Concrete Details Month o

Sr. Location Chainage Grade of Vehicle


Date Name of Structure
no Side Concrete No

1 02 August 17 VUP 239+050 RHS A2 P4 PILE M-35 3115


2 02 August 17 VUP 239+050 RHS A2 P4 PILE M-35 658
3 02 August 17 VUP 239+050 RHS A2 P4 PILE M-35 3115
4 04 August 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
5 04 August 17 VUP 239+050 RHS A2 P2 PILE M-35 3115
6 04 August 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
7 06 August 17 VUP 239+050 RHS A2 P5 PILE M-35 5305
5 06 August 17 VUP 239+050 RHS A2 P5 PILE M-35 3115
6 06 August 17 VUP 239+050 RHS A2 P5 PILE M-35 5305
7
8
9
10
11
Concrete Details Month of JANUARY - 2018
Slump @ Slump @
Challan Time Time Time Qty. in Total Qty
Driver Name Plant in Site in
No Dispatch Arrive Unlode M3 (Per Day)
MM MM

Madan 254 170 145 6.00


Ramcharan 255 170 150 6.00
Madan 256 165 155 3.50 15.50
Tapan 263 170 140 6.00
Madan 264 170 145 6.00
Tapan 265 170 150 3.50 15.50
Tapan 267 175 145 6.00
Madan 268 170 150 6.00
Tapan 269 170 155 4.00 16.00
Cum. Qty.
in M3
Remarks

6.00
12.00
15.50
6.00
12.00
15.50
6.00
12.00
16.00
Concrete Deta

Sr. Grade of Vehicle


Date Location Chainage Side Name of Structure
no Concrete No

1 01 January 18 256+500 to 256+520 RHS Drain WALL M-25 1028


2 01 January 18 256+680 to 256+710 RHS Drain RAFT M-25 5305
3 01 January 18 YARD 251+950 RHS RE Panal M-35 658
4 01 January 18 YARD 251+950 RHS RE Panal M-35 658
5 01 January 18 YARD 251+950 RHS RE Panal M-35 658
6 01 January 18 YARD 251+950 RHS RE Panal M-35 5305
7 01 January 18 256+600 to 256+610 LHS Drain WALL M-25 5305
8 01 January 18 250+300 to 250+310 LHS Drain WALL M-25 1028
9 03 January 18 256+600 to 256+620 RHS Drain WALL M-25 5305
10 03 January 18 250+730 to 250+740 RHS Drain SLAB M-25 3115
11 03 January 18 243+340 to 243+360 LHS Drain WALL M-25 658
12 03 January 18 250+760 R/S - 250+300 L/S Drain SLAB M-25 3115
13 03 January 18 256+590 to 256+610 LHS Drain WALL M-25 5305
14 03 January 18 256+640 to 256+652 LHS Drain SLAB M-25 658
15 03 January 18 256+500 to 256+520 LHS Drain PCC M-15 3115
16 03 January 18 YARD 251+950 RHS RE Panal M-35 1028
17 03 January 18 YARD 251+950 RHS RE Panal M-35 2649
18 03 January 18 YARD 251+950 RHS RE Panal M-35 2649
19 03 January 18 YARD 251+950 RHS RE Panal M-35 1028
20 04 January 18 BOX Culvert 252+570 RHS Hunch M-30 5305
21 04 January 18 BOX Culvert 252+570 RHS Hunch M-30 5305
22 04 January 18 250+810 to 250+850 LHS Drain SLAB M-25 3115
23 04 January 18 250+810 to 250+850 LHS Drain SLAB M-25 3115
24 04 January 18 256+640 to 256+670 RHS Drain RAFT M-25 1028
25 04 January 18 256+540 to 256+560 RHS Drain WALL M-25 3115
26 04 January 18 250+250 to 250+275 LHS Drain SLAB M-25 1028
27 04 January 18 YARD 251+950 RHS RE Panal M-35 5305
28 04 January 18 YARD 251+950 RHS RE Panal M-35 2649
29 04 January 18 YARD 251+950 RHS RE Panal M-35 5305
30 04 January 18 YARD 251+950 RHS RE Panal M-35 2649
31 04 January 18 256+540 to 256+560 LHS Drain WALL M-25 3115
32 04 January 18 250+370 to 250+380 LHS Drain SLAB M-25 658
33 04 January 18 250+370 to 250+380 LHS Drain SLAB M-25 658
34 05 January 18 243+325 to 243+340 LHS Drain WALL M-25 1028
35 05 January 18 250+250 to 250+260 LHS Drain SLAB M-25 5305
36 05 January 18 256+670 to 256+720 LHS Drain PCC M-15 658
37 05 January 18 250+250L/S & 256+570 L/S Drain WALL M-25 5305
38 05 January 18 YARD 251+950 RHS RE Panal M-35 2649
39 05 January 18 YARD 251+950 RHS RE Panal M-35 658
40 05 January 18 YARD 251+950 RHS RE Panal M-35 3115
41 05 January 18 YARD 251+950 RHS RE Panal M-35 1028
42 06 January 18 BOX Culvert 257+700 RHS Wall M-30 658
43 06 January 18 BOX Culvert 257+700 RHS Wall M-30 5305
44 06 January 18 BOX Culvert 257+700 RHS Wall M-30 3115
45 06 January 18 256+640 to 256+650 LHS Drain WALL M-25 3115
46 06 January 18 256+560 to 256+580 RHS Drain WALL M-25 658
47 06 January 18 256+520 to 256+540 LHS Drain WALL M-25 1028
48 06 January 18 VUP 239+050 RHS A1/A2 Pier Padastal M 40 5305
49 06 January 18 250+730 & 250+690 Lhs Drain SLAB M-25 658
50 06 January 18 250+690 to 250+700 Lhs Drain SLAB M-25 3115
51 06 January 18 YARD 251+950 RHS RE Panal M-35 3115
52 06 January 18 YARD 251+950 RHS RE Panal M-35 1028
53 06 January 18 YARD 251+950 RHS RE Panal M-35 5305
54 06 January 18 YARD 251+950 RHS RE Panal M-35 658
55 07 January 18 HPC 263+370 RHS PCC Of H.W./Chamber M-15 658
56 07 January 18 256+750 to 256+800 RHS Drain pcc M-15 3115
57 07 January 18 256+330 to 256+340 LHS Drain SLAB M-25 1028
58 07 January 18 250+350 to 250+360 Lhs Drain SLAB M-25 5305
59 07 January 18 250+700 to 250+710 Lhs Drain SLAB M-25 658
60 07 January 18 243+230 to 243+250 LHS Drain pcc M-15 3115
61 07 January 18 256+640 R/S & 256+340 L/S Drain WALL/SLAB M-25 1028
62 07 January 18 YARD 251+950 RHS RE Panal M-35 2649
63 07 January 18 YARD 251+950 RHS RE Panal M-35 5305
64 07 January 18 YARD 251+950 RHS RE Panal M-35 2649
65 08 January 18 256+580 to 256+600 LHS Drain WALL M-25 1028
66 08 January 18 256+580 to 256+600 LHS Drain RAFT M-25 658
67 08 January 18 250+300 to 250+310 Lhs Drain SLAB M-25 5305
68 08 January 18 YARD 251+950 RHS RE Panal M-35 2649
69 08 January 18 YARD 251+950 RHS RE Panal M-35 658
70 08 January 18 YARD 251+950 RHS RE Panal M-35 3115
71 08 January 18 YARD 251+950 RHS RE Panal M-35 1028
72 09 January 18 250+900 to 250+920 Lhs Drain pcc M-15 658
73 09 January 18 250+300 to 250+310 Lhs Drain SLAB M-25 5305
74 09 January 18 HPC 263+370 RHS Drain pcc M-15 3115
75 09 January 18 243+250 to 243+280 LHS Drain RAFT M-25 1028
76 09 January 18 MNRB 252+960 RHS PCC M-15 3115
77 09 January 18 MNRB 252+960 RHS PCC M-15 658
78 09 January 18 MNRB 252+960 RHS PCC M-15 658
79 09 January 18 256+580 to 256+600 LHS PCC M-15 5305
80 09 January 18 256+640 to 256+660 RHS Drain WALL M-25 1028
81 09 January 18 250+310 to 250+320 Lhs Drain SLAB M-25 3115
82 09 January 18 YARD 251+950 RHS RE Panal M-35 2649
83 09 January 18 YARD 251+950 RHS RE Panal M-35 5305
84 09 January 18 YARD 251+950 RHS RE Panal M-35 2649
85 09 January 18 YARD 251+950 RHS RE Panal M-35 658
86 09 January 18 251+980 to 252+000 Rhs Drain pcc M-15 3115
87 10 January 18 256+440 to 256+460 LHS Drain pcc M-15 5305
88 10 January 18 243+320 to 243+340 LHS Drain WALL M-25 1028
89 10 January 18 VUP 239+050 LHS A2 Pier Cap M 35 3115
90 10 January 18 VUP 239+050 LHS A2 Pier Cap M 35 5305
91 10 January 18 VUP 239+050 LHS A2 Pier Cap M 35 658
92 10 January 18 VUP 239+050 LHS A2 Pier Cap M 35 3115
93 10 January 18 VUP 239+050 LHS A2 Pier Cap M 35 658
94 10 January 18 250+360 & 250+300 Lhs Drain SLAB M-25 1028
95 10 January 18 250+300 to 250+310 Rhs Drain SLAB M-25 1028
96 10 January 18 YARD 251+950 RHS RE Panal M-35 2649
97 10 January 18 YARD 251+950 RHS RE Panal M-35 5305
98 10 January 18 YARD 251+950 RHS RE Panal M-35 2649
99 10 January 18 YARD 251+950 RHS RE Panal M-35 1028
100 11 January 18 250+670 to 250+680 Rhs Drain pcc M-15 3115
101 11 January 18 MNRB 252+960 RHS RAFT M-30 658
102 11 January 18 MNRB 252+960 RHS RAFT M-30 5305
103 11 January 18 MNRB 252+960 RHS RAFT M-30 1028
104 11 January 18 MNRB 252+960 RHS RAFT M-30 658
105 11 January 18 MNRB 252+960 RHS RAFT M-30 5305
106 11 January 18 MNRB 252+960 RHS RAFT M-30 5305
107 11 January 18 YARD 251+950 RHS RE Panal M-35 3115
108 11 January 18 YARD 251+950 RHS RE Panal M-35 1028
109 11 January 18 YARD 251+950 RHS RE Panal M-35 2649
110 11 January 18 YARD 251+950 RHS RE Panal M-35 2649
111 11 January 18 256+760 to 256+800 RHS Drain pcc M-15 658
112 11 January 18 VUP 239+050 LHS A2 Pier Padastal M 40 3115
113 11 January 18 256+760 to 256+800 RHS Drain SLAB M-25 5305
114 11 January 18 256+580 to 256+630 LHS Drain SLAB M-25 658
115 12 January 18 HPC 263+370 RHS Chamber Raft M-25 5305
116 12 January 18 250+260 to 250+280 Lhs Drain SLAB M-25 3115
117 12 January 18 250+260 to 250+280 Lhs Drain RAFT M-25 658
118 12 January 18 250+280 to 250+290 Lhs Drain SLAB M-25 5305
119 12 January 18 250+280 to 250+290 Lhs Drain SLAB M-25 1028
120 12 January 18 MNRB 252+960 RHS Wall M-30 5305
121 12 January 18 MNRB 252+960 RHS Wall M-30 5305
122 12 January 18 250+240 to 250+260 Lhs Drain RAFT M-25 658
123 12 January 18 250+430 L/S & 250+670 Rhs Drain RAFT M-25 1028
124 12 January 18 256+590 to 256+600 RHS Drain SLAB M-25 5305
125 12 January 18 256+590 to 256+600 RHS Drain SLAB M-25 658
126 12 January 18 YARD 251+950 RHS RE Panal M-35 2649
127 12 January 18 YARD 251+950 RHS RE Panal M-35 3115
128 12 January 18 YARD 251+950 RHS RE Panal M-35 5305
129 12 January 18 YARD 251+950 RHS RE Panal M-35 1028
130 12 January 18 YARD 251+950 RHS RE Panal M-35 2649
131 13 January 18 243+300 to 243+320 LHS Drain WALL M-25 658
132 13 January 18 MNRB 252+960 RHS Wall M-30 3115
133 13 January 18 250+220 to 250+240 Lhs Drain RAFT M-25 1028
134 13 January 18 250+220 to 250+240 Lhs Drain WALL M-25 658
135 13 January 18 YARD 251+950 RHS RE Panal M-35 2649
136 13 January 18 YARD 251+950 RHS RE Panal M-35 1028
137 13 January 18 YARD 251+950 RHS RE Panal M-35 658
138 13 January 18 YARD 251+950 RHS RE Panal M-35 2649
139 13 January 18 YARD 251+950 RHS RE Panal M-35 1028
140 13 January 18 256+560 to 256+580 LHS Drain SLAB M-25 3115
141 13 January 18 256+560 to 256+580 LHS Drain SLAB M-25 658
142 15 January 18 250+280 to 250+290 Lhs Drain SLAB M-25 658
143 15 January 18 250+270 to 250+280 Lhs Drain WALL M-25 5305
144 15 January 18 YARD 251+950 RHS RE Panal M-35 2649
145 15 January 18 YARD 251+950 RHS RE Panal M-35 1028
146 15 January 18 YARD 251+950 RHS RE Panal M-35 658
147 15 January 18 YARD 251+950 RHS RE Panal M-35 5305
148 16 January 18 256+520 to 256+560 LHS Drain SLAB M-25 3115
149 16 January 18 256+520 to 256+560 LHS Drain SLAB M-25 658
150 16 January 18 256+500 to 256+520 LHS Drain RAFT M-25 1028
151 16 January 18 250+280 to 250+290 LHS Drain SLAB M-25 3115
152 17 January 18 256+670 to 256+700 RHS Drain WALL M-25 658
153 17 January 18 256+670 to 256+700 RHS Drain WALL M-25 658
154 17 January 18 241+460 to 241+560 RHS Drain pcc M-15 3115
155 17 January 18 YARD 251+950 RHS RE Panal M-35 2649
156 17 January 18 YARD 251+950 RHS RE Panal M-35 2649
157 17 January 18 YARD 251+950 RHS RE Panal M-35 658
158 17 January 18 YARD 251+950 RHS RE Panal M-35 2649
159 17 January 18 250+230 to 250+250 LHS Drain WALL M-25 3115
160 18 January 18 241+500 to 241+560 RHS Drain pcc M-15 658
161 18 January 18 256+480 to 256+520 LHS Drain RAFT M-25 1028
162 18 January 18 256+750 to 256+800 RHS Drain pcc M-15 5305
163 18 January 18 250+230 to 250+240 LHS Drain WALL M-25 3115
164 18 January 18 YARD 251+950 RHS RE Panal M-35 2649
165 18 January 18 YARD 251+950 RHS RE Panal M-35 2649
166 18 January 18 YARD 251+950 RHS RE Panal M-35 1028
167 18 January 18 YARD 251+950 RHS RE Panal M-35 5305
168 19 January 18 256+750 to 256+800 RHS Drain pcc M-15 1028
169 19 January 18 BOX Culvert 257+700 LHS Drain pcc M-15 3115
170 19 January 18 BOX Culvert 257+700 LHS Drain pcc M-15 658
171 19 January 18 256+520 to 256+540 LHS Drain WALL M-25 5305
172 19 January 18 256+800 to 256+840 LHS Drain pcc M-15 3115
173 19 January 18 YARD 251+950 RHS RE Panal M-35 2649
174 19 January 18 YARD 251+950 RHS RE Panal M-35 5305
175 19 January 18 YARD 251+950 RHS RE Panal M-35 5305
176 19 January 18 YARD 251+950 RHS RE Panal M-35 2649
177 19 January 18 250+250 to 250+260 LHS Drain SLAB M-25 1028
178 20 January 18 243+400 to 243+420 LHS Drain SLAB M-25 658
179 20 January 18 256+700 to 256+720 RHS Drain RAFT M-25 5305
180 20 January 18 250+230 to 250+250 LHS Drain SLAB M-25 658
181 20 January 18 256+600 to 256+620 RHS Drain SLAB M-25 1028
182 20 January 18 YARD 251+950 RHS RE Panal M-35 5305
183 20 January 18 YARD 251+950 RHS RE Panal M-35 3115
184 20 January 18 YARD 251+950 RHS RE Panal M-35 2649
185 20 January 18 YARD 251+950 RHS RE Panal M-35 658
186 21 January 18 256+480 to 256+500 LHS Drain WALL M-25 658
187 21 January 18 256+740 to 256+770 LHS Drain RAFT M-25 5305
188 21 January 18 256+820 to 256+840 LHS Drain pcc M-15 3115
189 21 January 18 241+380 to 241+400 RHS Drain WALL M-25 1028
190 21 January 18 241+400 to 241+420 RHS Drain RAFT M-25 5305
191 21 January 18 241+400 to 241+420 RHS Drain RAFT M-25 658
192 21 January 18 256+520 to 256+540 LHS Drain SLAB M-25 3115
193 21 January 18 250+230 to 250+220 LHS Drain SLAB M-25 1028
194 21 January 18 256+560 to 256+580 RHS Drain SLAB M-25 3115
195 21 January 18 250+340 to 250+350 LHS Drain pcc M-15 5305
196 21 January 18 YARD 251+950 RHS RE Panal M-35 2649
197 21 January 18 YARD 251+950 RHS RE Panal M-35 1028
198 21 January 18 YARD 251+950 RHS RE Panal M-35 2649
199 21 January 18 YARD 251+950 RHS RE Panal M-35 658
200 22 January 18 256+560 to 256+580 RHS Drain SLAB M-25 658
201 22 January 18 243+380 to 243+400 LHS Drain SLAB M-25 1028
202 22 January 18 241+480 to 241+500 RHS Drain RAFT M-25 658
203 22 January 18 241+390 to 241+400 RHS Drain WALL M-25 5305
204 22 January 18 256+460 to 256+480 LHS Drain WALL M-25 1028
205 22 January 18 256+520 to 256+532 LHS Drain SLAB M-25 658
206 22 January 18 256+580 to 256+600 RHS Drain SLAB M-25 1028
207 22 January 18 250+340 to 250+350 LHS Drain RAFT M-25 5305
208 22 January 18 256+540 to 256+560 LHS Drain SLAB M-25 1028
209 22 January 18 YARD 251+950 RHS RE Panal M-35 2649
210 22 January 18 YARD 251+950 RHS RE Panal M-35 2649
211 22 January 18 YARD 251+950 RHS RE Panal M-35 658
212 22 January 18 YARD 251+950 RHS RE Panal M-35 2649
213 23 January 18 241+400 to 241+410 RHS Drain WALL M-25 1028
214 23 January 18 241+500 to 241+530 RHS Drain RAFT M-25 658
215 23 January 18 250+330 to 250+340 LHS Drain RAFT M-25 5305
216 23 January 18 256+450 to 256+460 RHS Drain SLAB/WALL M-25 5305
217 23 January 18 241+440 to 241+480 RHS Drain pcc M-15 1028
218 23 January 18 250+330 to 250+340 LHS Drain WALL M-25 658
219 23 January 18 YARD 251+950 RHS RE Panal M-35 3115
220 23 January 18 YARD 251+950 RHS RE Panal M-35 658
221 23 January 18 YARD 251+950 RHS RE Panal M-35 3115
222 23 January 18 YARD 251+950 RHS RE Panal M-35 1028
223 25 January 18 BOX Culvert 257+700 RHS SLAB M-30
224 25 January 18 BOX Culvert 257+700 RHS SLAB M-30 3115
225 25 January 18 BOX Culvert 257+700 RHS SLAB M-30 5305
226 25 January 18 BOX Culvert 257+700 RHS SLAB M-30 658
227 25 January 18 243+380 to 243+350 LHS Drain SLAB M-25 658
228 25 January 18 241+410 to 241+420 RHS Drain WALL M-25 1028
229 25 January 18 241+360 to 241+340 RHS Drain SLAB M-25 1028
230 25 January 18 241+530 to 241+560 RHS Drain RAFT M-25 3115
231 25 January 18 YARD 251+950 RHS RE Panal M-35 2649
232 25 January 18 YARD 251+950 RHS RE Panal M-35 2649
233 25 January 18 YARD 251+950 RHS RE Panal M-35 2649
234 25 January 18 YARD 251+950 RHS RE Panal M-35 2649
235 25 January 18 VUP 239+050 LHS A1 Pier CAP M-35 5305
236 25 January 18 VUP 239+050 LHS A1 Pier CAP M-35 658
237 25 January 18 VUP 239+050 LHS A1 Pier CAP M-35 3115
238 25 January 18 VUP 239+050 LHS A1 Pier CAP M-35 5305
239 25 January 18 VUP 239+050 LHS A1 Pier CAP M-35 658
240 25 January 18 241+580 to 241+620 RHS Drain pcc M-15 1028
241 25 January 18 241+330 to 241+350 RHS Drain pcc M-15 3115
242 25 January 18 256+620 to 256+640 RHS Drain SLAB M-25 5305
243 25 January 18 256+620 to 256+640 RHS Drain SLAB M-25 5305
244 26 January 18 256+440 to 256+460 LHS Drain SLAB M-25 1028
245 26 January 18 241+330 to 241+350 RHS Drain RAFT M-25 3115
246 26 January 18 YARD 251+950 RHS RE Panal M-35 2649
247 26 January 18 YARD 251+950 RHS RE Panal M-35 5305
248 26 January 18 250+330 to 250+340 LHS Drain SLAB M-25 2649
249 26 January 18 250+330 to 250+340 LHS Drain SLAB M-25 3115
250 26 January 18 256+540 to 256+550 LHS Drain SLAB M-25 658
251 27 January 18 251+930 to 251+960 RHS Drain pcc M-15 5305
252 27 January 18 241+320 to 241+340 RHS Drain RAFT M-25 1028
253 27 January 18 241+610 to 241+650 LHS Drain pcc M-15 5305
254 27 January 18 241+400 to 241+410 RHS Drain SLAB M-25 1028
255 27 January 18 243+360 to 243+380 LHS Drain WALL M-25 1028
256 27 January 18 256+740 to 256+760 LHS Drain RAFT M-25 5305
257 27 January 18 256+740 to 256+780 LHS Drain RAFT M-25 1028
258 27 January 18 BOX Culvert 257+700 LHS RAFT M-30 2649
259 27 January 18 BOX Culvert 257+700 LHS RAFT M-30 5305
260 27 January 18 BOX Culvert 257+700 LHS RAFT M-30 1028
261 27 January 18 BOX Culvert 257+700 LHS RAFT M-30 5305
262 27 January 18 256+740 to 256+780 LHS Drain SLAB M-25 2649
263 28 January 18 241+290 to 241+300 LHS Drain WALL M-25 5305
264 28 January 18 241+320 to 241+340 RHS Drain RAFT M-25 1028
265 28 January 18 256+760 to 256+780 RHS Drain RAFT M-25 1028
266 28 January 18 251+950 to 252+000 RHS Drain pcc M-15 658
267 28 January 18 256+620 to 256+640 RHS Drain SLAB M-25 1028
268 28 January 18 256+760 to 256+780 RHS Drain RAFT M-25 1028
269 28 January 18 241+380 to 241+370 RHS Drain SLAB M-25 5305
270 28 January 18 243+300 to 243+290 LHS Drain WALL M-25 5305
271 28 January 18 256+700 to 256+720 LHS Drain WALL M-25 658
272 28 January 18 256+760 to 256+800 LHS Drain RAFT M-25 3115
273 28 January 18 256+520 to 256+530 RHS Drain SLAB M-25 5305
274 29 January 18 256+760 to 256+800 LHS Drain RAFT M-25 658
275 29 January 18 241+330 to 241+350 LHS Drain WALL M-25 3115
276 29 January 18 241+600 to 241+625 RHS Drain RAFT M-25 5305
277 29 January 18 BOX Culvert 257+700 LHS HUNCH M-30 3115
278 29 January 18 256+720 to 256+730 RHS Drain WALL M-25 658
279 29 January 18 YARD 251+950 RHS RE Panal M-35 2649
280 29 January 18 YARD 251+950 RHS RE Panal M-35 5305
281 29 January 18 YARD 251+950 RHS RE Panal M-35 2649
282 29 January 18 YARD 251+950 RHS RE Panal M-35 5305
283 29 January 18 YARD 251+950 RHS RE Panal M-35 2649
284 29 January 18 256+720 to 256+730 RHS Drain SLAB M-25 3115
285 29 January 18 256+500 to 256+510 RHS Drain SLAB M-25 658
286 30 January 18 241+450 to 241+460 RHS Drain WALL M-25 3115
287 30 January 18 251+900 to 251+920 RHS Drain RAFT M-25 5305
289 30 January 18 251+900 to 251+920 RHS Drain RAFT M-25 5305
290 30 January 18 250+670 to 250+680 RHS Drain WALL M-25 1028
291 30 January 18 243+360 to 243+380 RHS Drain SLAB M-25 3115
292 30 January 18 243+360 to 243+380 RHS Drain SLAB M-25 1028
293 30 January 18 256+700 to 256+710 LHS Drain SLAB M-25 658
294 30 January 18 256+800 to 256+820 LHS Drain RAFT M-25 658
295 31 January 18 256+740 to 256+760 RHS Drain WALL M-25 3115
296 31 January 18 241+390 to 241+420 RHS Drain SLAB M-25 658
297 31 January 18 241+390 to 241+420 RHS Drain SLAB M-25 1028
298 31 January 18 256+740 to 256+760 RHS Drain SLAB/RAFT M-25 5305
299 31 January 18 256+800 to 256+820 RHS Drain RAFT M-25 3115
300 31 January 18 256+820 to 256+840 RHS Drain pcc M-15 658
301 31 January 18 241+460 to 241+480 RHS Drain WALL M-25 5305
302 31 January 18 241+460 to 241+480 RHS Drain WALL M-25 658
303 31 January 18 256+650 to 256+660 RHS Drain SLAB M-25 3115
304 31 January 18 251+940 to 251+960 RHS Drain RAFT M-25 5305
305 31 January 18 YARD 251+950 RHS RE Panal M-35 1028
306 31 January 18 YARD 251+950 RHS RE Panal M-35 1028
307 31 January 18 YARD 251+950 RHS RE Panal M-35 1028
308 31 January 18 YARD 251+950 RHS RE Panal M-35 2649
Concrete Details Month of January - 2018
Slump Slump Total Qty
Challan Time Time Time Qty. in
Driver Name @ Plant @ Site (Per
No Dispatch Arrive Unlode M3
in MM in MM Day)

