Hvac 0005

You might also like

Download as pdf
Download as pdf
You are on page 1of 8
Ms: RF Ey Grd P4994 UE) MeN queen ou ay Ue: Trane, Mua) | Role Coager Go| ChaRe Mem | Conte ROE Lot RFI View (Work Inspected-Accepted) Project No: 0-01055:0006, (Contractor RFI Reference: AYCISFB-HVAC-005 Discipline: WAC System Eng. Index: SATIP Ref #:SATIP-K-001-03, Project Phase: INSTALLATION SSATIP Title: HVAC Metal Duc System SAIC Ref #:SAIC-K-4012 ‘SAIC Title:Duct Hangers and Suppots (Including fasteners, et.) ‘Contractor Insp. Level: Scheduled Insp. Date: 01/31/2017 ‘Aramco Insp. Lovel:W ‘Scheduled Insp, Time:3 : 30 AM Equipment 10/eseription Installation Duct Hangers and Supports (including fasteners, et.) QC-MOBIN Layout Drawing No.:vA-430638 Layout Drawing Rev. No: ‘Aramco Activity No.:3.1 Purchase Order No.. Page | of 2 spans Ml ‘Saudi Aramco Plan RFI ‘Loc Description: Fie Station Buiding # 250 G.MA-C/S7) RFL Description; nation Inspection for Duct Hangers and Supports (incising fasteners, ot) ' Exceptions: = — PMT Replies ome Repicay Thai ' = eee ——— =a a 7 SAPIO Repiios ate | Rete p Trea eunoirroesam | "Sc Slaten oe apr nae renee = [SATA Replies - = Bae | repay Tra Tee hnps//qmis.arameo.com.s:1001 gmisv4lsitee_rf_view.asp2_serial_no=B290465 2nn017 QMIS: RFI Bnury Page 20f2 Closing Comments: Instalation done as per standard requirements (Closed Date: 2/1/2017 7:49:55 4M [Teich ise Fer Creckist SAIC KAOTE ex rar stance Pes oxen 8) 403mm Ae BBOS78 emote ty Papen nnn Ss Wee Verio 4.1 eI ra ns OS Hua ese eid asus Doom ‘tps/amis.aramea, com su1 011 Site A_view.aspL serial no~8290465 2nn2017 ’ Omas # F497 REQUEST FOR INSPECTION Sus Aran BY ENG (186) (7220 inseton agra Aut SAE 180 8.1028, setWe WHC 00S” 8 1001055 10 0.010550 Pave __CONST. _Tile_1SF8 INDUSTRI. SUPPORT FACLITES BULONG To:Prjecs apeton nn, F,G4CAZILES [Jom — pee, Jum comms, eect oer WAL Ieper mgd n(n) Z/—/ — stag 2360 pre = tetetsonmioatenenet JacfalaTion for dae duu t hanger, Sef lict Wor Perntrequies: [TJ Yes [oft Project Quality Pen []Hoi Pont ines Pot ‘SAPMT reneseraive hs veiled hat he wrk rei forinepecton ‘CONTRACTOR has vid ta the work be apected| ‘and cofoms the prj requires. 's completa in crmpiance wi th flowing spoons: SAPMT Nanay Vou snessmnsones _ SAES~ K-00), SAICK- 40/2 Siete Gn owe Bir | v7 Contractoncompany AYC Teeshone OSE gery 1s GL cwacnane SMM obin (NOC signatiro oa 3/ NOTE: inspeco’s signatures or roching tis request ony and nt for ésapprova othe wok racy spect, ‘This received ty ha urdrsigedInspecton Deparment eos! 4 Name F-8- GARABILES Sinatxe Dishitulon: A. Cal -Prejet Management 1.1 Copy -Inspocton (0.2 Copy - Contactor + [SAUDI/ARAMGO TYPICAL INSPECTION PLAN [7 vac Metal uct Systm sanipscaotas | s0-Apet3 Hvac 005) = sre fe cre $50 aye =e 7 eee too reo ¥ ‘by be or maneactuer nt mi rent nes é ete me me wo tema oa aiaten ae * | Wen requested by Seu Aramco P10, rave cnet) ” arg acon Kom | aa a ilw ance non fon tna nc ¥ aot cns Pneioe fe | «| 3 ‘emi evs Per it ad Ree we racemes | aa, | Pas ie ” ‘nape ning oaPamin | eae) ae, ‘erp Conner OH a (nes rete ey fen se) Kon eee w snes roe wl w (Stewernaay ne s bectepreraaousonyg | sennnse| Sh, wwe) ae