PROGRESS OF WORK DATE: 09-07-2020

Project Physical Achievement Financial Achievement


Date on

month(in lakhs)
cost

Cumulative (in
Cumulative %
Upto previous

Upto previous
No. and Date of which the

Cumulative
During the

During the
month (in
RIDF Name of Project and approved

month

month
Sl. No. G.O by which work is to

lakhs)

lakhs)
Items

(%)
Tranche District by Achievement
A.S. was granted be sanctioned
NABARD
completed
(lakhs)

App.A
Formation of Not completed
bund

RIDF XXI- Infrastructural AppB ,Side


Not completed
Development Works at GO (RT) protection work
Uluvam Muravakulam NO.104/2016 AD
1 RIDF XXI 130.88 42.0 % 10% 52.0 % 1837463.000 0.000 1837463.000
Padasekharam in DATED TVM AppC Engine
Karuvatta Panchayath 10/02/2016 Not completed
thara1
Alappuzha District

Side Protection works going


on.