Shashi 968 3:28 PM 140 3:50 PM 110 3.00


Tapan 970 4:23 PM 135 4:55 PM 105 6.00
Ramcharan 971 4:46 PM 90 4:55 PM 70 6.00
Ramcharan 973 6:10 PM 90 6:20 PM 70 6.00
Ramcharan 975 7:46 PM 95 7:55 PM 80 6.50
Tapan 976 8:10 PM 95 8:20 PM 85 2.50 21.00
Tapan 972 5:48 PM 135 6:10 PM 100 3.00
Shashi 974 6:44 PM 140 7:10 PM 105 3.25
Tapan 977 10:36 AM 145 10:55 AM 110 6.00
Madan 978 11:00 AM 140 11:15 AM 105 7.00
Ramcharan 981 12:14 PM 145 12:45 AM 100 5.00
Madan 982 1:06 PM 140 1:25 AM 100 6.50
Tapan 984 2:24 PM 145 2:55 AM 110 6.00
Ramcharan 986 4:17 PM 135 4:50 AM 100 4.00
Madan 987 6:00 PM 135 6:20 AM 100 3.00
Shashi 979 11:20 AM 90 11:30 AM 65 6.50
Ladura 980 11:58 AM 90 12:10 PM 65 6.50
Ladura 983 1:56 PM 95 2:05 PM 70 6.50
Shashi 985 3:15 PM 95 3:25 PM 70 6.50 26.00
Tapan 989 9:21 AM 135 9:25 AM 120 2.30
Tapan 994 11:20 AM 135 11:30 AM 110 1.00
Madan 992 10:48 AM 140 11:15 AM 115 6.00
Madan 995 12:08 PM 140 12:30 PM 105 3.00
Shashi 993 11:11 AM 140 11:30 AM 110 6.00
Madan 996 2:36 PM 145 2:55 PM 105 4.00
Shashi 998 4:18 PM 140 4:50 PM 100 6.00
Tapan 997 3:55 PM 90 4:05 PM 65 6.50
Ladura 999 5:25 PM 90 5:35 PM 70 6.50
Tapan 1001 6:06 PM 95 6:15 PM 75 6.50
Ladura 1003 6:56 PM 95 7:05 PM 80 6.50 26.00
Madan 1000 5:45 PM 145 6:05 PM 105 5.00
Ramcharan 1002 6:40 PM 140 7:10 PM 100 6.00
Ramcharan 1004 8:10 PM 140 8:35 PM 110 0.50
Shashi 1006 9:01 AM 145 9:30 AM 100 4.00
Tapan 1007 3:50 PM 140 4:15 PM 100 3.50
Ramcharan 1010 4:58 PM 145 5:20 PM 100 4.00
Tapan 1012 6:17 PM 140 6:25 PM 95 5.00
Ladura 1011 5:53 PM 90 6:05 PM 60 6.50
Ramcharan 1013 6:35 PM 90 6:45 PM 65 6.50
Madan 1014 7:07 PM 95 7:18 PM 75 7.00
Champu 1015 7:30 PM 95 7:40 PM 80 6.50 26.50
Ramcharan 1016 9:15 AM 145 9:35 AM 115 4.00
Tapan 1018 11:58 AM 140 12:25 PM 100 4.20
Madan 1021 2:33 PM 135 2:53 PM 95 0.50
Madan 1017 11:01 AM 145 11:25 AM 110 1.50
Ramcharan 1019 12:48 PM 145 1:15 PM 105 5.50
Shashi 1020 3:15 PM 140 3:45 PM 100 4.00
Tapan 1022 3:02 PM 150 3:40 PM 115 2.50
Ramcharan 1023 5:33 PM 140 5:55 PM 100 6.00
Madan 1026 6:55 PM 145 7:25 PM 105 1.00
Madan 1024 5:50 PM 85 6:00 PM 60 6.50
Shashi 1025 6:44 PM 90 6:55 PM 65 6.50
Champu 1027 7:07 PM 95 7:18 PM 80 7.00
Ramcharan 1028 7:30 PM 95 7:40 PM 85 6.50 26.50
Ramcharan 1030 2:35 PM 150 3:00 PM 110 6.50
Madan 1031 3:01 PM 145 3:20 PM 115 6.00
Shashi 1032 3:31 PM 140 3:50 PM 100 3.00
Champu 1033 5:22 PM 145 5:45 PM 105 6.50
Ramcharan 1037 6:52 PM 140 7:15 PM 110 4.00
Madan 1034 5:38 PM 145 6:10 PM 110 3.00
Shashi 1035 6:05 PM 140 6:25 PM 100 4.00
Ladura 1036 6:28 PM 85 6:00 PM 65 6.50
Champu 1038 7:16 PM 90 7:25 PM 75 6.50
Ladura 1039 7:48 PM 95 8:00 PM 85 6.50 19.50
Shashi 1041 5:45 PM 145 6:10 PM 100 6.00
Ramcharan 1042 6:05 PM 140 6:30 PM 95 6.00
Champu 1044 6:50 PM 145 7:15 PM 110 3.50
Ladura 1045 7:16 PM 85 7:25 PM 70 6.50
Ramcharan 1046 8:16 PM 90 8:25 PM 75 6.50
Madan 1047 7:07 PM 95 7:18 PM 80 6.50
Shashi 1048 11:03 PM 95 11:12 PM 85 6.50 26.00
Ramcharan 1049 8:45 AM 145 9:05 AM 120 2.00
Champu 1050 9:29 AM 145 9:55 AM 115 0.50
Madan 1051 10:37 AM 140 11:15 AM 105 6.50
Shashi 1053 11:29 AM 140 11:55 AM 105 6.00
Madan 1055 4:03 PM 135 4:18 PM 100 6.00
Ramcharan 1060 5:37 PM 140 5:50 PM 105 6.00
Ramcharan 1063 6:32 PM 140 6:44 PM 110 1.30
Champu 1057 4:26 PM 140 6:46 PM 100 6.00
Shashi 1059 5:08 PM 145 5:30 PM 100 5.50
Madan 1061 5:51 PM 135 6:15 PM 100 4.00
Ladura 1058 4:52 PM 85 5:00 PM 65 6.00
Champu 1062 6:23 PM 90 6:35 PM 75 6.00
Ladura 1064 6:55 PM 95 7:05 PM 80 6.50
Ramcharan 1066 7:29 PM 95 7:40 PM 85 6.50 25.00
Madan 1065 7:10 PM 135 7:15 PM 105 3.00
Champu 1068 11:41 AM 140 11:55 AM 105 6.00
Shashi 1069 12:03 PM 145 12:30 PM 105 4.00
Madan 1070 2:45 PM 165 4:15 PM 90 6.50
Champu 1071 3:15 PM 165 4:30 PM 110 6.50
Ramcharan 1072 3:34 PM 170 4:45 PM 125 6.50
Madan 1077 5:29 PM 175 6:45 PM 115 6.50
Ramcharan 1073 5:55 PM 170 6:15 PM 120 4.50
Shashi 1074 4:52 PM 145 5:20 PM 115 6.50
Shashi 1078 6:14 PM 140 6:35 PM 105 2.00
Ladura 1076 5:08 PM 85 5:20 PM 60 6.50
Champu 1079 7:05 PM 90 7:15 PM 75 6.50
Ladura 1080 7:25 PM 95 7:35 PM 75 6.50
Shashi 1081 7:56 PM 95 8:05 PM 80 6.00 25.50
Madan 1082 10:01 AM 145 10:20 AM 120 2.50
Ramcharan 1083 2:31 PM 145 2:40 PM 115 7.00
Champu 1084 2:52 PM 140 3:00 PM 105 7.00
Shashi 1085 3:12 PM 145 3:20 PM 110 7.00
Ramcharan 1086 3:32 PM 145 3:40 PM 110 7.00
Champu 1087 3:51 PM 140 4:00 PM 100 7.00
Champu 1091 5:01 PM 145 5:10 PM 115 1.00 36.00
Madan 1088 4:11 PM 90 4:20 PM 60 7.00
Shashi 1089 4:39 PM 90 4:50 PM 75 7.00
Ladura 1090 4:54 PM 95 5:05 PM 75 6.00
Ladura 1096 8:10 PM 95 8:20 PM 85 5.50 25.50
Ramcharan 1092 5:26 PM 145 5:45 PM 105 6.50
Madan 1093 6:30 PM 170 7:40 PM 115 1.50
Champu 1094 7:00 PM 150 7:20 PM 120 6.00
Ramcharan 1095 7:46 PM 150 8:10 PM 120 3.50
Champu 1098 9:50 AM 145 10:20 AM 95 2.00
Madan 1099 10:33 AM 145 10:50 AM 110 6.00
Ramcharan 1100 10:46 AM 140 11:05 AM 100 6.00
Champu 1101 11:33 AM 145 11:50 AM 110 4.25
Shashi 1102 12:21 PM 135 12:40 PM 100 1.00
Champu 1103 3:28 PM 145 3:40 PM 115 2.00
Champu 1105 5:00 PM 135 5:10 PM 95 3.00
Ramcharan 1106 5:36 PM 145 5:55 PM 100 6.00
Shashi 1107 6:03 PM 140 6:20 PM 100 6.00
Champu 1108 6:31 PM 135 6:50 PM 105 4.00
Ramcharan 1110 7:31 PM 140 7:50 PM 110 1.50
Ladura 1109 7:21 PM 90 7:30 PM 70 6.50
Madan 1111 7:52 PM 90 8:00 PM 75 6.50
Champu 1112 8:25 PM 100 8:35 PM 90 6.00
Shashi 1113 9:30 PM 100 9:40 PM 90 5.50
Ladura 1114 10:40 PM 105 10:50 PM 95 6.00 30.50
Ramcharan 1115 11:58 AM 145 12:25 PM 105 4.50
Madan 1116 3:50 PM 150 4:00 PM 110 5.00
Shashi 1117 4:07 PM 145 4:25 PM 105 4.00
Ramcharan 1118 4:54 PM 150 4:15 PM 105 3.50
Ladura 1119 5:38 PM 85 5:50 PM 60 6.50
Shashi 1120 5:59 PM 90 6:10 PM 65 6.50
Ramcharan 1121 6:20 PM 90 6:30 PM 70 6.50
Ladura 1124 7:35 PM 95 7:45 PM 85 5.50
Shashi 1125 8:52 PM 100 9:00 PM 90 1.50 26.50
Madan 1122 6:40 PM 135 7:00 PM 100 6.00
Ramcharan 1123 7:10 PM 140 7:30 PM 105 1.50 7.50
Ramcharan 1126 11:15 AM 150 11:35 AM 110 4.20
Champu 1127 7:35 PM 145 7:55 PM 115 6.50
Ladura 1128 7:58 PM 85 8:10 PM 75 6.50
Shashi 1129 8:23 PM 90 8:35 PM 80 7.00
Ramcharan 1130 9:43 PM 95 9:55 PM 85 7.00
Champu 1131 10:07 PM 100 10:15 PM 90 6.00 26.50
Madan 1132 9:23 AM 150 9:55 AM 120 6.00
Ramcharan 1133 10:55 AM 145 11:15 AM 110 2.00 8.00
Shashi 1134 4:22 PM 140 4:50 PM 105 6.00
Madan 1135 5:04 PM 140 5:25 PM 105 5.50
Ramcharan 1137 2:15 PM 135 2:35 PM 100 6.00
Ramcharan 1140 4:59 PM 140 5:25 PM 105 3.50
Madan 1138 2:56 PM 145 3:25 PM 100 6.00
Ladura 1139 4:41 PM 85 4:50 PM 65 5:30 PM 6.00
Ladura 1142 6:26 PM 90 6:35 PM 70 7:15 PM 6.50
Ramcharan 1143 7:30 PM 95 7:40 PM 75 8:25 PM 7.00
Ladura 1144 8:22 PM 100 8:35 PM 80 9:20 PM 6.50 26.00
Madan 1141 6:06 PM 145 6:25 PM 100 4.50
Ramcharan 1145 3:02 PM 150 3:35 PM 100 6.50
Shashi 1147 4:44 PM 140 5:10 PM 110 6.00
Champu 1148 5:05 PM 150 5:30 PM 105 6.50
Madan 1150 6:58 PM 150 7:25 PM 110 4.50
Ladura 1146 4:19 PM 85 4:30 PM 65 5:10 PM 6.50
Ladura 1149 6:14 PM 90 6:25 PM 70 7:15 PM 6.50
Shashi 1151 7:25 PM 95 7:35 PM 80 8:15 PM 7.00
Champu 1152 8:06 PM 100 8:15 PM 85 9:00 PM 6.50 26.50
Shashi 1153 11:13 AM 150 11:30 AM 115 6.00
Madan 1154 11:31 AM 145 11:50 AM 105 6.00
Ramcharan 1162 5:28 PM 150 5:50 PM 110 2.00
Champu 1156 12:36 PM 145 12:55 PM 100 2.00
Madan 1157 3:12 PM 150 3:35 PM 100 6.00
Ladura 1159 4:41 PM 85 4:50 PM 65 5:30 PM 6.50
Champu 1160 5:03 PM 85 5:15 PM 65 5:55 PM 6.50
Champu 1163 6:32 PM 95 6:45 PM 80 7:30 PM 6.50
Ladura 1164 7:53 PM 100 8:05 PM 85 8:45 PM 6.50 26.00
Shashi 1161 5:18 PM 140 5:45 PM 105 4.00
Ramcharan 1166 3:12 PM 145 3:45 PM 100 3.50
Champu 1167 3:36 PM 145 3:56 PM 105 6.00
Ramcharan 1168 8:30 PM 140 5:50 PM 110 5.00
Shashi 1170 9:21 PM 145 9:40 PM 115 4.00
Champu 1169 8:54 PM 90 9:05 PM 75 9:50 PM 6.00
Madan 1171 9:41 PM 95 9:50 PM 80 10:35 PM 7.00
Ladura 1172 10:08 PM 95 10:20 PM 80 11:00 PM 6.00
Ramcharan 1173 10:27 PM 100 10:40 PM 85 11:40 PM 6.50 25.50
Ramcharan 1174 8:59 AM 140 9:20 AM 115 4.50
Champu 1175 9:27 AM 145 9:50 AM 110 6.50
Madan 1176 9:58 AM 140 10:20 AM 105 4.00
Shashi 1177 11:34 AM 145 12:05 PM 105 3.50
Champu 1178 3:02 PM 140 3:35 PM 100 6.50
Ramcharan 1179 3:34 PM 140 4:15 PM 100 6.00
Madan 1180 3:49 PM 145 4:15 PM 105 3.50
Shashi 1181 4:33 PM 140 4:50 PM 100 3.50
Madan 1183 5:37 PM 145 6:00 PM 110 3.40
Champu 1184 6:10 PM 150 6:30 PM 115 3.50
Ladura 1182 5:17 PM 90 5:30 PM 70 6:10 PM 6.50
Shashi 1185 7:05 PM 95 7:15 PM 80 8:55 PM 6.50
Ladura 1186 7:31 PM 95 7:40 PM 80 8:20 PM 6.00
Ramcharan 1187 7:59 PM 100 8:10 PM 85 8:50 PM 6.00 25.00
Ramcharan 1188 9:27 AM 145 9:45 AM 120 0.50
Shashi 1189 11:26 AM 140 11:55 AM 105 3.50
Ramcharan 1190 3:32 PM 145 4:05 PM 100 6.50
Champu 1191 3:50 PM 150 4:25 PM 105 3.75
Shashi 1192 4:15 PM 150 4:35 PM 105 4.00
Ramcharan 1194 5:40 AM 145 6:00 AM 110 3.50
Shashi 1195 6:40 PM 150 7:00 PM 115 3.50
Champu 1197 7:20 PM 150 7:45 PM 115 6.50
Shashi 1198 8:24 PM 145 8:45 PM 110 3.50
Ladura 1193 5:28 PM 90 5:40 PM 65 6:20 PM 6.00
Ladura 1196 6:59 PM 95 7:10 PM 75 7:50 PM 6.00
Ramcharan 1198 7:45 PM 95 7:55 PM 80 8:40 PM 7.00
Ladura 1200 7:59 PM 100 8:10 PM 85 8:50 PM 6.00 25.00
Shashi 1202 2:32 PM 145 3:05 PM 100 3.50
Ramcharan 1203 3:07 PM 150 3:40 PM 105 6.50
Ladura 1205 3:38 PM 140 4:00 PM 100 4.50
Ladura 1207 4:59 PM 145 5:25 PM 110 5.00
Shashi 1209 5:59 PM 145 6:35 PM 100 6.50
Ramcharan 1211 7:07 PM 140 7:30 PM 100 7.00
Madan 1206 4:30 PM 90 4:40 PM 60 5:25 PM 6.00
Ramcharan 1208 5:27 PM 95 5:40 PM 70 6:20 PM 6.00
Madan 1210 6:35 PM 95 6:45 PM 75 7:30 PM 7.00
Shashi 1212 8:24 PM 100 8:35 PM 85 9:15 PM 6.50 25.50
155 100 6.00
Madan 1215 12:55 PM 145 1:05 PM 110 6.00
Champu 1218 1:51 PM 145 2:00 PM 110 6.00
Ramcharan 1222 3:25 PM 140 3:35 PM 105 4.00
Ramcharan 1217 1:25 PM 145 1:55 PM 100 6.00
Shashi 1219 2:21 PM 145 2:55 PM 100 3.25
Shashi 1219 2:21 PM 145 2:55 PM 100 3.25
Madan 1220 4:42 PM 145 2:55 PM 105 6.50
Ladura 1221 3:07 PM 90 3:20 PM 60 4:00 PM 6.50
Ladura 1226 5:26 PM 95 5:35 PM 65 6:20 PM 6.00
Ladura 1232 8:28 PM 95 8:40 PM 75 9:25 PM 6.50
Ladura 1233 10:03 PM 100 10:15 PM 85 11:00 PM 6.50 25.50
Champu 1223 3:55 PM 165 5:15 PM 115 5:35 PM 6.00
Ramcharan 1224 4:37 PM 160 5:45 PM 120 6:05 PM 6.00
Madan 1225 5:10 PM 165 6:15 PM 120 6:35 PM 6.00
Champu 1228 6:39 PM 165 7:35 PM 125 7:55 PM 6.00
Ramcharan 1229 7:03 PM 170 7:55 PM 125 8:20 PM 6.00 30.00
Shashi 1227 6:20 PM 145 6:55 PM 105 6.50
Madan 1231 7:56 PM 145 7:25 PM 110 3.50
Champu 1234 10:49 PM 150 11:15 PM 120 3.50
Champu 1235 11:57 PM 150 12:15 AM 125 0.50
Prahlad 1238 2:21 PM 145 2:55 PM 100 6.00
Madan 1239 7:56 PM 140 7:25 PM 95 6.00
Ladura 1240 5:26 PM 95 5:35 PM 65 6:20 PM 6.00
Champu 1244 8:28 PM 95 8:40 PM 75 9:25 PM 7.00 13.00
Ladura 1241 7:07 PM 145 7:30 PM 105 6.00
Madan 1243 7:07 PM 150 7:30 PM 110 1.50
Ramcharan 1242 2:21 PM 150 2:55 PM 115 4.00
Gopal 1245 9:31 AM 150 9:40 AM 120 4.50
Champu 1246 9:57 AM 150 10:30 AM 115 5.50
Gopal 1247 11:51 AM 145 12:20 PM 110 6.00
Champu 1248 12:32 PM 150 1:00 PM 115 3.20
Champu 1248 12:32 PM 150 1:00 PM 115 3.00
Gopal 1250 2:57 PM 145 3:20 PM 105 6.00
Champu 1251 3:36 PM 140 3:55 PM 100 6.00
Ladura 1252 5:09 PM 145 5:30 PM 110 6.50
Gopal 1253 5:34 PM 145 5:55 PM 115 6.50
Champu 1254 5:56 PM 145 6:15 PM 115 6.50
Gopal 1256 7:12 PM 150 7:35 PM 120 5.75 25.25
Ladura 1255 6:37 PM 150 7:00 PM 115 6.50
Champu 1257 9:17 AM 150 9:50 AM 110 3.50
Ladura 1258 9:56 AM 150 10:30 AM 105 6.00
Ladura 1259 12:11 PM 145 12:30 PM 100 6.00
Ramcharan 1261 2:59 PM 150 12:20 PM 110 6.50
Ladura 1262 3:42 PM 145 4:05 PM 100 3.25
Ladura 1262 3:42 PM 145 4:05 PM 100 3.25
Champu 1263 4:28 PM 150 5:00 AM 105 3.25
Champu 1263 4:28 PM 150 5:00 AM 105 3.25
Ramcharan 1264 5:36 PM 150 5:55 PM 105 6.00
Ladura 1265 6:43 PM 155 7:00 PM 110 6.00
Champu 1266 7:20 PM 155 7:40 PM 115 3.50
Ramcharan 1267 8:54 AM 150 9:15 AM 115 6.50
Madan 1268 9:19 AM 150 9:50 AM 110 6.00
Champu 1269 2:37 PM 145 3:10 PM 95 6.50
Madan 1272 4:29 PM 150 4:50 PM 105 3.00
Ramcharan 1273 4:50 PM 150 5:15 PM 105 3.75
Ladura 1271 4:02 PM 90 4:10 PM 60 4:50 PM 6.50
Champu 1274 5:23 PM 90 5:35 PM 65 6:20 PM 6.50
Ladura 1275 5:43 PM 95 5:55 PM 75 6:35 PM 6.00
Champu 1277 7:04 PM 100 7:15 PM 85 8:00 PM 6.75
Ladura 10:03 PM 100 10:15 PM 90 11:00 PM 0.50 26.25
Madan 1276 6:44 PM 150 7:05 PM 110 4.00
Ramcharan 1278 8:24 PM 155 8:45 PM 120 3.50
Madan 1279 9:51 AM 150 10:20 AM 105 4.50
Champu 1280 2:50 PM 145 3:00 PM 120 6.00
Champu 1286 5:37 PM 150 5:45 PM 125 4.00
Ladura 1282 3:28 PM 145 3:35 PM 120 2.00
Madan 1283 3:52 PM 145 4:25 PM 105 6.00
Ladura 1285 4:51 PM 145 5:20 PM 105 2.50
Ramcharan 1284 4:40 PM 150 5:00 PM 110 3.80
Ramcharan 1287 5:59 PM 150 6:20 PM 110 5.40
Madan 1288 9:54 AM 155 10:20 AM 120 6.00
Ramcharan 1289 10:36 AM 155 11:10 AM 105 6.00
Ladura 1291 11:38 AM 145 12:10 PM 100 3.00
Champu 1290 10:54 AM 150 11:15 AM 110 6.00
Madan 1292 2:04 PM 145 2:25 PM 100 3.00
Ramcharan 1293 2:19 PM 150 2:40 PM 100 3.00
Champu 1294 3:25 PM 150 3:55 PM 95 6.00
Ramcharan 1297 4:08 PM 155 4:45 PM 100 3.50
Madan 1299 5:47 PM 155 6:10 PM 110 3.80
Champu 1300 6:45 PM 150 6:50 PM 110 6.00
Ladura 1295 3:43 PM 90 3:55 PM 60 4:40 PM 6.50
Ladura 1298 5:18 PM 95 5:30 PM 70 6:10 PM 6.50
Ladura 1301 7:06 PM 95 7:15 PM 80 8:00 PM 6.00
Ladura 1302 7:25 PM 100 7:35 PM 85 8:15 PM 6.75 25.75
Cum. Qty.
in M3
Remarks

