can be
easily seen
'STOP' if any unsafe act on site
Perform Risk Assessment
and report to Supervisor.
No irrelevant personnel is
allowed during lifting
Ensure audible and visual
warning device of forklift is
functioning properly
c) Conform to BSP-13.03-Procedure-
012, Module 14 on Material Handling
Adhere speed limit
Safe working space while
operating
6. Manual Lifting / Handling Incorrect Lifting Technique a) Specific TBT with WHM incorporated
Conform to BSP-13.03-Procedure-012, Emergency contact no:
Module 14 on Material Handling a) Hussin (Arza) - 7174009
Perform risk assessment b) Ganasan (ARZA) 8746038
Know load weight c) HSE Officer.: 8754005
Correct body posture d) Ambulance - 991
e) Police - 993
Provision of the right tools, such as hands f) Bomba - 995
free tool when necessary and high impact g) Search & Rescue - 998
gloves
All personnel h) Shell Emergency - 2999
involved in the
a) Specific TBT with WHM incorporated activities
Sharp edges and heavy loads lifted
'STOP' if any unsafe act on site
and report to Supervisor.
Conform to BSP-13.03-Procedure-012,
Module 14 on Material Handling
Pinch finger whilst stacking of materials a) Specific TBT with WHM incorporated
and loading activity
Conform to BSP-13.03-Procedure-012,
Module 14 on Material Handling Emergency contact no:
a) Hussin (Arza) - 7174009
Know load weight and it structure
b) Ganasan (ARZA) 8746038
Mechanical aid to be use if load too c) HSE Officer.: 8754005
heavy d) Ambulance - 991
e) Police - 993
Provision of the right tools, such as hands
f) Bomba - 995
free tool when necessary and high impact
gloves g) Search & Rescue - 998
All personnel h) Shell Emergency - 2999
involved in the
7. Existing Rack and a) Falling object from higher level. a) Work within designated area only. activities
Materials 'STOP' if any unsafe act on site
b) Hit existing rack. b) Provide a proper clearance to existing and report to Supervisor.
rack and materials.
8. Use of Machineries, Electric shock a.) Check condition of lead and plug before
Power Tools and use.
Grinders b) Use 110v or battery tools or RCD where
practicable.
c) Check for hidden/buried cables before
drilling etc.
d) Do not work where water is present
without specialist advice.
e) Qualified person to test all portable
electrical hand tools at least annually.
HAZARD IDENTIFICATION PLAN
SUPPLY, DELIVER AND INSTALL LOGIMAT VERTICAL LIFT SYSTEM
REF ACTIVITY HAZARD IDENTIFICATION CONTROL ACTION BY CONTINGENCY
.
Tool jamming or binding / Wrist/hand a) Check tool is appropriate for the job
injury and used in accordance with
manufacturer’s instructions.
b) Trained operators only (or under
strict supervision).
c) Ensure tools are maintained
according to manufacturer’s
instructions.