DRTF PLEM Fabrication & Construction PDF
DRTF PLEM Fabrication & Construction PDF
DRTF PLEM Fabrication & Construction PDF
PRESENTATION
“SAFETY IS OUR PRIORITY“
FABRICATION YARD
WORKSHOP
LOCATION :
Lot 12454, Jalan
Pelabuhan Utara,
42000 Port Klang,
Selangor Darul Ehsan,
Malaysia.
FABRICATION YARD
MAIN ENTRANCES
PROJECT STORAGE
AREA
BLASTING
PAINTING AREA
ASSEMBLY AREA
LOAD-OUT AREA
FABRICATION YARD
SAFETY PLAN
YARD HOUSEKEEPING
PLAN
MORNING SECTION EVERNING SECTION
0830 HOURS 1730 HOURS
- AFTER TOOLBOX - BEFORE EOB
WORK PLACE HOUSE KEEPING & WORK PLACE HOUSE KEEPING &
IDENTIFIED HAZARD. IDENTIFIED HAZARD.
FABRICATION TOOLS AND FABRICATION TOOLS AND
EQUIPMENT CHECKING. EQUIPMENT CHECKING.
LIFTING EQUIPMENT CHECKING. LIFTING EQUIPMENT CHECKING.
CAPACITY PLAN
PIPING FABRICATION
CARBON STEEL PIPING STAINLESS STEEL PIPING
ESTIMATE PROJECT DIA. INCH ESTIMATE PROJECT DIA. INCH
2148 DIA.INCH – 27.14 TONS 2395.5 DIA.INCH – 26.18 TONS
PRODUCTION RATE PER DAY : PRODUCTION RATE PER DAY :
25 TO 35 DIA. INCH / TEAM 20 TO 30 DIA. INCH / TEAM
PROPOSE NO. OF TEAM : PROPOSE NO. OF TEAM :
6 TEAM AT PEAK 6 TEAM AT PEAK
NOTE :
PRODUCTION RATE IS INCLUDING MARKING, CUTTING, FIT-UP,
WELDING AND QC INSPECTION.
FABRICATION RECORD.
CAPACITY PLAN
STRUCTURAL FABRICATION
STRUCTURAL 2ND AND TERTIARY STRUCTURAL – PIPE SHOE / SUPPORT
ESTIMATE PROJECT WEIGHT ESTIMATE PROJECT NO. OF SUPPORT
21.3 TONS / 21,300 KG 200 EA
PRODUCTION RATE PER DAY : PRODUCTION RATE PER DAY :
500 – 800 KG / TEAM 5 TO 10 EA / TEAM
PROPOSE NO. OF TEAM : PROPOSE NO. OF TEAM :
3 TEAM AT PEAK 2 TEAM AT PEAK
NOTE :
PRODUCTION RATE IS INCLUDING MARKING, CUTTING, FIT-UP,
WELDING AND QC INSPECTION.
FABRICATION RECORD.
CAPACITY PLAN
BLASTING & PAINTING
PIPING STRUCTURAL – PIPE SHOE / SUPPORT
ESTIMATE PROJECT AREA : ESTIMATE PROJECT AREA :
550 SQM 300 SQM
NOTE :
PRODUCTION RATE IS INCLUDING BLASTING, PAINTING AND QC
INSPECTION.
FABRICATION RECORD.
PROJECT ORGANIZATION CHART
PROJECT MANAGER
QAQC
ENGINEERING CONSTRUCTION COORDINATION
MATERIAL COORDINATOR
DESIGN ENGINEER
CONSTRUCTION
DOCUMENT CONTROL SUPERVISOR
ENGINEER
FOREMAN BLASTER
QAQC INSPECTOR FOREMAN WELDER FOREMAN FITTER FOREMAN RIGGER FOREMAN SCAFFOLDER E&I TECHNICIAN MATERIAL COORDINATOR
PAINTER
STRUCTURAL / PIPE
TECH WEIGHT PAINTER
WELDER
HSE