3.00
9.00
15.00
21.00
27.50
30.00
33.00
36.25
42.25
49.25
54.25
60.75
66.75
70.75
73.75
80.25
86.75
93.25
99.75
102.05
103.05
109.05
112.05
118.05
122.05
128.05
134.55
141.05
147.55
154.05
159.05
165.05
165.55
169.55
173.05
177.05
182.05
188.55
195.05
202.05
208.55
212.55
216.75
217.25
218.75
224.25
228.25
230.75
236.75
237.75
244.25
250.75
257.75
264.25
270.75
276.75
279.75
286.25
290.25
293.25
297.25
303.75
310.25
316.75
322.75
328.75
332.25
338.75
345.25
351.75
358.25
360.25
360.75
367.25
373.25
379.25
385.25
386.55
392.55
398.05
402.05
408.05
414.05
420.55
427.05
430.05
436.05
440.05
446.55
453.05
459.55
466.05
470.55
477.05
479.05
485.55
492.05
498.55
504.55
507.05
514.05
521.05
528.05
535.05
542.05
543.05
550.05
557.05
563.05
568.55
575.05
576.55
582.55
586.05
588.05
594.05
600.05
604.30
605.30
607.30
610.30
616.30
622.30
626.30
627.80
634.30
640.80
646.80
652.30
658.30
662.80
667.80
671.80
675.30
681.80
688.30
694.80
700.30
701.80
707.80
709.30
713.50
720.00
726.50
733.50
740.50
746.50
752.50
754.50
760.50
766.00
772.00
775.50
781.50
787.50
794.00
801.00
807.50
812.00
818.50
824.50
831.00
835.50
842.00
848.50
855.50
862.00
868.00
874.00
876.00
878.00
884.00
890.50
897.00
903.50
910.00
914.00
917.50
923.50
928.50
932.50
938.50
945.50
951.50
958.00
962.50
969.00
973.00
976.50
983.00
989.00
992.50
996.00
999.40
1002.90
1009.40
1015.90
1021.90
1027.90
1028.40
1031.90
1038.40
1042.15
1046.15
1049.65
1053.15
1059.65
1063.15
1069.15
1075.15
1082.15
1088.15
1091.65
1098.15
1102.65
1107.65
1114.15
1121.15
1127.15
1133.15
1140.15
1146.65
1152.65
1158.65
1164.65
1168.65
1174.65
1177.90
1181.15
1187.65
1194.15
1200.15
1206.65
1213.15
1219.15
1225.15
1231.15
1237.15
1243.15
1249.65
1253.15
1256.65
1257.15
1263.15
1269.15
1275.15
1282.15
1288.15
1289.65
1293.65
1298.15
1303.65
1309.65
1312.85
1315.85
1321.85
1327.85
1334.35
1340.85
1347.35
1353.10
1359.60
1363.10
1369.10
1375.10
1381.60
1384.85
1388.10
1391.35
1394.60
1400.60
1406.60
1410.10
1416.60
1422.60
1429.10
1432.10
1435.85
1442.35
1448.85
1454.85
1461.60
1462.10
1466.10
1469.60
1474.10
1480.10
1484.10
1486.10
1492.10
1494.60
1498.40
1503.80
1509.80
1515.80
1518.80
1524.80
1527.80
1530.80
1536.80
1540.30
1544.10
1550.10
1556.60
1563.10
1569.10
1575.85
1575.85
1575.85
Concrete Details Mont
Sr. Grade of
Date Location Chainage Side Name of Structure Vehicle No
no Concrete