sormer Dimon Testers i penoecisneytpetmcare | she s, " “ emer | Eon aw ice eo a How o Peebanee nmin Be... ee Wines ONS eqennon sa te rstsatne tg ape etnasere, Yon opin ie lbp shdlec WV heGNGE aneraton ‘somo nate 4 noe Cho emaranon sabres tne tmeg taps tas nance. eget on abe cari ie hs OUOE ager ete es, “5 ean Cancer sess ore Satcanracer fe inCreate tae Se of mec sand al AS Page tof ‘yeom07 320M SAUDI ARAMCO INSPECTION CHECKLIST ro Po (Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr-13. HVAC 00S I5FR Bh -dirs ened AYC a a ear pee eae [aowronaanpe sy gc) = gop RM raomEoeennamn jecoscxrnesie feet) 1 rote MOMEOBTET, 6) By te ti ts meer Hole vs ‘CONTRACTOR NEFECTONLEVEL WA w. ig Tew ACCEPTANCE CRITERIA REFERENCE | pase. | Fau| wa [ReAMséoxTe ‘Rectangular duct supports. Supers or rectangular ducts 25 se foth \n Table 6.7 when suspended rorabove shal be nstaled on two ‘SAESK-100 AY Gppaste sides ofeach duct and shal be rvated, tated ormetal screwed | Soction 604.2 ‘ewe of alent mare tan auras seca oto ound dct suppor Hotton ond cts ree {roterm) orion name ven seperded rn he ral be opened stmevaeretmere ann saterh Tan whore | _SAES-100 ng aad aro wears oo secon 21 "TDuta shat be copped wn tgting ocr bands tng tnd nei pern fe act avec sped Newot e ra 2. Grand ea ptt a nh (m vie or SHE8.100 ies nanensnslentotne gage the rato pros senvneor22 E 3 ac rar band sal be prowded wih alae ens ck SAES 110 conmcing wine suserdng trp secon 60023 v SHES 100 {uct shat be bce ard puedo pret or Prao ig | @EAEEEIOO | s3_tzrll Duct halrve a suport within wot ofeach bowand | SAES.C01 ‘iin fat oc earch trectonGMACNA Pte 1) Poo saioe [Soca era ae enable he coca poured snes.¢001 = (SuachaPaw 221) ovata tew e g_Conl lutea shal be elle aftr be concen been poured | SAES-CO01 tnd te forme have bounfemoved.(SMACNA Pare. 5.22) pemsnizes The supe ecg ira and mated of cena wih be et Aa eonch ston tomcedto el eomaratmuesrccnw ture | SHESKOO |, toa (a Pa 8048) a part jeause | action at points toons fe saesicico ar (epon'e20¢7) ase Nola Coneion by galvanic actoncecurs when deslar metals are 2 contact wih each oer “The support system shall ol penevate enclosures conainng fads or |A8 _loctical wing in such a manner erate 8 hazare SAESK-100 oe (UMC Para. 6.204 G) ‘Setar The suppor este shal pnekae abana mera sicha is [pmmmres ban cman cong on entor Same of (uc raee zee) ‘When Dit are suport hal be ae gat he ; ‘10 wallormakimumt away fom wal Wel, or No.8 (Mn) szrew AES ~ ‘may be used as fasteners. (SMACNA FIG 5-9 Note No.2) Page 1 of 1 [SAUDI ARAMCO INSPECTION CHECKLIST pace Pave aeere Ree Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr-13. «HVAC. OCS” Tse ple che jf -e00 4ayl Tew. ti [ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REINSP DATE Fasione (for supporting ducts Fom wall svalbe located winin T ofthe duct edge (wal ede) an within 2° ofthe duct outer edge. Minimum of SAES-K.001 4 ‘on 24" with and up Is required In ation along sides nearest anchors, Para 48.12.56 ~ (SMACNA FIG 5-9) ant Rectangular duct risers from faor shall be supported by angles ‘or channels secured tothe sides of duct wth welds, bolts, sheet metal ‘s2rens, or blind rivets (SMACNA Para 5.2.10) Note SAESK.001 uv "fhe spec ofthe fstners are ro pected shown. then spacog Pra 48.126 ‘sal be asinstucld by Saud Aras. 2: Angle sizes and ter spacing shal be 2s shown onthe Consucon rewings they or rot shown / specie thn ses and spacing shel (boas msiucted by Sau Aramco, ana Round Duets riser rom floor shallbe supported by splt band support by | ‘supplemental angle or channel spanning the slab opening or as | recommended by the menufacturer. Minimum of two fasteners in each half of band is required. (SMAGNA FIG. 5-10) , SAES.K001 1 Not: Para 4.8:12.65 [No.of fastonors and spacing shall boas shown in Construction ‘drawings. f Consiveion drawings do nol address the nuber of the fasteners and/or spacing of them Inn the number ofthe fasteners and spacing shal be as inetricted by Saudi Aramco (SMACNA FIG 6-10) ata eS oe att babe teraasry asscmnoe teres oe te'someny | ,SAESICON, v aber ea auch nes stip [REMARKS: REFERENCE DOCUMENTS: |1-SAES-K-001 ~ Design and Installation of Heating, Ventilating and Air Conditioning Systems, 10 March 2012 |2SAES-K-100 Saueli Aramco Mechanical (HVAC) Code, 31 May 2004 Is-SMACNA.~ HVAC Duct Construction Standards, Metal & Flexible, 2008 Fourth Edition |¢-uniform Mechanical Code (UMC), 2009 IaFTAGHMENTS Table 6€-Due Supports Contractor/ Third-Party Saudi Aramco Fara Repose Tn Representa : cn eee ear LIST CYeneere Yoo Shot mundo gy phe Taw ele 3thihis Jac inspector C Pt Representative sore stay CPAs Tiptree tyr PN risen Joona lacrmmas Teh FE 2 Pamennsooggt OS Loom acai fee | Se / Page 1 of 1 [SAUDI ARAMCO INSPECTION CHECKLIST eee aera ee [Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr-43. HVAC Attachment 1 -- 1997 UNIFORM MECHANICAL CODE TABLE 6-7 Duct Support A. Vertical Ducts Maximum waxirnam ‘Sao of Diameter Rectangusar etal strap or ot hound strap ‘Duct note Bracket ‘Duets Ee ree falvanuned seth Sid! x Tarai /e angie > {0.056 (No. 16 gauRe) ealvanined seth Zid = TAPE NTA NITE angle = 17a steel aE TA/E A 1A/2 617 angle or 176° steel <2 Deere ZAP at/m angie! Over n" BAe me B. Horizontal Ducts 1s 1 an gauge? me gauge on galvanized steel duct rein w Fd oP INe Ve pange patooniend oo" 1x18 gave cel wire on 10" che = etal = Sux PMiscofiNe tesuse ate fsivanustd cel wires e's a vane 2 anda duct or 1 centers « Same pouge an galvanised steel Sua 1378 widcon 6 cs Over ar soaneed tet ©. Horizontal Ducts — Trapeze-Type Supports Maximum Diamater of Round Honzontal ‘Duct or Sige oF ‘Support anger Rectangular Duct ‘Angier 3 Taye NPA x tT 174 round rod or PNT X17 ange Paraue 1/4" round vod or 11/8" angle « Parse 5/16 round sod or ¥ x 1x 1/6" angle Page 1 of 1 nha WeF-2 48L/s | ERENCE ONLY | B0U=2650 REF fa LEE Z amas, i J 150x450, 300=2875 \ 0 as r ! i 0 so7 : ? | trays A= YEN | I ra g. YG fupy Loh inspection Ci + PibeJSt3 Pes i 1} CD-1_ \| 1BHUS | m2) Z] | 50S pea x | — ECD TO EF-4 ‘725L/s ON ROOF = 800=2750 ® +1 | C7 20000 AD — TOREF-40N POOF 2s | | Ww 1100x450 i 00-1 1000x450, 1000x350, ma g B0D=3350 tus BOD=3350 BOD=3350 M62 last) BC 108U8 A [TAG-11 390L/s____ yp — = ‘ 2 r tt sh 0025 z i D z | = J D t sox [FT| A OD ie) |

You might also like