1 01 February 18 VUP 239+050 LHS A1PIer Padastal M-40 5305


2 01 February 18 256+700 to 256+720 LHS Drain Slab M-25 658
3 01 February 18 243+340 to 243+360 LHS Drain Slab M-25 1028
4 01 February 18 241+490 to 241+520 RHS Drain Wall M-25 3115
5 01 February 18 241+490 to 241+520 RHS Drain Wall M-25 5305
6 01 February 18 251+990 to 252+010 RHS Drain Raft M-25 5305
7 01 February 18 YARD 251+950 RHS RE Panal M-35 658
5 01 February 18 YARD 251+950 RHS RE Panal M-35 1028
6 01 February 18 YARD 251+950 RHS RE Panal M-35 1028
7 01 February 18 YARD 251+950 RHS RE Panal M-35 3115
8 02 February 18 256+700 to 256+720 LHS Drain Slab M-25 658
9 02 February 18 256+820 to 256+840 LHS Drain Raft M-25 3115
10 02 February 18 256+760 to 256+780 RHS Drain Wall M-25 1028
11 02 February 18 241+330 to 241+350 RHS Drain Wall M-25 5305
12 02 February 18 256+720 to 256+730 LHS Drain Slab M-25 658
13 02 February 18 256+740 to 256+760 LHS Drain Wall M-25 3115
14 02 February 18 256+740 to 256+760 LHS Drain Wall M-25 1028
15 02 February 18 256+840 to 256+860 RHS Drain PCC M-15 1028
16 02 February 18 241+330 to 241+350 RHS Drain Wall M-25 5305
17 02 February 18 241+330 to 241+350 RHS Drain Wall M-25 3115
18 02 February 18 241+250 to 241+310 RHS Drain PCC M-15 1028
19 02 February 18 243+320 to 243+340 LHS Drain Slab M-25 658
20 02 February 18 256+700 to 256+720 RHS Drain Slab M-25 5305
21 02 February 18 YARD 251+950 RHS RE Panal M-35 658
22 02 February 18 YARD 251+950 RHS RE Panal M-35 1028
23 02 February 18 YARD 251+950 RHS RE Panal M-35 5305
24 02 February 18 YARD 251+950 RHS RE Panal M-35 658
25 03 February 18 250+430 to 250+440 RHS Drain Wall M-25 3115
26 03 February 18 241+540 to 241+570 RHS Drain Wall M-25 658
27 03 February 18 241+540 to 241+570 RHS Drain Wall M-25 1028
28 03 February 18 MNRB 252+960 RHS SLAB M-30 5305
29 03 February 18 MNRB 252+960 RHS SLAB M-30 3115
30 03 February 18 MNRB 252+960 RHS SLAB M-30 5305
31 03 February 18 MNRB 252+960 RHS SLAB M-30 3115
32 03 February 18 MNRB 252+960 RHS SLAB M-30 5305
33 03 February 18 MNRB 252+960 RHS SLAB M-30 3115
34 03 February 18 MNRB 252+960 RHS SLAB M-30 3115
35 03 February 18 256+430 to 256+440 LHS Drain Slab M-25 658
36 03 February 18 256+670 to 256+680 LHS Drain Slab M-25 658
37 03 February 18 YARD 251+950 RHS RE Panal M-35 1028
38 03 February 18 YARD 251+950 RHS RE Panal M-35 1028
39 03 February 18 YARD 251+950 RHS RE Panal M-35 658
40 03 February 18 YARD 251+950 RHS RE Panal M-35 658
41 04 February 18 256+780 to 256+800 RHS Drain Wall M-25 5305
42 04 February 18 256+740 to 256+760 LHS Drain Slab M-25 3115
43 04 February 18 256+690 to 256+710 RHS Drain Slab M-25 1028
44 04 February 18 241+450 to 241+460 RHS Drain Slab M-25 658
45 04 February 18 241+560 to 241+590 RHS Drain Wall M-25 3115
46 04 February 18 241+560 to 241+590 RHS Drain Wall M-25 5305
47 04 February 18 250+670 to 250+680 RHS Drain Slab M-25 658
48 04 February 18 243+320 to 243+300 RHS Drain Slab M-25 658
49 04 February 18 YARD 251+950 RHS RE Panal M-35 1028
50 04 February 18 YARD 251+950 RHS RE Panal M-35 3115
51 04 February 18 YARD 251+950 RHS RE Panal M-35 658
52 04 February 18 YARD 251+950 RHS RE Panal M-35 5305
53 05 February 18 256+760 to 256+770 LHS Drain Wall M-25 1028
54 05 February 18 256+760 to 256+770 LHS Drain Wall M-25 3115
55 05 February 18 Box Culvert 257+700 LHS WALL 1st Lift M-30 658
56 05 February 18 Box Culvert 257+700 LHS WALL 1st Lift M-30 658
57 05 February 18 241+590 to 241+620 RHS Drain Wall M-25 5305
58 05 February 18 241+590 to 241+620 RHS Drain Wall M-25 1028
59 05 February 18 HPC 263+700 LHS PCC M-15 3115
60 05 February 18 251+900 to 251+910 RHS Drain Wall M-25 2649
61 05 February 18 256+870 to 256+920 LHS Drain PCC M-15 5305
62 05 February 18 256+740 to 256+760 LHS Drain Slab M-25 658
63 05 February 18 YARD 251+950 RHS RE Panal M-35 3115
64 05 February 18 YARD 251+950 RHS RE Panal M-35 2649
65 05 February 18 YARD 251+950 RHS RE Panal M-35 658
66 05 February 18 YARD 251+950 RHS RE Panal M-35 5305
67 06 February 18 256+820 to 256+840 RHS Drain Raft M-25 3115
68 06 February 18 250+430 to 250+440 RHS Drain Slab M-25 658
69 06 February 18 243+290 to 243+310 LHS Drain Wall M-25 658
70 06 February 18 251+910 to 251+920 RHS Drain Wall M-25 2649
71 06 February 18 256+780 to 256+790 LHS Drain Wall M-25 5305
72 06 February 18 HPC 263+700 RHS PCC M-15 3115
73 06 February 18 241+310 to 241+340 RHS Drain Raft M-25 658
74 06 February 18 256+740 to 256+750 LHS Drain Slab M-25 3115
75 06 February 18 YARD 251+950 RHS RE Panal M-35 2649
76 06 February 18 YARD 251+950 RHS RE Panal M-35 5305
77 06 February 18 YARD 251+950 RHS RE Panal M-35 1028
78 06 February 18 YARD 251+950 RHS RE Panal M-35 5305
79 07 February 18 HPC 263+700 LHS Head Wall 1st Lift & M-20 5305
80 07 February 18 HPC 263+700 RHS Chamber Raft M-20 658
81 07 February 18 241+460 to 241+480 RHS Drain Slab M-25 658
82 07 February 18 241+460 to 241+480 RHS Drain Slab M-25 1028
83 07 February 18 256+800 R/S -256+460 R/S Drain PCC M-15 3115
84 07 February 18 241+620 to 241+640 RHS Drain Wall M-25 1028
85 07 February 18 251+930 to 251+940 RHS Drain Wall M-25 3115
86 07 February 18 251+940 to 251+960 RHS Drain PCC M-15 3115
87 07 February 18 256+920 to 256+980 LHS Drain PCC M-15 5305
88 07 February 18 256+800 to 256+820 LHS Drain Slab M-25 1028
89 07 February 18 YARD 251+950 RHS RE Panal M-35 2649
90 07 February 18 YARD 251+950 RHS RE Panal M-35 5305
91 07 February 18 YARD 251+950 RHS RE Panal M-35 3115
92 07 February 18 YARD 251+950 RHS RE Panal M-35 658
93 08 February 18 256+860 to 256+880 RHS Drain Raft M-25 658
94 08 February 18 256+780 to 256+800 LHS Drain Wall M-25 1028
95 08 February 18 256+800 to 256+820 RHS Drain Wall/Slab M-25 1028
96 08 February 18 256+800 to 256+820 RHS Drain Wall/Slab M-25 3115
97 08 February 18 251+930 to 251+940 RHS Drain Wall/Slab M-25 658
98 08 February 18 YARD 251+950 RHS RE Panal M-35 5305
99 08 February 18 241+490 to 241+500 RHS Drain Slab M-25 1028
100 09 February 18 HPC 263+700 RHS Head Wall 2nd Lift M-20 3115
101 09 February 18 HPC 263+700 LHS Head Wall 2nd Lift M-20 1028
102 09 February 18 250+780 to 250+790 RHS Drain Wall M-25 5305
103 09 February 18 241+490 to 241+500 RHS Drain Wall M-25 1028
104 09 February 18 243+300 to 243+320 LHS Drain Slab M-25 3115
105 09 February 18 256+910 to 256+950 LHS Drain Raft M-25 5305
106 09 February 18 256+920 to 256+950 LHS Drain Raft M-25 5305
107 09 February 18 251+940 to 251+950 RHS Drain Wall/Slab M-25 3115
108 09 February 18 256+840 to 256+860 RHS Drain Raft M-25 5305
109 09 February 18 HPC 257+700 RHS RT. Wall PCC M-15 658
110 09 February 18 241+500 to 241+520 RHS Drain Slab M-25 3115
111 09 February 18 257+040 to 257+100 LHS Drain PCC M-15 5305
112 09 February 18 YARD 251+950 RHS RE Panal M-35 658
113 09 February 18 YARD 251+950 RHS RE Panal M-35 658
114 09 February 18 YARD 251+950 RHS RE Panal M-35 658
115 09 February 18 YARD 251+950 RHS RE Panal M-35 1028
116 10 February 18 241+920 to 241+930 RHS Drain Raft M-25 3115
117 10 February 18 Box Culvert 258+060 LHS PCC M-15 658
118 10 February 18 241+635 to 241+655 RHS Drain Wall M-25 3115
119 10 February 18 256+800 to 256+810 RHS Drain Wall M-25 5305
120 10 February 18 257+080 to 257+160 LHS Drain PCC M-15 658
121 10 February 18 HPC 263+700 RHS Head Wall 3rd Lift M-20 5305
122 10 February 18 241+515 to 241+530 RHS Drain Slab M-25 658
123 10 February 18 YARD 251+950 RHS RE Panal M-35 3115
124 10 February 18 YARD 251+950 RHS RE Panal M-35 3115
125 10 February 18 YARD 251+950 RHS RE Panal M-35 5305
126 10 February 18 YARD 251+950 RHS RE Panal M-35 3115
127 11 February 18 251+960 to 251+970 RHS Drain Wall M-25 1028
128 11 February 18 251+980 to 251+990 RHS Drain Raft M-25 1028
129 11 February 18 HPC 257+700 RHS PCC M-15 658
130 11 February 18 256+790 to 256+800 RHS Drain Slab M-25 5305
131 11 February 18 243+240 to 243+200 RHS Drain PCC M-15 3115
132 11 February 18 257+040 to 257+060 LHS Drain Raft M-25 658
133 11 February 18 250+800 to 250+810 RHS Drain Raft M-25 5305
134 11 February 18 257+000 to 257+010 LHS Drain PCC M-15 658
135 11 February 18 251+980 to 251+990 RHS Drain Raft M-25 1028
136 11 February 18 256+560 to 256+580 LHS Drain Slab M-25 3115
137 11 February 18 256+800 to 256+820 LHS Drain Wall M-25 5305
138 11 February 18 256+870 to 256+920 LHS Drain PCC M-15 1028
139 11 February 18 241+530 to 241+540 RHS Drain Slab M-25 658
140 11 February 18 YARD 251+950 RHS RE Panal M-35 2649
141 11 February 18 YARD 251+950 RHS RE Panal M-35 3115
142 11 February 18 YARD 251+950 RHS RE Panal M-35 2649
143 11 February 18 YARD 251+950 RHS RE Panal M-35 658
144 11 February 18 256+830 to 256+840 LHS Drain Wall M-25 5305
145 12 February 18 250+740 to 250+750 RHS Drain Raft M-25 5305
146 12 February 18 HPC 263+700 RHS Head Wall Final Lift M-20 3115
147 12 February 18 241+250 to 241+270 RHS Drain Wall M-25 3115
148 12 February 18 241+240 to 241+250 RHS Drain Slab M-25 1028
149 12 February 18 256+460 to 256+470 LHS Drain Slab M-25 5305
150 12 February 18 256+800 to 256+810 LHS Drain Slab M-25 1028
151 12 February 18 YARD 251+950 RHS RE Panal M-35 2649
152 12 February 18 YARD 251+950 RHS RE Panal M-35 3115
153 12 February 18 YARD 251+950 RHS RE Panal M-35 2649
154 12 February 18 YARD 251+950 RHS RE Panal M-35 1028
155 13 February 18 251+900 to 251+910 RHS Drain Wall M-25 3115
156 13 February 18 251+980 to 251+990 RHS Drain Slab M-25 3115
157 13 February 18 256+860 to 256+880 LHS Drain Raft M-25 1028
158 13 February 18 257+130 to 257+160 LHS Drain PCC M-15 658
159 13 February 18 257+010 to 257+040 LHS Drain PCC M-15 3115
160 13 February 18 243+260 to 243+270 LHS Drain Wall M-15 658
161 13 February 18 241+270 to 241+290 RHS Drain Wall M-25 1028
162 13 February 18 Box Culvert 257+700 RHS Retein Wall RAFT M-30 3115
163 13 February 18 YARD 251+950 RHS RE Panal M-35 2649
164 13 February 18 YARD 251+950 RHS RE Panal M-35 5305
165 14 February 18 Box Culvert 257+700 RHS Retein Wall RAFT M-30 658
166 14 February 18 250+790 to 250+800 RHS Drain Raft M-25 3115
167 14 February 18 250+460 to 250+470 RHS Drain Wall M-25 3115
168 14 February 18 YARD 251+950 RHS RE Panal M-35 1028
169 14 February 18 YARD 251+950 RHS RE Panal M-35 5305
170 14 February 18 YARD 251+950 RHS RE Panal M-35 1028
171 14 February 18 YARD 251+950 RHS RE Panal M-35 1028
172 14 February 18 257+080 to 257+040 LHS Drain PCC M-15 658
173 14 February 18 243+220 to 243+240 LHS Drain Raft M-25 5305
174 14 February 18 251+920 to 251+930 RHS Drain Slab M-25 658
175 14 February 18 251+960 to 251+970 RHS Drain Wall M-25 658
176 14 February 18 241+290 to 241+305 RHS Drain Wall M-25 1028
177 14 February 18 256+780 to 256+760 LHS Drain Slab M-25 5305
178 14 February 18 257+060 to 257+080 LHS Drain Raft M-25 1028
179 14 February 18 241+560 to 241+570 RHS Drain Slab M-25 658
180 14 February 18 256+810 to 256+820 LHS Drain Slab M-25 3115
181 14 February 18 256+840 to 256+860 LHS Drain Wall M-25 5305
182 15 February 18 Box Culvert 257+700 RHS Rtn. Wall 1st Lift M-30 1028
183 15 February 18 Box Culvert 257+700 RHS Rtn. Wall 1st Lift M-30 5305
184 15 February 18 256+560 to 256+900 RHS Drain Raft M-25 3115
185 15 February 18 241+575 to 241+587 RHS Drain Wall M-25 5305
186 15 February 18 241+305 to 241+311 RHS Drain Slab M-25 5305
187 15 February 18 252+190 252+207 RHS Drain PCC M-15 658
188 15 February 18 YARD 251+950 RHS RE Panal M-35 3115
189 15 February 18 YARD 251+950 RHS RE Panal M-35 1028
190 15 February 18 YARD 251+950 RHS RE Panal M-35 1028
191 15 February 18 YARD 251+950 RHS RE Panal M-35 1028
192 16 February 18 250+740 250+760 RHS Drain Wall M-25 3115
193 16 February 18 252+190 252+207 RHS Drain PCC M-15 658
194 16 February 18 Box Culvert 252+540 RHS Wall 1st Lift M-30 3115
195 18 February 18 251+760 to 251+830 LHS Drain PCC M-15 3115
196 18 February 18 251+760 to 251+830 LHS Drain PCC M-15 658
197 18 February 18 251+930 to 251+950 RHS Drain Slab M-25 2649
198 18 February 18 251+890 & 251+920 RHS Drain Wall M-25 1028
199 18 February 18 256+800 to 256+810 LHS Drain Slab M-25 3115
200 18 February 18 241+587 to 241+610 RHS Drain Slab M-25 658
201 18 February 18 241+587 to 241+610 RHS Drain Slab M-25 3115
202 18 February 18 256+820 to 256+840 LHS Drain Wall M-25 1028
203 18 February 18 256+960 to 256+980 LHS Drain Raft M-25 658
204 18 February 18 243+260 to 243+230 RHS Drain Raft M-25 3115
205 18 February 18 256+850 to 256+870 RHS Drain Wall M-25 658
206 18 February 18 256+840 to 256+850 RHS Drain Slab M-25 3115
207 18 February 18 YARD 251+950 RHS RE Panal M-35 2649
208 18 February 18 YARD 251+950 RHS RE Panal M-35 2649
209 18 February 18 YARD 251+950 RHS RE Panal M-35 2649
210 18 February 18 YARD 251+950 RHS RE Panal M-35 1028
211 19 February 18 252+190 252+220 RHS Drain Raft M-25 658
212 19 February 18 252+190 252+220 RHS Drain Raft M-25 658
213 19 February 18 Box Culvert 257+700 LHS Wall/Slab M-30 1028
214 19 February 18 Box Culvert 257+700 LHS Wall/Slab M-30 5305
215 19 February 18 Box Culvert 257+700 LHS Wall/Slab M-30 3115
216 19 February 18 Box Culvert 257+700 LHS Wall/Slab M-30 1028
217 19 February 18 Box Culvert 257+700 LHS Wall/Slab M-30 5305
218 19 February 18 256+980 to 257+000 LHS Drain Raft M-25 658
219 19 February 18 241+610 & 241+268 RHS Drain Slab M-25 3115
220 19 February 18 257+000 to 257+020 LHS Drain Raft M-25 5305
221 19 February 18 251+820 to 251+840 LHS Drain Raft M-25 1028
222 19 February 18 YARD 251+950 RHS RE Panal M-35 658
223 19 February 18 YARD 251+950 RHS RE Panal M-35 2649
224 19 February 18 YARD 251+950 RHS RE Panal M-35 658
225 19 February 18 YARD 251+950 RHS RE Panal M-35 5305
226 20 February 18 252+220 252+250 RHS Drain Raft M-25 3115
227 20 February 18 257+020 to 257+040 LHS Drain Raft M-25 1028
228 20 February 18 251+890 to 251+900 RHS Drain Wall M-25 3115
229 20 February 18 251+890 to 251+900 RHS Drain Wall M-25 658
230 20 February 18 256+870 to 256+890 RHS Drain Wall M-25 658
231 20 February 18 256+850 to 256+860 RHS Drain Slab M-25 1028
232 20 February 18 241+280 & 241+625 RHS Drain Slab M-25 3115
233 20 February 18 251+800 to 251+820 LHS Drain Raft M-25 5305
234 20 February 18 Box Culvert 257+700 RHS Wall- 2nd Lift M-30 1028
235 20 February 18 256+850 to 256+860 LHS Drain Wall M-25 658
236 20 February 18 251+920 to 251+930 RHS Drain Slab M-25 3115
237 20 February 18 257+100 to 257+130 LHS Drain Raft M-25 3115
238 20 February 18 YARD 251+950 RHS RE Panal M-35 658
239 20 February 18 YARD 251+950 RHS RE Panal M-35 658
240 20 February 18 YARD 251+950 RHS RE Panal M-35 1028
241 20 February 18 YARD 251+950 RHS RE Panal M-35 3115
242 21 February 18 252+250 to 252+270 RHS Drain Raft M-25 3115
243 21 February 18 256+850 to 256+860 RHS Drain Wall M-25 1028
244 21 February 18 257+130 to 257+160 LHS Drain Raft M-25 3115
245 21 February 18 241+640 to 241+656 RHS Drain Wall M-25 1028
246 21 February 18 241+310 to 241+290 RHS Drain Slab M-25 658
247 21 February 18 243+290 to 243+310 LHS Drain Slab M-25 3115
248 21 February 18 251+780 to 251+800 LHS Drain Raft M-25 658
249 21 February 18 250+740 to 250+760 RHS Drain Slab M-25 3115
250 21 February 18 256+860 to 256+880 RHS Drain Wall M-25 658
251 21 February 18 YARD 251+950 RHS RE Panal M-35 1028
252 21 February 18 YARD 251+950 RHS RE Panal M-35 658
253 21 February 18 YARD 251+950 RHS RE Panal M-35 1028
254 21 February 18 YARD 251+950 RHS RE Panal M-35 3115
255 22 February 18 251+820 to 251+850 RHS Drain PCC M-15 658
256 22 February 18 241+310 & 250+740 RHS Drain Slab M-25 3115
257 22 February 18 YARD 251+950 RHS RE Panal M-35 658
258 22 February 18 YARD 251+950 RHS RE Panal M-35 658
259 22 February 18 YARD 251+950 RHS RE Panal M-35 658
260 22 February 18 YARD 251+950 RHS RE Panal M-35 658
261 22 February 18 256+890 to 256+900 RHS Drain Wall M-25 3115
262 22 February 18 251+820 to 251+850 RHS Drain PCC M-15 1028
263 22 February 18 251+820 to 251+850 RHS Drain Raft M-25 3115
264 23 February 18 252+190 to 252+210 RHS Drain Wall M-25 5305
265 23 February 18 252+190 to 252+210 RHS Drain Wall M-25 5305
266 23 February 18 252+190 to 252+210 RHS Drain Wall M-25 658
267 23 February 18 256+900 to 256+920 RHS Drain Raft M-25 1028
268 23 February 18 243+264 to 243+240 LHS Drain Wall M-25 3115
269 23 February 18 251+960 to 251+970 LHS Drain Slab M-25 658
270 23 February 18 Box Culvert 257+700 RHS Wall- 2nd Lift M-30 658
271 23 February 18 256+810 to 256+820 LHS Drain Slab M-25 1028
272 23 February 18 251+970 to 252+010 LHS Drain PCC M-15 3115
273 23 February 18 257+140 to 257+160 LHS Drain Wall M-25 5305
274 23 February 18 251+820 to 251+830 LHS Drain Wall M-25 1028
275 23 February 18 256+870 to 256+880 RHS Drain Slab M-25 658
276 23 February 18 251+850 to 251+880 RHS Drain PCC M-15 3115
277 23 February 18 YARD 251+950 RHS RE Panal M-35 2649
278 23 February 18 YARD 251+950 RHS RE Panal M-35 658
279 23 February 18 YARD 251+950 RHS RE Panal M-35 1028
280 23 February 18 YARD 251+950 RHS RE Panal M-35 2649
281 24 February 18 250+800 to 250+810 RHS Drain Slab M-25 658
282 24 February 18 256+900 to 256+920 RHS Drain Wall M-25 1028
283 24 February 18 257+170 to 257+220 LHS Drain PCC M-15 5305
284 24 February 18 252+970 to 251+990 LHS Drain Raft M-25 658
285 24 February 18 YARD 251+950 RHS RE Panal M-35 3115
286 24 February 18 YARD 251+950 RHS RE Panal M-35 3115
287 24 February 18 YARD 251+950 RHS RE Panal M-35 5305
288 24 February 18 YARD 251+950 RHS RE Panal M-35 3115
289 24 February 18 257+120 to 257+140 LHS Drain Wall M-25 658
290 25 February 18 256+890 to 256+900 RHS Drain Slab M-25 1028
291 25 February 18 256+820 to 256+840 LHS Drain Slab M-25 658
292 25 February 18 251+940 to 251+960 LHS Drain PCC M-15 1028
293 25 February 18 257+120 to 257+130 LHS Drain Wall M-25 3115
294 25 February 18 251+990 to 252+010 LHS Drain Raft M-25 658
295 25 February 18 251+820 to 251+850 RHS Drain Raft M-25 5305
296 25 February 18 YARD 251+950 RHS RE Panal M-35 5305
297 25 February 18 YARD 251+950 RHS RE Panal M-35 1028
298 25 February 18 YARD 251+950 RHS RE Panal M-35 658
299 25 February 18 YARD 251+950 RHS RE Panal M-35 3115
300 26 February 18 251+810 to 251+820 LHS Drain Wall M-25 1028
301 26 February 18 257+ to 257+ LHS Drain Wall M-25 3115
302 27 February 18 251+ to 251+ LHS Drain Raft M-25 658
303 27 February 18 257+ to 257+ LHS Drain PCC M-15 658
304 27 February 18 YARD 251+950 RHS RE Panal M-35 3115
305 27 February 18 YARD 251+950 RHS RE Panal M-35 1028
306 27 February 18 YARD 251+950 RHS RE Panal M-35 5305
307 27 February 18 YARD 251+950 RHS RE Panal M-35 3115
308 27 February 18 257+180 to 257+200 LHS Drain Raft M-25 658
309 27 February 18 257+180 to 257+200 LHS Drain Raft M-25 1028
310 28 February 18 YARD 251+950 RHS RE Panal M-35 5305
311 28 February 18 YARD 251+950 RHS RE Panal M-35 3115
312 28 February 18 YARD 251+950 RHS RE Panal M-35 5305
313 28 February 18 YARD 251+950 RHS RE Panal M-35 3115
314 28 February 18 257+080 to 257+100 LHS Drain Wall M-25 1028
315 28 February 18 257+180 to 257+200 LHS Drain Wall M-25 1028
316 28 February 18 Box Culvert 252+570 RHS Wall & Slab M-30 658
317 28 February 18 Box Culvert 252+570 RHS Wall & Slab M-30 658
318 28 February 18 Box Culvert 252+570 RHS Wall & Slab M-30 5305
319 28 February 18 Box Culvert 252+570 RHS Wall & Slab M-30 5305
320 28 February 18
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
crete Details Month of FEBRUARY - 2018
Slump @
Challan Time Time Slump @ Time Qty. in Total Qty
Driver Name Plant in
No Dispatch Arrive Site in MM Unlode M3 (Per Day)
MM

Champu 1303 10:48 AM 165 11:35 AM 110 12:05 PM 1.30


Ramcharan 1304 11:40 AM 145 12:00 PM 115 3.50
Ladura 1305 11:59 AM 150 12:30 PM 100 3.50
Madan 1306 3:12 PM 145 3:40 PM 100 6.00
Champu 1307 3:26 PM 155 4:00 PM 105 3.00 9.00
Champu 1310 6:47 PM 145 6:55 PM 120 5.50
Ramcharan 1308 5:33 PM 90 5:45 PM 65 6:25 PM 6.50
Ladura 1309 5:54 PM 90 6:05 PM 70 6:45 PM 6.50
Ladura 1312 7:47 PM 95 8:00 PM 80 8:40 PM 6.00
Madan 1313 8:06 PM 100 8:15 PM 85 9:10 PM 6.00 25.00
Ramcharan 1314 9:01 AM 145 9:20 AM 120 3.50
Madan 1315 9:21 AM 155 9:40 AM 115 6.00
Ladura 1316 9:43 AM 155 10:05 AM 115 6.00
Champu 1317 10:08 AM 155 10:43 AM 110 6.00
Ramcharan 1318 11:31 AM 150 11:50 AM 105 4.00
Madan 1319 11:55 AM 150 12:15 PM 100 6.00
Ladura 1323 3:34 PM 145 3:55 PM 95 1.50 7.50
Ladura 1320 12:44 PM 150 1:05 PM 100 5.00
Champu 1322 3:25 PM 155 3:55 PM 100 6.00
Madan 1324 3:52 PM 155 4:24 PM 100 3.50 9.50
Ladura 1325 4:26 PM 150 4:55 PM 115 6.00
Ramcharan 1326 4:57 PM 150 5:26 PM 100 3.50
Champu 1327 6:17 PM 145 6:40 PM 105 3.50
Ramcharan 1328 6:40 PM 90 6:50 PM 70 7:35 PM 6.50
Ladura 1330 7:11 PM 90 7:20 PM 75 8:05 PM 6.50
Champu 1331 7:58 PM 100 8:10 PM 85 8:50 PM 6.00
Ramcharan 1332 8:04 PM 100 8:15 PM 85 9:20 PM 6.00 25.00
Madan 1333 8:51 AM 150 9:00 AM 120 2.50
Ramcharan 1334 2:48 PM 145 3:24 PM 100 6.00
Ladura 1335 3:13 PM 150 3:44 PM 100 3.50 9.50
Champu 1337 3:57 PM 145 4:05 PM 115 4:40 PM 6.00
Madan 1338 5:23 PM 145 5:30 PM 120 5:55 PM 6.00
Champu 1339 5:49 PM 150 6:00 PM 125 6:30 PM 6.00
Madan 1342 7:09 PM 150 7:15 PM 130 7:45 PM 6.00
Champu 1344 7:58 PM 150 8:05 PM 130 8:35 PM 6.00
Madan 1346 8:41 PM 155 8:49 PM 130 9:25 PM 6.00
Madan 1348 9:47 PM 155 9:55 PM 135 10:40 PM 7.00 43.00
Ramcharan 1340 6:13 PM 145 6:30 PM 105 3.75
Ramcharan 1343 7:22 PM 145 7:45 PM 110 3.75
Ladura 1341 6:48 PM 90 7:00 PM 70 7:45 PM 6.00
Ladura 1345 8:19 PM 95 8:30 PM 75 9:15 PM 6.50
Ramcharan 1347 9:28 PM 100 9:40 PM 85 10:25 PM 6.50
Ramcharan 1349 10:11 PM 105 10:20 PM 90 11:00 PM 6.50 25.50
Champu 1352 11:06 AM 145 11:25 AM 100 6.50
Madan 1353 1:04 PM 140 1:25 PM 95 6.50
Ladura 1354 2:31 PM 145 2:50 PM 100 3.00
Ramcharan 1355 2:54 PM 150 3:30 PM 95 3.50
Madan 1357 3:49 PM 145 4:20 PM 100 6.00
Champu 1359 5:09 PM 150 5:40 PM 105 3.50 9.50
Ramcharan 1358 4:49 PM 150 5:00 PM 110 2.80
Ramcharan 1360 5:44 PM 150 6:15 PM 95 3.50
Ladura 1361 6:08 PM 90 6:20 PM 65 7:05 PM 6.50
Madan 1362 6:35 PM 95 6:45 PM 70 7:30 PM 6.50
Ramcharan 1363 7:27 PM 100 7:40 PM 75 8:35 PM 6.50
Champu 1364 7:47 PM 105 8:00 PM 90 8:50 PM 6.00 25.50
Ladura 1365 9:27 AM 155 9:50 AM 120 2.50
Madan 1366 11:38 AM 150 12:00 PM 105 2.80 5.30
Ramcharan 1367 3:12 PM 150 3:30 PM 110 5:30 PM 6.50
Ramcharan 1371 6:03 PM 155 6:25 PM 120 7:10 PM 1.25 7.75
Champu 1368 3:42 PM 150 4:10 PM 100 6.00
Ladura 1369 3:57 PM 150 4:30 PM 100 3.50 9.50
Madan 1370 4:35 PM 145 4:55 PM 95 2.80
Ladura 1372 6:30 PM 150 6:35 PM 115 4.00
Champu 1373 6:52 PM 150 7:10 PM 110 6.50
Ramcharan 1375 7:35 PM 150 7:55 PM 115 3.50
Madan 1374 7:19 PM 90 7:30 PM 75 8:15 PM 6.50
Ladura 1376 9:09 PM 95 9:20 PM 80 10:00 PM 6.50
Ramcharan 1377 9:34 PM 100 9:45 PM 85 10:30 PM 6.00
Champu 1378 10:18 PM 105 10:30 PM 90 11:15 PM 6.50 25.50
Madan 1379 10:56 AM 150 11:15 AM 120 5.50
Ramcharan 1380 11:15 AM 150 11:25 AM 125 3.50
Ramcharan 1381 12:15 PM 145 12:40 PM 100 3.50
Ladura 1382 2:43 PM 145 2:50 PM 110 2.50
Champu 1383 3:07 PM 145 3:30 PM 100 5.00
Madan 1384 4:16 PM 150 4:55 PM 100 2.50
Ramcharan 1386 5:30 PM 150 6:00 PM 105 6.50
Madan 1388 6:07 PM 150 6:30 PM 110 3.50
Ladura 1385 4:49 PM 90 5:00 PM 65 5:45 PM 6.00
Champu 1387 5:52 PM 90 6:05 PM 70 6:50 PM 6.00
Ladura 1389 6:51 PM 95 7:00 PM 75 7:50 PM 6.50
Champu 1390 7:17 PM 100 7:30 PM 85 8:15 PM 6.50 25.00
Champu 1391 11:19 AM 145 11:55 AM 100 5.00
Ramcharan 1396 3:53 PM 140 4:20 PM 95 4.00 9.00
Ramcharan 1392 11:47 AM 145 12:19 PM 105 6.00
Ladura 1393 12:04 PM 145 12:39 PM 95 2.00 8.00
Madan 1394 12:43 PM 150 12:05 PM 110 4.50
Ladura 1397 5:02 PM 155 5:30 PM 100 6.25
Madan 1398 5:25 PM 150 5:30 PM 115 3.50
Madan 1399 5:36 PM 150 5:43 PM 120 2.00
Champu 1400 5:54 PM 150 6:20 PM 120 6.50
Ladura 1401 6:14 PM 150 6:39 PM 100 5.00
Ladura 1402 8:17 PM 90 8:30 PM 70 9:11 PM 6.00
Champu 1403 8:40 PM 95 8:50 PM 75 9:55 PM 6.50
Madan 1404 8:59 PM 100 9:10 PM 80 9:50 PM 6.50
Ramcharan 1405 9:38 PM 100 9:50 PM 85 10:50 PM 6.50 25.50
Ramcharan 1406 12:17 PM 145 12:40 PM 100 6.50
Ladura 1407 12:39 PM 150 1:00 PM 100 4.50
Ladura 1408 12:39 PM 145 1:00 PM 95 2.50
Madan 1409 5:41 PM 150 6:00 PM 105 6.50 9.00
Ramcharan 1410 5:53 PM 150 6:00 PM 120 4.50
Champu 1411 6:25 PM 90 6:35 PM 65 7:20 PM 6.50
Ladura 1412 6:50 PM 150 7:20 PM 100 6.50
Madan 1413 9:42 AM 155 10:10 AM 105 5.00
Ladura 1419 3:08 PM 150 3:35 PM 100 4.50 9.50
Champu 1414 10:10 AM 155 10:20 AM 120 2.50
Ladura 1415 10:35 AM 155 11:05 AM 105 6.00
Madan 1416 12:04 PM 150 12:30 PM 100 3.50
Champu 1417 12:28 PM 150 12:50 PM 110 6.50
Champu 1420 3:35 PM 140 3:55 PM 95 6.00
Madan 1421 3:57 PM 150 4:05 PM 120 4.00
Champu 1423 5:20 PM 145 5:40 PM 105 6.00
Ramcharan 1424 5:32 PM 150 5:50 PM 110 2.50
Madan 1425 6:18 PM 150 6:50 PM 105 5.00
Champu 1427 7:35 PM 150 7:50 PM 115 6.00
Ramcharan 1418 2:39 PM 90 2:50 PM 60 3:05 PM 6.50
Ramcharan 1422 4:18 PM 95 4:30 PM 65 5:15 PM 6.50
Ramcharan 1426 6:42 PM 95 9:10 PM 75 9:50 PM 6.50
Ladura 1428 7:56 PM 100 8:05 PM 85 8:40 PM 6.00 25.50
Madan 1429 9:28 AM 150 10:00 AM 110 2.50
Ramcharan 1431 10:08 AM 150 10:30 AM 115 11:30 AM 6.60
Madan 1432 11:42 AM 150 12:10 PM 100 5.00
Champu 1433 12:16 PM 145 12:35 PM 105 4.00
Ramcharan 1434 3:05 PM 155 3:20 PM 110 6.50
Champu 1436 5:05 PM 150 5:35 PM 95 4.00
Ramcharan 1437 5:20 PM 155 5:50 PM 100 4.50
Madan 1435 4:01 PM 90 1:10 PM 60 4:50 PM 6.50
Madan 1438 5:41 PM 95 5:50 PM 65 6:40 PM 6.50
Champu 1439 7:39 PM 95 7:50 PM 75 8:40 PM 6.50
Madan 1440 8:15 PM 100 8:25 PM 85 9:15 PM 6.00 25.50
Ladura 1441 9:27 AM 150 9:35 AM 125 3.30
Ladura 1441 9:27 AM 150 9:35 AM 125 3.20
Ramcharan 1442 9:45 AM 155 10:05 AM 120 6.50
Champu 1443 10:10 AM 150 10:25 AM 115 3.50
Madan 1444 10:43 AM 145 11:15 AM 100 6.00
Ramcharan 1445 11:10 AM 150 11:20 AM 115 6.50
Champu 1446 11:24 AM 150 11:30 AM 120 3.50
Ramcharan 1447 12:20 PM 145 12:40 PM 100 6.00
Ladura 1448 12:30 PM 150 12:50 PM 115 1.00
Madan 1449 3:08 PM 140 3:30 PM 95 6.00
Champu 1450 3:26 PM 145 3:50 PM 100 3.00
Ladura 1451 4:03 PM 155 4:20 PM 105 6.00
Ramcharan 1452 4:24 PM 145 4:55 PM 95 3.50
Shashi 1453 4:50 PM 90 5:00 PM 60 5:40 PM 6.50
Madan 1455 6:11 PM 95 6:20 PM 65 7:00 PM 6.50
Shashi 1456 6:31 PM 95 6:40 PM 75 7:20 PM 6.50
Ramcharan 1457 7:17 PM 100 7:28 PM 85 8:15 PM 6.00 25.50
Champu 1454 5:23 PM 150 5:45 PM 105 4.50
Champu 1458 8:58 AM 155 9:10 AM 125 4.00
Madan 1459 2:53 PM 150 3:20 PM 95 2.00
Madan 1460 5:03 PM 150 5:35 PM 95 6.00
Ladura 1461 6:16 PM 150 6:45 PM 100 3.50
Champu 1462 6:34 PM 145 6:50 PM 100 6.00
Ladura 1464 7:35 PM 150 7:55 PM 105 3.50
Shashi 1463 6:56 PM 90 7:05 PM 70 7:50 PM 6.50
Madan 1465 8:09 PM 95 8:20 PM 75 9:00 PM 6.50
Shashi 1466 8:54 PM 95 9:05 PM 80 9:45 PM 6.00
Ladura 1467 9:24 PM 100 9:34 PM 85 10:25 PM 6.40 25.40
Madan 1468 9:08 AM 155 9:15 AM 125 3.50
Madan 1468 9:08 AM 155 9:15 AM 125 3.50
Ladura 1469 9:29 AM 155 9:50 PM 115 4.00
Ramcharan 1470 10:01 AM 150 10:20 AM 110 6.00
Madan 1471 4:03 PM 140 4:25 PM 95 6.00
Ramcharan 1472 4:38 PM 145 5:00 PM 95 4.00
Ladura 1473 4:52 PM 155 5:20 PM 100 6.00
Madan 1475 6:00 PM 140 6:20 PM 90 7:10 PM 6.50
Shashi 1474 5:21 PM 90 5:30 PM 65 6:15 PM 6.50
Champu 1476 7:10 PM 95 7:20 PM 75 8:05 PM 6.50 13.00
Ramcharan 1477 9:36 AM 155 9:55 PM 115 10:40 AM 6.50
Madan 1478 11:24 AM 150 11:42 AM 110 3.00
Madan 1478 11:24 AM 150 11:42 AM 110 3.00
Shashi 1479 12:10 PM 90 12:20 PM 70 1:05 PM 6.50
Champu 1480 12:34 PM 90 12:45 PM 70 1:25 PM 6.50
Shashi 1482 2:35 PM 95 2:45 PM 80 3:35 PM 6.50
Shashi 1486 4:04 PM 100 4:14 PM 85 4:05 PM 6.00 25.50
Ramcharan 1481 12:48 PM 150 1:10 PM 105 1.00
Champu 1483 2:20 PM 145 2:50 PM 100 4.00
Ramcharan 1484 3:11 PM 150 3:21 PM 115 3.00
Ramcharan 1484 3:11 PM 150 3:21 PM 115 3.00
Ladura 1485 3:27 PM 145 4:00 PM 95 4.50
Champu 1487 4:25 PM 145 4:35 PM 100 4.50
Shashi 1488 5:35 PM 150 5:55 PM 105 6.50
Ramcharan 1489 5:52 PM 150 6:20 PM 95 5.00
Madan 1490 6:11 PM 145 6:30 PM 100 4.50
Champu 1491 6:51 PM 150 7:15 PM 100 5.50
Shashi 1492 10:00 AM 145 10:20 AM 115 11:40 AM 2.50
Champu 1495 4:23 PM 140 4:50 PM 95 5:50 PM 2.50
Madan 1497 5:58 PM 150 5:20 PM 105 6.00
Champu 1498 6:20 PM 150 6:50 PM 95 2.50
Champu 1498 6:20 PM 150 6:50 PM 95 2.50
Ramcharan 1499 6:20 PM 150 6:50 PM 95 6.00
Madan 1493 3:23 PM 90 3:35 PM 65 4:15 PM 6.50
Shashi 1496 5:01 PM 90 5:10 PM 70 5:55 PM 6.50
Shashi 1500 7:03 PM 95 7:15 PM 75 7:50 PM 6.50
Shashi 1501 7:24 PM 100 7:34 PM 85 8:55 PM 6.00 25.50
Madan 1502 9:20 AM 145 9:40 PM 110 2.50
Ramcharan 1503 9:48 AM 150 9:55 PM 110 6.00
Madan 1504 1:05 PM 150 1:10 PM 125 2:40 PM 7.00
Madan 1506 9:53 AM 155 10:10 PM 125 6.00
Ramcharan 1507 10:12 AM 155 10:30 PM 120 6.00 12.00
Ladura 1508 10:39 AM 150 10:45 PM 110 6.00
Shashi 1509 11:11 AM 150 11:20 PM 105 6.00
Madan 1510 12:03 PM 150 12:25 PM 110 4.50
Ramcharan 1511 1:55 PM 150 2:25 PM 100 6.00
Madan 1512 2:12 PM 150 2:45 PM 95 3.50 9.50
Shashi 1514 2:51 PM 145 3:10 PM 100 4.50
Ramcharan 1515 3:35 PM 145 3:55 PM 100 6.00
Madan 1516 3:55 PM 150 4:25 PM 100 6.00
Ramcharan 1518 5:05 PM 150 5:25 PM 105 6.00
Madan 1520 5:49 PM 150 6:15 PM 105 4.50
Ladura 1513 2:29 PM 90 2:40 PM 65 3:25 PM 6.50
Ladura 1517 4:15 PM 90 4:25 PM 70 5:15 PM 6.50
Ladura 1519 5:35 PM 95 5:45 PM 75 6:30 PM 6.50
Shashi 1521 6:25 PM 95 6:34 PM 80 7:15 PM 5.80 25.30
Ramcharan 1522 9:08 AM 155 9:15 AM 125 6.50
Ramcharan 1525 10:44 AM 150 10:50 AM 120 1.50 8.00
Shashi 1523 9:53 AM 150 10:15 AM 115 10:44 AM 6.00
Champu 1524 10:35 AM 150 10:55 AM 110 11:30 AM 6.00
Madan 1526 11:50 AM 145 12:15 PM 105 12:35 PM 6.00
Shashi 1527 12:17 PM 145 12:45 PM 100 1:15 PM 6.00
Champu 1529 1:46 PM 150 2:10 PM 100 2:35 PM 2.25 26.25
Ramcharan 1528 12:45 PM 150 1:05 PM 105 6.00
Madan 1531 3:48 PM 145 4:15 PM 95 6.50
Champu 1532 4:17 PM 150 4:35 PM 100 6.00
Shashi 1534 5:02 PM 150 5:25 PM 110 5.50
Ramcharan 1530 3:04 PM 90 3:14 PM 65 3:55 PM 6.50
Ladura 1533 4:44 PM 90 4:55 PM 70 5:45 PM 6.50
Ramcharan 1535 5:25 PM 95 5:35 PM 75 6:15 PM 6.50
Champu 1536 6:24 PM 100 6:34 PM 80 7:15 PM 5.50 25.00
Madan 1537 8:57 AM 155 9:35 AM 125 6.50
Shashi 1538 9:24 AM 155 9:45 AM 120 6.00
Madan 1540 10:59 AM 150 11:05 AM 115 3.00
Ramcharan 1541 12:20 PM 145 12:25 PM 100 1.00 4.00
Ramcharan 1542 2:56 PM 145 3:15 PM 95 6.00
Ladura 1543 3:22 PM 140 3:45 PM 95 3.50
Madan 1544 3:52 PM 145 4:25 PM 90 6.50
Champu 1545 4:17 PM 145 4:35 PM 100 5.50
Ladura 1546 5:36 PM 145 6:00 PM 100 6:35 PM 2.25
Ramcharan 1548 5:45 PM 150 6:05 PM 105 3.00
Madan 1549 5:55 PM 150 6:00 PM 120 3.50
Madan 1551 6:57 PM 155 7:15 PM 110 6.50
Ramcharan 1547 5:30 PM 90 5:40 PM 65 6:25 PM 6.50
Ramcharan 1550 6:34 PM 90 6:45 PM 70 7:25 PM 5.50
Ladura 1552 9:14 PM 100 9:25 PM 80 10:15 PM 6.00
Madan 1553 9:33 PM 100 9:44 PM 80 10:35 PM 7.50 25.50
Madan 1554 9:10 AM 155 9:15 AM 125 5.50
Ladura 1555 9:27 AM 155 9:45 AM 120 1.00
Madan 1556 10:45 AM 150 11:05 AM 115 6.00
Ladura 1557 11:37 AM 150 12:05 PM 105 4.50
Ramcharan 1558 4:41 PM 145 5:15 PM 95 5.00
Madan 1560 5:20 PM 145 5:45 PM 95 3.50
Ramcharan 1561 6:34 PM 150 6:55 PM 100 6.00
Madan 1563 7:08 PM 150 7:15 PM 110 3.50
Ramcharan 1564 7:30 PM 150 7:50 PM 110 3.50
Ladura 1559 5:05 PM 90 5:15 PM 65 6:00 PM 6.50
Ramcharan 1562 6:55 PM 90 7:05 PM 70 7:55 PM 6.50
Ladura 1565 8:02 PM 100 8:15 PM 85 9:00 PM 6.50
Madan 1566 8:20 PM 100 8:30 PM 80 9:15 PM 6.00 25.50
Ramcharan 1567 9:03 AM 155 9:10 AM 125 6.00
Madan 1568 9:24 AM 155 9:30 AM 125 1.50
Ramcharan 1569 2:31 PM 90 2:40 PM 65 3:30 PM 6.50
Ramcharan 1570 4:04 PM 90 4:15 PM 70 4:55 PM 6.50
Ramcharan 1572 5:29 PM 90 5:40 PM 70 6:25 PM 6.50
Ramcharan 1575 7:00 PM 95 7:10 PM 75 7:55 PM 6.00 25.50
Madan 1571 4:37 PM 145 5:00 PM 100 3.50
Ladura 1573 5:52 PM 145 6:00 PM 105 6.00
Madan 1574 6:28 PM 150 6:35 PM 105 6.50
Champu 1576 8:55 AM 155 9:00 AM 125 6.50
Champu 1583 11:55 AM 150 12:00 PM 110 2.00
Ramcharan 1585 12:57 PM 150 1:05 PM 100 1.00
Shashi 1577 9:18 AM 155 9:40 AM 115 6.00
Madan 1578 9:41 AM 155 10:05 AM 100 4.50
Ramcharan 1579 9:59 AM 155 10:15 AM 125 3.50
Ramcharan 1581 11:08 AM 150 11:30 AM 100 12:10 PM 2.25
Shashi 1582 11:45 AM 145 12:00 PM 100 3.50
Madan 1584 12:16 PM 145 12:35 PM 110 6.00
Champu 1586 2:56 PM 145 3:10 PM 100 4.00
Shashi 1587 3:59 PM 150 4:15 PM 100 4.50
Ramcharan 1588 4:24 PM 145 4:50 PM 100 3.50
Madan 1590 5:16 PM 150 5:20 PM 115 6.00
Ladura 1589 4:59 PM 90 5:10 PM 65 6:00 PM 6.50
Ramcharan 1591 5:47 PM 90 6:00 PM 65 6:45 PM 6.50
Shashi 1592 6:16 PM 90 6:25 PM 70 7:35 PM 6.50
Ladura 1593 6:34 PM 95 6:44 PM 75 8:35 PM 6.00 25.50
Ramcharan 1594 2:36 PM 150 2:42 PM 110 3.50
Shashi 1596 3:35 PM 150 3:55 PM 100 6.50
Champu 1597 4:06 PM 150 4:25 PM 105 6.50
Ramcharan 1598 4:27 PM 145 4:50 PM 100 5.50
Madan 1595 3:07 PM 90 3:15 PM 65 4:00 PM 6.50
Madan 1599 4:48 PM 90 5:00 PM 65 5:45 PM 6.50
Champu 1601 6:24 PM 90 6:35 PM 70 7:25 PM 6.50
Madan 1602 6:42 PM 95 6:54 PM 75 8:15 PM 6.00 25.50
Ramcharan 1600 5:45 PM 150 6:00 PM 105 5.00
Shashi 1603 8:28 AM 155 8:50 AM 120 3.00
Ramcharan 1604 10:08 AM 150 10:30 AM 110 4.50
Shashi 1606 10:45 AM 150 11:08 AM 105 3.00
Madan 1608 3:58 PM 145 4:20 PM 100 4.00
Ramcharan 1609 4:19 PM 150 4:40 PM 105 3.00
Champu 1610 5:18 PM 150 5:40 PM 105 6.50
Champu 1607 3:27 PM 90 3:40 PM 65 4:30 PM 6.50
Shashi 1611 5:40 PM 90 5:50 PM 65 6:40 PM 6.50
Ramcharan 1612 5:59 PM 90 6:10 PM 70 7:25 PM 6.50
Madan 1613 6:21 PM 95 6:30 PM 75 8:15 PM 6.00 25.50
Shashi 1614 11:39 AM 145 11:55 AM 115 3.50
Madan 1615 6:04 PM 145 6:20 PM 100 3.50
Ramcharan 1616 9:27 AM 150 9:45 AM 120 5.00
Ramcharan 1617 10:19 AM 150 10:40 AM 110 3.00
Madan 1618 4:00 PM 90 4:10 PM 65 5:00 PM 6.50
Shashi 1619 4:29 PM 90 4:40 PM 65 5:30 PM 6.50
Champu 1621 5:10 PM 90 5:20 PM 70 6:10 PM 6.50
Madan 1622 5:47 PM 95 6:00 PM 75 6:45 PM 6.00 25.50
Ramcharan 1620 4:53 PM 150 5:10 PM 105 6.50
Shashi 1623 6:21 PM 150 6:40 PM 110 6.00
Ladura 1625 4:20 PM 90 4:30 PM 65 5:20 PM 6.50
Madan 1627 5:16 PM 90 5:25 PM 65 6:10 PM 6.50
Ladura 1629 6:02 PM 90 6:15 PM 70 6:55 PM 6.00
Madan 1630 6:42 PM 95 6:55 PM 75 7:45 PM 6.00 25.00
Shashi 1626 4:52 PM 140 5:10 PM 105 6.00
Shashi 1623 4:53 PM 150 5:10 PM 105 6.00
Ramcharan 1628 5:38 PM 150 5:43 PM 110 6:20 PM 6.00
Ramcharan 1631 7:18 PM 150 7:23 PM 115 7:50 PM 6.00
Ladura 1632 7:42 PM 150 7:50 PM 115 8:10 PM 6.00
Ladura 1633 9:05 PM 150 9:10 PM 120 9:25 PM 2.00 20.00
Cum. Qty. Remark
in M3 s

1.30
4.80
8.30
14.30
17.30
22.80
29.30
35.80
41.80
47.80
51.30
57.30
63.30
69.30
73.30
79.30
80.80
85.80
91.80
95.30
101.30
104.80
108.30
114.80
121.30
127.30
133.30
135.80
141.80
145.30
151.30
157.30
163.30
169.30
175.30
181.30
188.30
192.05
195.80
201.80
208.30
214.80
221.30
227.80
234.30
237.30
240.80
246.80
250.30
253.10
256.60
263.10
269.60
276.10
282.10
284.60
287.40
293.90
295.15
301.15
304.65
307.45
311.45
317.95
321.45
327.95
334.45
340.45
346.95
352.45
355.95
359.45
361.95
366.95
369.45
375.95
379.45
385.45
391.45
397.95
404.45
409.45
413.45
419.45
421.45
425.95
432.20
435.70
437.70
444.20
449.20
455.20
461.70
468.20
474.70
481.20
485.70
488.20
494.70
499.20
505.70
512.20
517.20
521.70
524.20
530.20
533.70
540.20
546.20
550.20
556.20
558.70
563.70
569.70
576.20
582.70
589.20
595.20
597.70
604.30
609.30
613.30
619.80
623.80
628.30
634.80
641.30
647.80
653.80
657.10
660.30
666.80
670.30
676.30
682.80
686.30
692.30
693.30
699.30
702.30
708.30
711.80
718.30
724.80
731.30
737.30
741.80
745.80
747.80
753.80
757.30
763.30
766.80
773.30
779.80
785.80
792.20
795.70
799.20
803.20
809.20
815.20
819.20
825.20
831.70
838.20
844.70
851.20
854.20
857.20
863.70
870.20
876.70
882.70
883.70
887.70
890.70
893.70
898.20
902.70
909.20
914.20
918.70
924.20
926.70
929.20
935.20
937.70
940.20
946.20
952.70
959.20
965.70
971.70
974.20
980.20
987.20
993.20
999.20
1005.20
1011.20
1015.70
1021.70
1025.20
1029.70
1035.70
1041.70
1047.70
1052.20
1058.70
1065.20
1071.70
1077.50
1084.00
1085.50
1091.50
1097.50
1103.50
1109.50
1111.75
1117.75
1124.25
1130.25
1135.75
1142.25
1148.75
1155.25
1160.75
1167.25
1173.25
1176.25
1177.25
1183.25
1186.75
1193.25
1198.75
1201.00
1204.00
1207.50
1214.00
1220.50
1226.00
1232.00
1239.50
1245.00
1246.00
1252.00
1256.50
1261.50
1265.00
1271.00
1274.50
1278.00
1284.50
1291.00
1297.50
1303.50
1309.50
1311.00
1317.50
1324.00
1330.50
1336.50
1340.00
1346.00
1352.50
1359.00
1361.00
1362.00
1368.00
1372.50
1376.00
1378.25
1381.75
1387.75
1391.75
1396.25
1399.75
1405.75
1412.25
1418.75
1425.25
1431.25
1434.75
1441.25
1447.75
1453.25
1459.75
1466.25
1472.75
1478.75
1483.75
1486.75
1491.25
1494.25
1498.25
1501.25
1507.75
1514.25
1520.75
1527.25
1533.25
1536.75
1540.25
1545.25
1548.25
1554.75
1561.25
1567.75
1573.75
1580.25
1586.25
1592.75
1599.25
1605.25
1611.25
1617.25
1623.25
1629.25
1635.25
1641.25
1643.25
Concrete Details Month
Sr. Grade of Vehicle
Date Location Chainage Side Name of Structure
no Concrete No

1 04 March 18 257+080 to 257+100 LHS Drain Wall M-25 5305


2 04 March 18 257+220 to 257+240 LHS Drain PCC M-15 658
3 04 March 18 YARD 251+950 RHS RE Panal M-35 658
4 04 March 18 YARD 251+950 RHS RE Panal M-35 3115
5 04 March 18 YARD 251+950 RHS RE Panal M-35 5305
6 04 March 18 YARD 251+950 RHS RE Panal M-35 658
7 05 March 18 257+060 to 257+080 LHS Drain Wall M-25 3115
5 05 March 18 YARD 251+950 RHS RE Panal M-35 5305
6 05 March 18 YARD 251+950 RHS RE Panal M-35 5305
7 05 March 18 YARD 251+950 RHS RE Panal M-35 3115
8 06 March 18 YARD 251+950 RHS RE Panal M-35 3115
9 06 March 18 YARD 251+950 RHS RE Panal M-35 3115
10 06 March 18 YARD 251+950 RHS RE Panal M-35 658
11 06 March 18 YARD 251+950 RHS RE Panal M-35 658
12 06 March 18 257+060 to 257+080 LHS Drain Wall M-25 5305
13 07 March 18 YARD 251+950 RHS RE Panal M-35 3115
14 07 March 18 YARD 251+950 RHS RE Panal M-35 5305
15 07 March 18 YARD 251+950 RHS RE Panal M-35 3115
16 07 March 18 YARD 251+950 RHS RE Panal M-35 3115
17 07 March 18 257+260 to 257+300 LHS Drain PCC M-15 5305
18 08 March 18 257+225 to 257+250 LHS Drain Raft M-25 5305
19 08 March 18
20 08 March 18
21 08 March 18
22 08 March 18
23 08 March 18
24
25
26
27
28
29
30
31
Concrete Details Month of MARCH- 2018
Slump @ Slump @ Total Qty
Challan Time Time Time Qty. in
Driver Name Plant in Site in (Per
No Dispatch Arrive Unlode M3
MM MM Day)

Ladura 1634 10:11 AM 150 10:30 AM 110 6.00


Madan 1635 2:38 PM 155 3:00 PM 110 4.50
Madan 1637 4:25 PM 90 4:35 PM 60 5:20 PM 6.50
Madan 1638 5:00 PM 90 5:10 PM 65 5:55 PM 6.50
Ladura 1639 5:27 PM 90 5:40 PM 70 6:25 PM 6.50
Jatin 1640 5:48 PM 95 6:00 PM 75 7:25 PM 6.00 25.50
Madan 1641 3:43 PM 145 4:00 PM 105 5.50
Champu 1642 4:40 PM 90 4:50 PM 60 5:40 PM 6.50
Champu 1643 5:58 PM 90 6:10 PM 65 5:55 PM 6.50
Madan 1644 6:37 PM 90 6:50 PM 70 7:45 PM 6.50 19.50
Jatin 1645 2:49 PM 90 3:00 PM 60 3:50 PM 6.50
Madan 1647 4:35 PM 90 4:45 PM 65 5:35 PM 6.50
Madan 1648 5:17 PM 90 5:30 PM 70 6:15 PM 6.50
Champu 1649 7:24 PM 95 7:35 PM 75 8:20 PM 6.00 25.50
Ladura 1646 3:20 PM 145 3:40 PM 105 4.50
Jatin 1650 4:14 PM 90 4:25 PM 60 5:10 PM 6.50
Ladura 1651 4:40 PM 90 4:50 PM 60 5:55 PM 6.50
Jatin 1653 6:24 PM 90 6:35 PM 70 7:15 PM 6.50
Madan 1654 7:50 PM 95 8:00 PM 75 8:45 PM 6.00 25.50
Ladura 1652 5:59 PM 145 6:15 AM 105 6.00
Ladura 1655 9:26 AM 150 9:45 AM 115 6.00
Cum. Qty. Remark
in M3 s

6.00
10.50
17.00
23.50
30.00
36.00
41.50
48.00
54.50
61.00
67.50
74.00
80.50
86.50
91.00
97.50
104.00
110.50
116.50
122.50
128.50
Concrete Details Month
Grade of
Sr. no Date Location Chainage Side Name of Structure Vehicle No
Concrete

1 07 October 17 VUP 239+050 RHS A2 PIER 1-2-3 1st LIFT M-35 5305
2 08 October 17 HPC 258+700 RHS HEAD WALL PCC M-15 5305
3 10 October 17 VUP 239+050 RHS A2 PIER -3 2nd LIFT M-35 658
4 10 October 17 HPC 258+700 RHS HEAD WALL 1st Lift M-20 5305
5 12 October 17 VUP 239+050 RHS A2 PIER 1-2 2nd LIFT M-35 5305
6 13 October 17 HPC 258+700 LHS/RHS H.Wall /Chamber Pcc M-15 658
7 15 October 17 VUP 239+050 RHS A1 PIER 1-2-3 1st LIFT M-35 5305
8 16 October 17 HPC 258+700 LHS Head Wall 2nd Lift M-20 5305
9 16 October 17 VUP 239+050 RHS A1 PIER -3 2nd LIFT M-35 5305
10 17 October 17 VUP 239+050 RHS A1 PIER -3 2nd LIFT M-35 658
11 18 October 17 VUP 239+050 RHS A1 PIER 1-2 2nd LIFT M-35 5305
12 28 October 17 YARD 251+950 RHS RE Panal M-35 658
13 29 October 17 YARD 251+950 RHS RE Panal M-35 658
14 30 October 17 YARD 251+950 RHS RE Panal M-35 5305
15 31 October 17 YARD 251+950 RHS RE Panal M-35 5305
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
crete Details Month of October- 2017
Slump @ Slump @ Total Qty Cum.
Challan Time Time Time Qty. in
Driver Name Plant in Site in (Per Qty. in
No Dispatch Arrive Unlode M3
MM MM Day) M3

Raju 375 155 115 6.25 6.25


Tapan 375 110 75 1.75 1.75
Ramcharan 381 150 90 2.25 2.25
Tapan 382 110 70 5.50 5.50
Tapan 385 150 90 4.00 4.00
Ramcharan 387 100 60 2.60 2.60
Tapan 390 155 105 6.00 6.00
Tapan 391 160 80 7.00 7.00
Tapan 392 155 120 2.25 2.25
Ramcharan 394 155 120 2.25 2.25
Tapan 395 155 90 4.25 4.25
Ramcharan 396 90 75 6.00 6.00
Ramcharan 398 95 75 6.00 6.00
Tapan 399 90 70 5.50 5.50
Tapan 401 95 75 6.00 23.50 6.00
Remark
s
Concrete Details Month
Grade of Vehicle
Sr. no Date Location Chainage Side Name of Structure
Concrete No

1 01 November 17 YARD 251+950 RHS RE Panal M-35 5305


2 02 November 17 YARD 251+950 RHS RE Panal M-35 5305
3 03 November 17 YARD 251+950 RHS RE Panal M-35 5305
4 04 November 17 YARD 251+950 RHS RE Panal M-35 5305
5 04 November 17 VUP 239+050 RHS A2 P2 PILE M-35 658
6 04 November 17 VUP 239+050 RHS A2 P2 PILE M-35 3115
7 04 November 17 VUP 239+050 RHS A2 P2 PILE M-35 658
8 05 November 17 YARD 251+950 RHS RE Panal M-35 5305
9 06 November 17 YARD 251+950 RHS RE Panal M-35 5305
10 06 November 17 YARD 251+950 RHS RE Panal M-35 5305
11 07 November 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
12 07 November 17 VUP 239+050 RHS A2 P2 PILE M-35 658
13 07 November 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
14 07 November 17 YARD 251+950 RHS RE Panal M-35 658
15 08 November 17 YARD 251+950 RHS RE Panal M-35 5305
16 09 November 17 HPC 258+700 RHS Pipe Bedding Pcc M-15 5305
17 09 November 17 VUP 239+050 LHS A2 P6 PILE M-35 658
18 09 November 17 VUP 239+050 LHS A2 P6 PILE M-35 5305
19 09 November 17 VUP 239+050 LHS A2 P6 PILE M-35 658
20 09 November 17 YARD 251+950 RHS RE Panal M-35 3115
21 10 November 17 HPC 258+700 RHS Chamber Raft M-35 3115
22 10 November 17 YARD 251+950 RHS RE Panal M-35 5305
23 11 November 17 YARD 251+950 RHS RE Panal M-35 658
24 11 November 17 VUP 239+050 LHS A2 P3 PILE M-35 658
25 11 November 17 VUP 239+050 LHS A2 P3 PILE M-35 3115
26 11 November 17 VUP 239+050 LHS A2 P3 PILE M-35 658
27 12 November 17 HPC 258+700 RHS Pipe Bedding Pcc M-15 5305
28 12 November 17 HPC 258+700 RHS Pipe Bedding Pcc M-15 5305
29 12 November 17 YARD 251+950 RHS RE Panal M-35 658
30 12 November 17 YARD 251+950 RHS RE Panal M-35 658
31 13 November 17 VUP 239+050 LHS A2 P1 PILE M-35 3115
32 13 November 17 VUP 239+050 LHS A2 P1 PILE M-35 5305
33 13 November 17 VUP 239+050 LHS A2 P1 PILE M-35 658
35 14 November 17 HPC 263+570LHS Head Wall Pcc M-15 658
35 14 November 17 HPC 258+700 RHS Head Wall 2nd LIFT M-20 5305
36 14 November 17 YARD 251+950 RHS RE Panal M-35 3115
37 14 November 17 YARD 251+950 RHS RE Panal M-35 658
38 15 November 17 HPC 263+570 LHS Chamber PCC M-15 5305
39 15 November 17 HPC 258+700 LHS Head Wall 3rd LIFT M-20 5305
40 15 November 17 YARD 251+950 RHS RE Panal M-35 658
41 15 November 17 VUP 239+050 LHS A2 P5 PILE M-35 5305
42 15 November 17 VUP 239+050 LHS A2 P5 PILE M-35 3115
43 15 November 17 VUP 239+050 LHS A2 P5 PILE M-35 658
44 16 November 17 HPC 263+570 RHS Head Wall 1st LIFT M-20 5305
45 16 November 17 YARD 251+950 RHS RE Panal M-35 658
46 17 November 17 HPC 258+700 LHS Pipe Craddle Pcc M-15 3115
47 17 November 17 VUP 239+050 LHS A1 P5 PILE M-35 5305
48 17 November 17 VUP 239+050 LHS A1 P5 PILE M-35 658
49 17 November 17 VUP 239+050 LHS A1 P5 PILE M-35 5305
50 17 November 17 YARD 251+950 RHS RE Panal M-35 3115
51 18 November 17 HPC 258+700 LHS Head Wall Final LIFT M-20 658
52 18 November 17 HPC 258+700 LHS Head Wall Final LIFT M-20 658
53 18 November 17 YARD 251+950 RHS RE Panal M-35 658
54 19 November 17 HPC 258+700 LHS Head Wall LIFT M-20 5305
55 19 November 17 HPC 258+700 LHS Head Wall lst LIFT M-20 658
56 19 November 17 YARD 251+950 RHS RE Panal M-35 5305
57 19 November 17 VUP 239+050 LHS A1 P1 PILE M-35 3115
58 19 November 17 VUP 239+050 LHS A1 P1 PILE M-35 658
59 19 November 17 VUP 239+050 LHS A1 P1 PILE M-35 5305
60 20 November 17 HPC 263+570 RHS Pipe Bedding Pcc M-15 5305
61 20 November 17 YARD 251+950 RHS RE Panal M-35 3115
62 21 November 17 YARD 251+950 RHS RE Panal M-35 658
63 22 November 17 250+490 to 250+515 LHS Drain Slab M 25 3115
64 22 November 17 250+490 to 250+515 LHS Drain Slab M 25 5305
65 22 November 17 VUP 239+050 LHS A1 P4 PILE M-35 3115
66 22 November 17 VUP 239+050 LHS A1 P4 PILE M-35 5305
67 22 November 17 VUP 239+050 LHS A1 P4 PILE M-35 658
68 22 November 17 241+360 to 241+415 RHS Drain Pcc M 15 3115
69 22 November 17 241+360 to 241+415 RHS Drain Pcc M 15 3115
70 22 November 17 YARD 251+950 RHS RE Panal M-35 5305
71 23 November 17 HPC 258+700 LHS Head Wall 2nd LIFT M-20 5305
72 23 November 17 YARD 251+950 RHS RE Panal M-35 658
73 24 November 17 VUP 239+050 LHS A1 P6 PILE M-35 5305
74 24 November 17 VUP 239+050 LHS A1 P6 PILE M-35 658
75 24 November 17 VUP 239+050 LHS A1 P6 PILE M-35 3115
76 24 November 17 250+540 to 250+515 LHS Drain Slab M 25 5305
77 24 November 17 250+540 to 250+515 LHS Drain Slab M 25 658
78 24 November 17 YARD 251+950 RHS RE Panal M-35 5305
79 25 November 17 250+430 to 250+480 LHS Drain Pcc M 15 658
80 25 November 17 250+430 to 250+480 LHS Drain Pcc M 15 658
81 25 November 17 YARD 251+950 RHS RE Panal M-35 5305
82 26 November 17 HPC 258+700 LHS Head Wall FinalLIFT M-20 658
83 26 November 17 250+380 to 250+400 RHS Drain Slab M 25 5305
84 26 November 17 250+380 to 250+400 RHS Drain Slab M 25 5305
85 26 November 17 250+390 to 250+430 LHS Drain Pcc M 15 658
86 26 November 17 VUP 239+050 LHS A1 P3 PILE M-35 658
87 26 November 17 VUP 239+050 LHS A1 P3 PILE M-35 5305
88 26 November 17 VUP 239+050 LHS A1 P3 PILE M-35 3115
89 26 November 17 YARD 251+950 RHS RE Panal M-35 658
90 27 November 17 HPC 263+570 RHS Head Wall First/ 2nd LIFT M-20 658
91 27 November 17 YARD 251+950 RHS RE Panal M-35 658
92 28 November 17 VUP 239+050 LHS A2 PILE CAP Pcc M-15 658
93 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 5305
94 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 658
95 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 5305
96 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 658
97 28 November 17 VUP 239+050 LHS A1 P2 PILE M-35 3115
98 28 November 17 VUP 239+050 LHS A1 P2 PILE M-35 658
99 28 November 17 VUP 239+050 LHS A1 P2 PILE M-35 5305
100 28 November 17 YARD 251+950 RHS RE Panal M-35 3115
101 28 November 17 YARD 251+950 RHS RE Panal M-35 3115
102 29 November 17 YARD 251+950 RHS RE Panal M-35 2649
103 29 November 17 YARD 251+950 RHS RE Panal M-35 5305
104 30 November 17 241+360 to 241+385 RHS Drain Raft M 25 658
105 30 November 17 250+400 to 250+480 LHS Drain Raft M 25 5305
106 30 November 17 250+400 to 250+480 LHS Drain Raft M 25 3115
107 30 November 17 250+585 to 250+615 LHS Drain Slab M 25 5305
108 30 November 17 250+585 to 250+615 LHS Drain Slab M 25 658
109 29 November 17 YARD 251+950 RHS RE Panal M-35 2649
110 29 November 17 YARD 251+950 RHS RE Panal M-35 5305
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
te Details Month of November- 2017
Slump @ Slump @ Total Qty Cum.
Driver Challan Time Time Time Qty. in
Plant in Site in (Per Qty. in
Name No Dispatch Arrive Unlode M3
MM MM Day) M3

Tapan 404 80 70 6.00 6.00


Tapan 406 65 60 6.00 12.00
Tapan 407 70 60 6.00 18.00
Tapan 409 70 65 6.00 24.00
Ramcharan 410 180 140 7.00 31.00
Madan 411 170 130 7.00 38.00
Ramcharan 412 170 150 1.50 15.50 39.50
Tapan 413 80 75 6.00 45.50
Tapan 414 90 70 6.00 51.50
Tapan 418 85 65 6.00 57.50
Tapan 423 175 130 6.00 63.50
Ramcharan 424 170 150 6.00 69.50
Tapan 425 170 140 2.00 14.00 71.50
Ramcharan 427 90 75 6.00 77.50
Tapan 430 95 70 6.00 83.50
Tapan 431 95 60 3.33 86.83
Ramcharan 431 180 140 6.00 92.83
Tapan 433 175 145 6.00 98.83
Ramcharan 434 175 150 3.00 15.00 101.83
Nanji bhai 435 90 75 6.00 107.83
Tapan 436 100 65 1.80 109.63
Tapan 437 100 65 6.00 115.63
Ramcharan 443 95 65 6.00 121.63
Ramcharan 444 170 135 6.00 127.63
Champu 445 175 140 6.00 133.63
Ramcharan 446 175 145 3.25 15.25 136.88
Tapan 447 125 60 4.00 140.88
Tapan 449 120 55 1.00 5.00 141.88
Ramcharan 452 100 65 6.00 147.88
Ramcharan 459 100 70 6.00 153.88
Champu 460 185 130 6.00 159.88
Tapan 461 180 135 6.00 165.88
Ramcharan 462 180 140 3.25 15.25 169.13
Ramcharan 463 115 70 1.70 170.83
Tapan 464 110 65 3.80 174.63
Champu 465 95 60 6.00 180.63
Ramcharan 466 90 60 3.00 183.63
Tapan 467 120 70 1.00 184.63
Tapan 470 100 65 2.60 187.23
Ramcharan 471 100 70 6.00 193.23
Tapan 472 180 140 6.00 199.23
Champu 473 185 145 6.00 205.23
Ramcharan 474 185 150 3.50 15.50 208.73
Tapan 479 120 75 7.00 215.73
Ramcharan 482 95 65 6.00 221.73
Champu 489 120 70 3.00 224.73
Tapan 491 180 140 6.00 230.73
Ramcharan 492 180 145 6.00 236.73
Tapan 494 185 150 3.25 15.25 239.98
Mahesh 493 95 65 7.00 246.98
Ramcharan 497 140 75 3.20 250.18
Ramcharan 499 135 70 0.50 250.68
Ramcharan 505 95 60 7.00 257.68
Tapan 506 130 70 3.20 260.88
Ramcharan 507 135 75 1.50 262.38
Tapan 505 95 60 7.00 269.38
Champu 510 175 145 6.00 275.38
Ramcharan 511 180 150 6.00 281.38
Tapan 512 170 140 3.50 15.50 284.88
Tapan 518 130 75 4.00 288.88
Champu 519 85 55 7.00 295.88
Ramcharan 530 90 60 7.00 302.88
Champu 531 130 75 6.00 308.88
Tapan 533 125 70 1.50 310.38
Champu 536 170 140 6.00 316.38
Tapan 537 170 145 6.00 322.38
Ramcharan 539 175 135 3.00 15.00 325.38
Champu 540 120 65 6.00 331.38
Tapan 543 115 60 4.00 335.38
Tapan 545 90 60 7.00 342.38
Tapan 548 135 100 7.00 349.38
Ramcharan 573 95 70 7.00 356.38
Tapan 552 170 140 6.00 362.38
Ramcharan 553 175 145 6.00 368.38
Champu 554 180 150 3.25 15.25 371.63
Tapan 555 125 95 6.00 377.63
Ramcharan 556 125 95 2.00 379.63
Tapan 557 90 65 7.00 386.63
Ramcharan 558 140 105 6.00 392.63
Ramcharan 559 130 95 6.00 398.63
Tapan 560 90 60 7.00 405.63
Ramcharan 563 135 105 4.50 410.13
Tapan 564 140 110 7.00 417.13
Tapan 566 140 110 2.15 419.28
Ramcharan 565 140 115 6.00 425.28
Ramcharan 567 170 140 6.00 431.28
Tapan 568 175 145 6.00 437.28
Nanji bhai 569 180 150 3.50 15.50 440.78
Ramcharan 570 100 80 7.00 447.78
Ramcharan 580 130 75 5.00 452.78
Ramcharan 583 100 90 7.00 459.78
Ramcharan 586 165 130 3.50 463.28
Tapan 587 135 110 6.00 469.28
Ramcharan 591 140 115 6.00 475.28
Tapan 593 135 120 6.00 481.28
Ramcharan 594 130 110 3.50 21.50 484.78
Bulkesh 588 175 140 6.00 490.78
Ramcharan 589 180 145 6.00 496.78
Tapan 590 180 150 3.50 15.50 500.28
Bulkesh 592 100 85 6.00 506.28
Bulkesh 595 100 90 5.00 511.28
Shashi 598 95 85 6.00 517.28
Tapan 599 100 90 5.00 522.28
Ramcharan 601 125 80 6.00 528.28
Tapan 602 130 85 6.00 534.28
Bulkesh 603 125 80 2.00 536.28
Tapan 604 130 85 6.00 542.28
Ramcharan 605 135 90 1.50 543.78
Shashi 606 95 85 6.00 549.78
Tapan 607 95 90 5.00 554.78
554.78
Remark
s
Concrete Details Month
Grade of Vehicle
Sr. no Date Location Chainage Side Name of Structure
Concrete No

1 01 December 17 250+400 to 250+430 LHS Drain Slab M 25 658


2 01 December 17 250+400 to 250+430 LHS Drain Slab M 25 2649
3 01 December 17 YARD 251+950 RHS RE Panal M-35 2649
4 01 December 17 YARD 251+950 RHS RE Panal M-35 658
5 02 December 17 241+380 to 241+400 RHS Drain Raft M 25 658
6 02 December 17 HPC 258+700 LHS Chamber Wall M-25 3115
7 02 December 17 HPC 258+700 LHS Chamber Wall M-25 5305
8 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 658
9 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 3115
10 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 5305
11 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 658
12 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 3115
13 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 5305
14 02 December 17 250+610 to 250+650 LHS Drain Slab M 25 2649
15 02 December 17 250+610 to 250+650 LHS Drain Slab M 25 5305
16 02 December 17 YARD 251+950 RHS RE Panal M-35 2649
17 02 December 17 YARD 251+950 RHS RE Panal M-35 5305
18 02 December 17 YARD 251+950 RHS RE Panal M-35 658
19 03 December 17 250+400 to 250+430 LHS Drain Raft M 25 3115
20 03 December 17 250+400 to 250+430 LHS Drain Raft M 25 5305
21 03 December 17 HPC 263+570 LHS Pipe Enasing pcc M-15 658
22 03 December 17 HPC 263+570 LHS Pipe Enasing pcc M-15 3115
23 03 December 17 HPC 263+570 LHS Pipe Enasing pcc M-15 658
24 03 December 17 250+440 to 250+460 LHS Drain Slab M 25 3115
25 03 December 17 250+440 to 250+460 LHS Drain Slab M 25 658
26 03 December 17 YARD 251+950 RHS RE Panal M-35 2649
27 03 December 17 YARD 251+950 RHS RE Panal M-35 3115
28 03 December 17 YARD 251+950 RHS RE Panal M-35 2649
29 03 December 17 YARD 251+950 RHS RE Panal M-35 658
30 04 December 17 YARD 251+950 RHS RE Panal M-35 5305
31 04 December 17 YARD 251+950 RHS RE Panal M-35 2649
32 04 December 17 YARD 251+950 RHS RE Panal M-35 2649
33 04 December 17 YARD 251+950 RHS RE Panal M-35 5305
34 04 December 17 243+380 to 243+420 LHS Drain Pcc M-15 658
35 04 December 17 243+380 to 243+420 LHS Drain Pcc M-15 3115
36 04 December 17 250+650 to 250+670 LHS Drain Slab M 25 658
37 04 December 17 250+650 to 250+670 LHS Drain Slab M 25 658
38 06 December 17 YARD 251+950 RHS RE Panal M-35 658
39 06 December 17 YARD 251+950 RHS RE Panal M-35 2649
40 06 December 17 YARD 251+950 RHS RE Panal M-35 5305
41 06 December 17 YARD 251+950 RHS RE Panal M-35 3115
42 07 December 17 YARD 251+950 RHS RE Panal M-35 2649
43 07 December 17 YARD 251+950 RHS RE Panal M-35 658
44 07 December 17 YARD 251+950 RHS RE Panal M-35 658
45 07 December 17 YARD 251+950 RHS RE Panal M-35 5305
46 08 December 17 250+380 to 250+400 LHS Drain Raft M 25 3115
47 08 December 17 250+670 to 250+690 LHS Drain Slab M 25 658
48 08 December 17 250+860 to 250+880 LHS Drain Slab M 25 658
49 08 December 17 YARD 251+950 RHS RE Panal M-35 3115
50 08 December 17 YARD 251+950 RHS RE Panal M-35 5305
51 09 December 17 250+460 to 250+480 LHS Drain Wall M 25 5305
52 09 December 17 250+470 to 250+500 RHS Drain Slab M 25 3115
53 09 December 17 250+470 to 250+500 RHS Drain Slab M 25 658
54 09 December 17 YARD 251+950 RHS RE Panal M-35 5305
55 09 December 17 YARD 251+950 RHS RE Panal M-35 658
56 09 December 17 YARD 251+950 RHS RE Panal M-35 3115
57 10 December 17 250+470 to 250+500 RHS Drain Slab M 25 658
58 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
59 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 658
60 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 3115
61 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
62 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 3115
63 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 658
64 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
65 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 3115
66 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 658
67 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
68 10 December 17 YARD 251+950 RHS RE Panal M-35 658
69 10 December 17 YARD 251+950 RHS RE Panal M-35 3115
70 11 December 17 250+470 to 250+500 RHS Drain Wall M 25 658
71 11 December 17 VUP 239+050 LHS A2 Pile Pcc M-15 3115
72 11 December 17 243+400 to 243+420 LHS Drain Raft M 25 658
73 11 December 17 YARD 251+950 RHS RE Panal M-35 658
74 11 December 17 YARD 251+950 RHS RE Panal M-35 3115
75 11 December 17 YARD 251+950 RHS RE Panal M-35 658
76 11 December 17 YARD 251+950 RHS RE Panal M-35 3115
77 11 December 17 250+310 to 250+340 RHS Drain Pcc M-15 5305
78 12 December 17 HPC 263+570 LHS Head Wall 3rd Lift M-20 658
79 12 December 17 243+380 to 243+400 RHS Drain Raft M 25 3115
80 12 December 17 250+290 to 250+310 LHS Drain Pcc M-15 658
81 12 December 17 256+600 to 256+680 LHS Drain Pcc M-15 5305
82 12 December 17 YARD 251+950 RHS RE Panal M-35 658
83 12 December 17 YARD 251+950 RHS RE Panal M-35 5305
84 12 December 17 YARD 251+950 RHS RE Panal M-35 3115
85 13 December 17 250+710 to 250+740 LHS Drain Slab M 25 658
86 13 December 17 250+710 to 250+740 LHS Drain Slab M 25 2649
87 13 December 17 250+440 to 250+460 LHS Drain Wall M 25 5305
88 13 December 17 250+710 to 250+720 LHS Drain Pcc M-15 2649
89 13 December 17 250+830 to 250+840 LHS Drain Wall M 25 658
90 13 December 17 256+600 to 256+640 LHS Drain Pcc M-15 5305
91 13 December 17 243+360 to 243+380 LHS Drain Raft M 25 658
92 13 December 17 YARD 251+950 RHS RE Panal M-35 658
93 13 December 17 YARD 251+950 RHS RE Panal M-35 5305
94 13 December 17 YARD 251+950 RHS RE Panal M-35 3115
95 14 December 17 YARD 251+950 RHS RE Panal M-35 2649
96 14 December 17 YARD 251+950 RHS RE Panal M-35 3115
97 14 December 17 YARD 251+950 RHS RE Panal M-35 5305
98 14 December 17 YARD 251+950 RHS RE Panal M-35 1028
99 14 December 17 250+750 to 250+760 LHS Drain Slab M 25 658
100 15 December 17 YARD 251+950 RHS RE Panal M-35 5305
101 15 December 17 YARD 251+950 RHS RE Panal M-35 2649
102 15 December 17 YARD 251+950 RHS RE Panal M-35 3115
103 15 December 17 YARD 251+950 RHS RE Panal M-35 1028
104 15 December 17 250+460 to 250+490 LHS Drain Slab M 25 1028
105 15 December 17 250+460 to 250+490 LHS Drain Slab M 25 3115
106 15 December 17 243+360 to 243+380 LHS Drain Pcc M-15 658
107 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 3115
108 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 5305
109 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 1028
110 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 658
111 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 3115
112 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 5305
113 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 1028
114 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 658
115 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 5305
116 16 December 17 250+780 to 250+800 LHS Drain Slab M 25 3115
117 16 December 17 250+780 to 250+800 LHS Drain Slab M 25 1028
118 16 December 17 YARD 251+950 RHS RE Panal M-35 658
119 16 December 17 YARD 251+950 RHS RE Panal M-35 2649
120 16 December 17 YARD 251+950 RHS RE Panal M-35 1028
122 17 December 17 250+440 to 250+460 LHS Drain Wall M 25 5305
123 17 December 17 250+530 to 250+550 LHS Drain Slab M 25 658
124 17 December 17 250+530 to 250+550 LHS Drain Slab M 25 1028
125 17 December 17 250+530 to 250+550 LHS Drain Slab M 25 1028
126 17 December 17 VUP 239+050 LHS A2 Pier -1/2/3 1st Lift M-35 658
127 17 December 17 250+300 to 250+360 LHS Drain Raft M 25 5305
128 17 December 17 243+360 to 243+380 LHS Drain Raft M 25 658
129 17 December 17 YARD 251+950 RHS RE Panal M-35 2649
130 17 December 17 YARD 251+950 RHS RE Panal M-35 1028
131 17 December 17 YARD 251+950 RHS RE Panal M-35 2649
132 17 December 17 YARD 251+950 RHS RE Panal M-35 3115
133 18 December 17 250+810 to 250+820 LHS Drain Slab M 25 658
134 18 December 17 250+290 to 250+310 LHS Drain Raft M 25 5305
135 18 December 17 250+840 to 250+860 LHS Drain Raft M 25 1028
136 18 December 17 256+360 to 256+380 LHS Drain Raft M 25 3115
137 18 December 17 250+820 to 250+835 LHS Drain Pcc M-15 658
138 18 December 17 241+360 to 241+380 RHS Drain Wall M 25 5305
139 18 December 17 VUP 239+050 LHS A2 Pier -3 2nd Lift M-35 658
140 18 December 17 YARD 251+950 RHS RE Panal M-35 2649
141 18 December 17 YARD 251+950 RHS RE Panal M-35 1028
142 18 December 17 YARD 251+950 RHS RE Panal M-35 3115
143 18 December 17 YARD 251+950 RHS RE Panal M-35 2649
144 18 December 17 YARD 251+950 RHS RE Panal M-35 5305
145 19 December 17 250+420 to 250+440 LHS Drain Wall M 25 658
146 19 December 17 256+640 to 256+660 LHS Drain Raft M 25 3115
147 19 December 17 250+710 & 250+820 LHS Drain Raft M 25 5305
148 19 December 17 243+340 to 243+370 LHS Drain Raft M 25 3115
149 19 December 17 VUP 239+050 LHS A2 Pier -1/2 2nd Lift M-35 1028
150 19 December 17 250+440 to 250+460 LHS Drain Slab M 25 658
151 19 December 17 YARD 251+950 RHS RE Panal M-35 2649
152 19 December 17 YARD 251+950 RHS RE Panal M-35 3115
153 19 December 17 YARD 251+950 RHS RE Panal M-35 3115
154 19 December 17 YARD 251+950 RHS RE Panal M-35 5305
155 19 December 17 YARD 251+950 RHS RE Panal M-35 658
156 20 December 17 256+620 to 256+640 LHS Drain Raft M 25 5305
157 20 December 17 YARD 251+950 RHS RE Panal M-35 5305
158 20 December 17 YARD 251+950 RHS RE Panal M-35 2649
159 20 December 17 YARD 251+950 RHS RE Panal M-35 3115
160 20 December 17 YARD 251+950 RHS RE Panal M-35 1028
161 20 December 17 YARD 251+950 RHS RE Panal M-35 2649
162 21 December 17 256+600 to 256+650 LHS Drain Pcc M-15 5305
163 21 December 17 250+400 to 250+420 LHS Drain Wall M 25 1028
164 21 December 17 250+400 to 250+420 LHS Drain Wall M 25 5305
165 21 December 17 250+360 & 250+770 LHS Drain Pcc M-15 2649
166 21 December 17 256+500 to 256+550 RHS Drain Pcc M-15 658
167 21 December 17 250+420 to 250+440 LHS Drain Slab M 25 1028
168 21 December 17 YARD 251+950 RHS RE Panal M-35 2649
169 21 December 17 YARD 251+950 RHS RE Panal M-35 1028
170 21 December 17 YARD 251+950 RHS RE Panal M-35 5305
171 21 December 17 YARD 251+950 RHS RE Panal M-35 658
172 21 December 17 YARD 251+950 RHS RE Panal M-35 2649
173 21 December 17 Box Culvert 257+700 RHS PCC M-15 3115
174 22 December 17 256+550 to 256+600 RHS Drain Pcc M-15 1028
175 22 December 17 243+400 to 243+420 LHS Drain Wall M 25 5305
176 22 December 17 250+550 to 250+570RHS Drain Slab M 25 1028
177 22 December 17 250+550 to 250+570 RHS Drain Slab M 25 2649
178 22 December 17 250+550 to 250+570 RHS Drain Slab M 25 2649
179 22 December 17 YARD 251+950 RHS RE Panal M-35 658
180 22 December 17 YARD 251+950 RHS RE Panal M-35 3115
181 22 December 17 YARD 251+950 RHS RE Panal M-35 658
182 22 December 17 YARD 251+950 RHS RE Panal M-35 2649
183 22 December 17 YARD 251+950 RHS RE Panal M-35 1028
184 23 December 17 250+390 to 250+400 LHS Drain Wall M 25 5305
185 23 December 17 256+550 to 256+600 RHS Drain Pcc M-15 3115
186 23 December 17 256+600 to 256+620 LHS Drain Raft M 25 658
187 23 December 17 VUP 239+050 LHS A1 Pier -1/2/3 1st Lift M-35 3115
188 23 December 17 250+390 to 250+400 LHS Drain Pcc M-15 3115
189 23 December 17 250+670 to 250+680 LHS Drain Wall M 25 5305
190 23 December 17 YARD 251+950 RHS RE Panal M-35 2649
191 23 December 17 250+400 to 250+420 LHS Drain Slab M 25 3115
192 23 December 17 256+580 to 256+600 LHS Drain Raft M 25 5305
193 23 December 17 250+590 to 250+610 RHS Drain Slab M 25 1028
194 24 December 17 256+520 to 256+560 LHS Drain Pcc M-15 658
195 24 December 17 243+400 to 243+410 LHS Drain Wall M 25 5305
196 24 December 17 250+380 to 250+400 LHS Drain Wall M 25 1028
197 24 December 17 250+360 to 250+380 LHS Drain Raft M 25 658
198 24 December 17 250+820 to 250+850 RHS Drain Slab M 25 658
199 24 December 17 250+360 to 250+380 LHS Drain Raft M 25 1028
200 24 December 17 YARD 251+950 RHS RE Panal M-35 2649
201 24 December 17 YARD 251+950 RHS RE Panal M-35 2649
202 24 December 17 YARD 251+950 RHS RE Panal M-35 2649
203 24 December 17 YARD 251+950 RHS RE Panal M-35 5305
204 24 December 17 YARD 251+950 RHS RE Panal M-35 1028
205 25 December 17 256+370 to 256+380 LHS Drain Wall M 25 5305
206 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 658
207 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 1028
208 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 5305
209 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 658
210 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 1028
211 26 December 17 243+390 to 243+400 LHS Drain Wall M 25 658
212 26 December 17 256+820 to 256+850 LHS Drain Raft M 25 5305
213 26 December 17 250+370 to 250+380 LHS Drain Wall M 25 1028
214 26 December 17 250+370 to 250+380 LHS Drain Wall M 25 658
215 26 December 17 VUP 239+050 LHS A1 Pier -3 2nd Lift M-35 5305
216 26 December 17 Box Culvert 257+700 RHS Raft M-30 1028
217 26 December 17 Box Culvert 257+700 RHS Raft M-30 1028
218 26 December 17 Box Culvert 257+700 RHS Raft M-30 658
219 26 December 17 Box Culvert 257+700 RHS Raft M-30 5305
220 26 December 17 YARD 251+950 RHS RE Panal M-35 2649
221 26 December 17 YARD 251+950 RHS RE Panal M-35 2649
222 26 December 17 YARD 251+950 RHS RE Panal M-35 2649
223 26 December 17 YARD 251+950 RHS RE Panal M-35 1028
224 26 December 17 YARD 251+950 RHS RE Panal M-35 658
225 26 December 17 256+540 to 256+580 RHS Drain Raft M 25 1028
226 26 December 17 256+540 to 256+580 RHS Drain Raft M 25 658
227 26 December 17 256+650 to 256+660 LHS Drain Wall M 25 5305
228 27 December 17 256+700 to 256+750 LHS Drain Pcc M-15 5305
229 27 December 17 250+620 to 250+630 RHS Drain Slab M 25 1028
230 27 December 17 250+620 to 250+630 RHS Drain Slab M 25 658
231 27 December 17 243+380 to 243+390 LHS Drain Wall M 25 5305
232 27 December 17 250+850 to 250+880 LHS Drain Slab M 25 658
233 27 December 17 250+350 to 250+360 LHS Drain Raft M 25 1028
234 27 December 17 250+510 to 250+600 RHS Drain Raft M 25 3115
235 27 December 17 VUP 239+050 LHS A1 Pier -1/2- 2nd Lift M-35 1028
236 27 December 17 256+680 LHS/250+850 RHS Drain Slab M 25 5305
237 27 December 17 YARD 251+950 RHS RE Panal M-35 658
238 27 December 17 YARD 251+950 RHS RE Panal M-35 658
239 27 December 17 YARD 251+950 RHS RE Panal M-35 3115
240 27 December 17 YARD 251+950 RHS RE Panal M-35 658
241 27 December 17 YARD 251+950 RHS RE Panal M-35 5305
242 27 December 17 YARD 251+950 RHS RE Panal M-35 5305
243 28 December 17 VUP 239+050 LHS A1 Pier -1/2- 2nd Lift M-35 1028
244 28 December 17 Box Culvert 257+700 RHS Hunch M-30 5305
245 28 December 17 250+350 to 250+360 LHS Drain Slab M 25 658
246 28 December 17 YARD 251+950 RHS RE Panal M-35 658
247 28 December 17 YARD 251+950 RHS RE Panal M-35 3115
248 28 December 17 YARD 251+950 RHS RE Panal M-35 5305
249 28 December 17 YARD 251+950 RHS RE Panal M-35 1028
250 29 December 17 250+380 to 250+400 LHS Drain Slab M 25 658
251 29 December 17 250+700 to 250+710 LHS Drain Wall M 25 3115
252 29 December 17 250+640 to 250+670 RHS Drain Slab M 25 1028
253 29 December 17 250+640 to 250+670 RHS Drain Slab M 25 3115
254 29 December 17 243+300 to 243+340 LHS Drain Raft M 25 5305
255 29 December 17 243+300 to 243+340 LHS Drain Raft M 25 658
256 29 December 17 243+300 to 243+340 LHS Drain Raft M 25 5305
257 29 December 17 256+400 to 256+440 LHS Drain Pcc M 15 658
258 29 December 17 256+580 to 256+630 RHS Drain Raft M 25 1028
259 29 December 17 256+580 to 256+630 RHS Drain Raft M 25 3115
260 29 December 17 256+640 to 256+650 LHS Drain Wall M 25 1028
261 29 December 17 250+520 to 250+540 RHS Drain Wall M 25 3115
262 29 December 17 241+300 to 241+340 RHS Drain Wall M 25 658
263 29 December 17 243+270 to 243+300 LHS Drain Pcc M 15 5305
264 29 December 17 250+350 to 250+360 LHS Drain Wall M 25 1028
265 29 December 17 256+530 to 256+550 LHS Drain Raft M 25 3115
266 29 December 17 250+680 to 250+700 RHS Drain Slab M 25 658
267 29 December 17 YARD 251+950 RHS RE Panal M-35 2649
268 29 December 17 YARD 251+950 RHS RE Panal M-35 1028
269 29 December 17 YARD 251+950 RHS RE Panal M-35 658
270 29 December 17 YARD 251+950 RHS RE Panal M-35 5305
271 30 December 17 256+520 to 256+540 RHS Drain Wall M 25 5305
272 30 December 17 250+250 to 250+275 LHS Drain Pcc M 15 1028
273 30 December 17 256+620 to 256+650 RHS Drain Wall M 25 3115
274 30 December 17 256+660 to 256+690 RHS Drain Pcc M 15 1028
275 30 December 17 256+670 & 256+630 LHS Drain Wall/Raft M 25 3115
276 30 December 17 YARD 251+950 RHS RE Panal M-35 5305
277 30 December 17 YARD 251+950 RHS RE Panal M-35 5305
278 30 December 17 YARD 251+950 RHS RE Panal M-35 1028
279 30 December 17 YARD 251+950 RHS RE Panal M-35 658
280 31 December 17 250+700 to 250+725 LHS Drain Slab M 25 3115
281 31 December 17 250+740 to 250+750 LHS Drain Slab/Wall M 25 5305
282 31 December 17 243+270 to 243+300 LHS Drain Raft M 25 1028
283 31 December 17 256+230 to 256+240 LHS Drain Wall M 25 3115
284 31 December 17 250+320 to 250+332 LHS Drain Wall M 25 3115
285 31 December 17 243+350 to 243+380 LHS Drain Wall M 25 1028
286 31 December 17 YARD 251+950 RHS RE Panal M-35 5305
287 31 December 17 YARD 251+950 RHS RE Panal M-35 658
288 31 December 17 YARD 251+950 RHS RE Panal M-35 5305
289 31 December 17 YARD 251+950 RHS RE Panal M-35 658
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
te Details Month of December- 2017
Slump @ Slump @ Total Qty Cum.
Challan Time Time Time Qty. in
Driver Name Plant in Site in (Per Qty. in
No Dispatch Arrive Unlode M3
MM MM Day) M3

Ramcharan 608 140 120 6.00 6.00


Shashi 610 135 115 2.00 8.00
Shashi 616 100 90 6.00 14.00
Bulkesh 617 100 95 6.50 20.50
Ramcharan 619 130 100 3.50 24.00
Bulkesh 620 140 105 2.50 26.50
Tapan 621 140 105 0.75 27.25
Ramcharan 623 160 130 6.00 33.25
Bulkesh 624 155 125 6.00 39.25
Tapan 625 160 130 6.00 45.25
Ramcharan 627 155 130 6.00 51.25
Bulkesh 628 155 130 6.50 57.75
Tapan 631 160 135 1.00 31.50 58.75
Shashi 626 135 110 6.00 64.75
Tapan 629 130 100 2.00 66.75
Shashi 630 95 85 6.00 72.75
Tapan 632 90 80 6.50 79.25
Ramcharan 633 100 90 6.75 86.00
Bulkesh 634 130 110 6.00 92.00
Tapan 635 125 105 2.00 94.00
Ramcharan 636 125 95 6.00 100.00
Bulkesh 637 120 90 3.00 103.00
Ramcharan 639 120 85 3.00 106.00
Bulkesh 640 130 100 6.00 112.00
Ramcharan 643 125 95 1.00 113.00
Shashi 642 95 80 6.00 119.00
Bulkesh 644 95 85 7.00 126.00
Shashi 645 100 90 6.00 132.00
Ramcharan 646 100 95 3.50 22.50 135.50
Tapan 649 95 80 6.00 141.50
Shashi 650 95 85 5.00 146.50
Shashi 654 100 90 6.00 152.50
Tapan 656 100 95 5.50 22.50 158.00
Ramcharan 651 130 100 6.00 164.00
Bulkesh 652 125 95 6.00 170.00
Ramcharan 655 135 100 6.00 176.00
Ramcharan 657 140 105 2.00 178.00
Ramcharan 658 90 65 6.00 184.00
Shashi 659 95 70 6.00 190.00
Tapan 660 100 80 6.00 196.00
Bulkesh 661 100 85 4.50 22.50 200.50
Shashi 666 90 65 6.00 206.50
Ramcharan 669 95 70 6.00 212.50
Ramcharan 670 100 80 6.00 218.50
Tapan 671 100 85 4.50 22.50 223.00
Bulkesh 673 130 85 5.50 228.50
Ramcharan 674 135 90 6.00 234.50
Ramcharan 675 130 95 6.00 240.50
Bulkesh 676 95 75 6.00 246.50
Tapan 677 100 80 7.00 253.50
Tapan 679 140 105 6.00 259.50
Bulkesh 680 135 100 6.00 265.50
Ramcharan 681 130 95 6.00 271.50
Tapan 682 95 75 6.00 277.50
Ramcharan 683 95 80 7.00 284.50
Bulkesh 684 100 85 7.00 291.50
Ramcharan 685 125 110 1.50 293.00
Tapan 686 165 130 6.00 299.00
Ramcharan 687 160 130 6.00 305.00
Bulkesh 688 160 125 6.00 311.00
Tapan 689 165 125 6.00 317.00
Bulkesh 690 165 130 6.00 323.00
Ramcharan 691 160 130 6.00 329.00
Tapan 692 165 135 6.00 335.00
Bulkesh 693 160 130 6.00 341.00
Ramcharan 694 160 130 3.00 344.00
Tapan 695 155 120 0.75 51.75 344.75
Ramcharan 696 95 80 6.50 351.25
Bulkesh 697 90 75 6.00 357.25
Ramcharan 698 140 115 4.35 361.60
Madan 699 155 105 3.50 365.10
Ramcharan 700 140 110 5.50 370.60
Ramcharan 701 90 70 6.50 377.10
Madan 702 90 70 6.00 383.10
Ramcharan 704 95 75 6.00 389.10
Madan 706 95 80 2.50 391.60
Tapan 705 140 115 3.50 395.10
Ramcharan 708 130 95 3.25 398.35
Madan 710 140 110 4.50 402.85
Ramcharan 712 130 110 5.00 407.85
Tapan 713 135 110 6.00 413.85
Ramcharan 714 90 75 6.00 419.85
Tapan 715 95 80 7.00 426.85
Madan 716 100 85 7.00 433.85
Ramcharan 717 135 115 6.00 439.85
Shashi 718 130 110 2.00 441.85
Tapan 720 140 115 4.50 446.35
Shashi 721 135 110 2.50 448.85
Ramcharan 723 140 105 4.00 452.85
Tapan 724 135 110 6.00 458.85
Ramcharan 727 140 110 4.50 463.35
Ramcharan 728 90 75 7.00 470.35
Tapan 729 95 80 7.00 477.35
Madan 730 100 90 6.50 483.85
Ladura 732 90 70 6.00 489.85
Madan 734 95 75 7.00 496.85
Tapan 735 95 75 6.50 503.35
Shashi 736 100 90 1.50 504.85
Ramcharan 733 130 105 5.20 510.05
Tapan 740 85 75 7.00 517.05
Ladura 744 95 80 6.00 523.05
Madan 745 95 85 6.00 529.05
Shashi 746 95 85 1.50 530.55
Shashi 741 130 105 6.00 536.55
Madan 743 135 110 2.00 538.55
Ramcharan 742 140 110 6.00 544.55
Madan 748 170 130 6.00 550.55
Tapan 749 160 125 6.00 556.55
Shashi 750 160 125 6.00 562.55
Ramcharan 751 165 125 6.00 568.55
Madan 752 165 125 6.00 574.55
Tapan 753 160 120 6.00 580.55
Shashi 755 165 125 6.00 586.55
Ramcharan 756 160 120 6.00 592.55
Tapan 758 160 120 5.00 53.00 597.55
Madan 757 130 105 6.00 603.55
Shashi 759 135 110 1.50 605.05
Ramcharan 760 90 80 6.00 611.05
Ladura 761 95 85 6.00 617.05
Shashi 762 95 85 3.25 620.30
Tapan 763 140 110 4.50 624.80
Ramcharan 765 130 100 6.00 630.80
Shashi 766 135 100 2.00 632.80
Shashi 768 130 90 2.50 635.30
Ramcharan 767 170 130 6.00 641.30
Tapan 771 135 110 7.00 648.30
Ramcharan 773 140 110 6.00 654.30
Ladura 772 85 75 6.00 660.30
Shashi 774 90 80 4.80 665.10
Ladura 775 95 85 6.00 671.10
Madan 776 95 85 5.00 676.10
Ramcharan 777 135 115 4.50 680.60
Tapan 778 140 105 6.00 686.60
Shashi 779 140 110 6.00 692.60
Madan 780 135 105 6.00 698.60
Ramcharan 781 135 105 3.00 701.60
Tapan 782 140 100 4.50 706.10
Ramcharan 784 165 125 2.50 708.60
Ladura 785 85 70 6.00 714.60
Shashi 786 90 75 4.80 719.40
Madan 787 95 80 6.00 725.40
Ladura 788 95 85 5.00 730.40
Tapan 789 95 85 3.00 733.40
Ramcharan 791 140 110 6.00 739.40
Madan 792 135 105 6.00 745.40
Tapan 793 130 95 6.00 751.40
Madan 794 140 90 6.00 757.40
Shashi 795 170 130 3.75 761.15
Ramcharan 796 130 95 6.00 767.15
Ladura 797 85 65 6.00 773.15
Madan 799 90 80 6.00 779.15
Madan 800 95 85 6.00 785.15
Tapan 801 95 85 6.00 791.15
Ramcharan 802 95 85 3.00 794.15
Tapan 807 135 100 6.00 800.15
Tapan 809 85 60 6.00 806.15
Ladura 810 85 65 6.00 812.15
Madan 811 90 70 6.00 818.15
Shashi 812 95 85 6.00 824.15
Ladura 813 95 85 3.50 827.65
Tapan 815 135 95 6.00 833.65
Shashi 816 140 105 4.50 838.15
Tapan 820 135 95 4.00 842.15
Ladura 822 140 100 6.00 848.15
Ramcharan 823 140 105 6.00 854.15
Shashi 824 135 100 5.30 859.45
Ladura 825 90 80 6.00 865.45
Shashi 826 90 80 6.00 871.45
Tapan 827 95 85 6.00 877.45
Ramcharan 829 95 85 6.00 883.45
Ladura 830 95 85 3.00 886.45
Madan 828 140 120 6.50 892.95
Shashi 831 140 110 6.00 898.95
Tapan 838 140 100 4.50 903.45
Shashi 840 135 100 6.00 909.45
Ladura 842 130 95 4.00 913.45
Ladura 845 130 95 4.00 917.45
Ramcharan 844 90 70 6.00 923.45
Madan 846 90 75 6.00 929.45
Ramcharan 847 95 85 6.00 935.45
Ladura 848 95 85 6.00 941.45
Shashi 849 95 85 2.00 943.45
Tapan 850 140 120 6.00 949.45
Madan 851 140 120 6.00 955.45
Ramcharan 853 130 100 6.00 961.45
Madan 854 160 120 6.00 967.45
Madan 855 140 120 0.50 967.95
Tapan 856 145 110 4.00 971.95
Ladura 859 95 85 6.00 977.95
Madan 860 135 100 6.00 983.95
Tapan 861 140 105 6.00 989.95
Shashi 862 140 105 6.00 995.95
Ramcharan 863 145 115 5.50 1001.45
Tapan 864 140 100 3.50 1004.95
Shashi 865 140 110 4.50 1009.45
Ramcharan 866 130 95 6.00 1015.45
Ramcharan 868 140 115 6.00 1021.45
Shashi 869 130 90 3.00 1024.45
Ladura 867 90 70 6.00 1030.45
Ladura 870 90 75 6.00 1036.45
Ladura 873 95 85 6.00 1042.45
Tapan 874 95 85 6.00 1048.45
Shashi 875 95 85 2.80 1051.25
Tapan 877 135 105 3.50 1054.75
Ramcharan 878 170 130 6.00 1060.75
Shashi 879 165 125 6.00 1066.75
Tapan 880 165 130 6.00 1072.75
Ramcharan 881 160 130 6.00 1078.75
Shashi 882 165 125 6.00 1084.75
Ramcharan 883 140 100 3.50 1088.25
Tapan 884 135 100 6.00 1094.25
Shashi 885 140 105 6.00 1100.25
Ramcharan 890 140 100 2.00 1102.25
Tapan 887 165 130 2.25 1104.50
Shashi 888 150 130 6.00 1110.50
Shashi 891 155 130 6.00 1116.50
Ramcharan 892 155 125 6.00 1122.50
Tapan 893 160 130 3.00 1125.50
Ladura 886 90 75 6.00 1131.50
Ladura 889 90 65 6.00 1137.50
Ladura 894 95 60 6.00 1143.50
Shashi 898 95 65 6.00 1149.50
Ramcharan 899 95 65 1.00 1150.50
Shashi 895 135 95 6.50 1157.00
Ramcharan 896 130 90 6.50 1163.50
Tapan 897 140 100 3.50 1167.00
Tapan 900 135 105 6.00 1173.00
Shashi 901 130 90 6.00 1179.00
Ramcharan 903 135 90 2.00 1181.00
Tapan 904 140 100 3.50 1184.50
Ramcharan 905 140 95 6.00 1190.50
Shashi 906 135 90 6.00 1196.50
Madan 908 135 95 6.00 1202.50
Shashi 909 165 125 3.75 1206.25
Tapan 910 130 90 6.50 1212.75
Ramcharan 907 90 65 6.00 1218.75
Ramcharan 911 90 70 6.00 1224.75
Madan 912 95 75 6.00 1230.75
Ramcharan 913 95 75 6.00 1236.75
Tapan 914 95 80 1.00 1237.75
Tapan 915 95 80 0.50 1238.25
Shashi 916 165 125 0.30 1238.55
Tapan 917 160 130 2.70 1241.25
Ramcharan 919 135 100 4.00 1245.25
Ramcharan 920 95 85 7.00 1252.25
Madan 921 95 85 7.00 1259.25
Tapan 922 100 90 7.00 1266.25
Shashi 923 100 90 4.50 1270.75
Ramcharan 924 140 120 3.50 1274.25
Madan 925 145 125 3.50 1277.75
Shashi 926 140 115 6.00 1283.75
Madan 929 140 115 2.00 1285.75
Tapan 927 135 100 6.00 1291.75
Ramcharan 924 140 105 2.00 1293.75
Tapan 932 135 95 2.50 1296.25
Ramcharan 928 135 100 6.50 1302.75
Shashi 930 140 100 6.00 1308.75
Madan 931 140 100 2.00 1310.75
Shashi 934 130 90 3.00 1313.75
Madan 935 135 90 3.00 1316.75
Ramcharan 936 140 90 4.00 1320.75
Tapan 937 145 95 4.50 1325.25
Shashi 939 140 90 2.50 1327.75
Madan 940 135 90 6.50 1334.25
Ramcharan 942 140 95 4.00 1338.25
Ladura 941 95 80 6.00 1344.25
Shashi 943 95 85 6.00 1350.25
Ramcharan 944 100 90 6.50 1356.75
Tapan 945 100 95 7.00 1363.75
Tapan 946 135 90 3.50 1367.25
Shashi 947 145 110 6.00 1373.25
Madan 948 145 90 6.00 1379.25
Shashi 951 145 90 4.00 1383.25
Madan 952 140 90 6.00 1389.25
Tapan 950 95 70 6.00 1395.25
Tapan 953 95 70 6.00 1401.25
Shashi 954 95 75 6.50 1407.75
Ramcharan 955 100 95 7.00 1414.75
Madan 956 135 105 6.00 1420.75
Tapan 957 135 100 6.00 1426.75
Shashi 958 140 110 6.00 1432.75
Madan 960 145 90 3.00 1435.75
Madan 961 135 90 4.00 1439.75
Shashi 962 140 90 6.00 1445.75
Tapan 963 90 65 6.00 1451.75
Ramcharan 964 90 65 6.00 1457.75
Tapan 966 95 70 7.00 1464.75
Ramcharan 967 100 85 6.50 1471.25
1471.25
1471.25