BULUSAN
CONSTRUCTION
SERVICES
INCORPORATED

Company Profile
CONTENTS

BCS HISTORY ..................................................................................................................................... 3

COMPANY INFORMATION............................................................................................................. 4

COMPANY MANAGEMENT ............................................................................................................. 5

OUR VALUES ...................................................................................................................................... 6

SERVICES OFFERED......................................................................................................................... 7

SUSTAINING PROJECT MANAGERS AND ENGINEERS........................................................... 8

ASSETS/ EQUIPMENT SCHEDULE ............................................................................................... 9

COMPLETED PROJECTS ............................................................................................................... 11

ON GOING PROJECTS .................................................................................................................... 33

CERTIFICATES…………………………………………………………………………………………………….36

BCS 2020 | 2
BCS History

BULUSAN CONSTRUCTION SERVICES INCORPORATED, an emerging


construction company established in 2015 and has been undertaking significant
projects in the Visayas region and has a proven track records of completed projects
in Manila and Luzon.

BULUSAN CONSTRUCTION SERVICES INCORPORATED, a family owned


corporation, started organization and operations in 2006 as a sole proprietor
business by Mr. James Bulusan with Engr. Jeffrey Bulusan and Mark Anthony
Bulusan as the sustaining technical officers

The group has been engaged on sub-contracting works for various large scale
projects, partnering with Category AAA contractors. The company honed its
technical skills and competence engaging on structural works such as high-rise
building rebar installations, formworks and concreting works. The company has been
also engaged on architectural finishing works for high rise condominiums and
commercial buildings.

In 2012, with all the experience, assets and advanced technical work group, BCS
expanded and engaged projects such as Design and build projects, Land
Development and Earthworks.

By the end of 2015, the company registered as a listed Philippine corporation and
started engaging on large scale Land Development Works, General building and
mass housing projects in Visayas region.

BULUSAN CONSTRUCTION SERVICES INCORPORATED, a company with


technically capable and progress driven team, with proven track records and a solid
financial structure, an ethically and GOD centred organization ready to take on any
projects with high spirit and a vision of success for perpetual gains of its clients and
partners.

BCS 2020 | 3
Company Information

Registered Business Name: : BULUSAN CONSTRUCTION SERVICES, INC.

Business Address

o Manila Office B1 L3 Pantabangan St. NIA Village, Brgy. Sauyo,


Quezon City

o Cebu Office 516B Burgos St. Brgy. Dumlog Talisay City, Cebu

Email Address : bulusanconstruction@gmail.com

Telephone Number : 032-349-25-99 / 032-238-49-20 / 09175583408

SEC Reg. No. : CS201524367

TIN Reg No. : 009-189-428

PCAB License No. : 34701

BCS 2020 | 4
Company Management

Chairman of the Board: James O. Bulusan Mobile: (+63) 917-8142044

President: Engr. Jeffrey Bulusan Mobile: (+63) 917-5583408

Vice- President: Mark Anthony E. Bulusan Mobile: (+63) 917-8142043

Treasurer: Anna Sheryll S. Bulusan Mobile: (+63) 917-6082799

Secretary: Mary Jane B. Asuncion Mobile: (+63) 917-8520329

BCS 2020 | 5
Our Values

Commitment, Integrity, Hard work, Precision and Best quality of workmanship –


these are the principles and values we believe in. The same principles and values
that we have today that have guided us throughout the years, from project to project,
from one satisfied customer to another.

BCS 2020 | 6
Services Offered

 General Building works


 Structural and Architectural works
 Land Development Works
 Excavation and Hauling works
 Demolition Works
 Slope Protection Works

BCS 2020 | 7
Sustaining Project Managers and Engineers

Senior Project Director Engr. Jeffrey Bulusan CE

Project Manager Engr. Joseph Odinada CE

Senior Project Engineer Engr. Claro Adobas CE

Project Engineer Engr. Jeffrey Rillo CE

QS/ Project Engineer Engr. Jensen Cantillo CE

Project Engineer Engr. William Enfermo EE

Project Engineer Engr. John Laurence Barcibal EE

BCS 2020 | 8
Assets/ Equipment Schedule

DESCRIPTION QUANTITY
Construction Equipment
Concrete Vibrator 4 units
1 & 1/2 Bagger Concrete Mixer 8 units
Electric Hand Drill 8 units
Electric Grinder 4”  12 units
Electric Grinder 7”  2 units
Welding Machine 3 units
Compressor 4 units
Power Sprayer 2 units
14" Cut off rebar cutter 2 units
Submersible Pump 2”  4 units
Submersible Pump 3”  2 units
Hydraulic Rebar Bender 32mm  max 1 unit
Hydraulic rebar cutter 32mm  max 1 unit
Handheld Breakers 6 units
Stonex Digital Level 2 unit
Digital Multi line laser 1 unit
Stonex Total Station 2 units
Gasoline fed Generator (8 kVA) 1 unit
Diesel Operated Generator (15 kVA) 1 unit
Diesel Operated Generator (8 kVA) 2 units
Plain Compactor 7hp 1 unit
Walk behind compactor Bomag 3 units
Tampering Rammer FUJI 2 units
Concrete Screeder ROBIN 3 units

Service Vehicles
Toyota Rav 4 1 unit
Toyota Hilux 1 unit
Isuzu Mini Dump Truck 4hf1 1 unit
Isuzu Mini Dump Truck 4hf1 1 unit
Mitsubishi L300 Van 1 unit
Suzuki Multicab 2 unit
Hyundai H100 Van 1 unit

BCS 2020 | 9
DESCRIPTION QUANTITY
Heavy Equipment
PC-100-3 Komatsu Excavator w/ breaker 1 unit
PC-200-8 Komatsu Excavator w/ breaker 2 unit
PC-60w Komatsu Excavator 1 unit
Hyundai 330 w/ vibro 2 unit
JCB 205LC 2 unit
Hyundai 220 Excavator w/ vibro 1 unit
Pc-250 Komatsu Excavator w/ vibro 1 unit
JCB205LC Excavator 1 unit
D2A Komatsu Bulldozer 1 unit
D20 Komatsu Bulldozer 1 unit
Lonking Grader 1 unit
Transit Mixer 1 unit
TCM Skid Roller 1 unit
10 Wheeler Dumptruck 10 unit
10T- XCMG Road Roller 1 unit
6T Komatsu Road Roller 1 unit
5T- Kawasaki Road Roller 1 unit
Airman Compressor Jackhammer 1 unit

B C S 2 0 2 0 | 10
Completed Projects

B C S 2 0 2 0 | 11
SM MAKATI MALL EXPANSION

Location: Makati City


Client: SM Holdings
Project Duration: June 2002 – October 2004
Project Cost: Php 4,0oo,000
Project Description:
 Demolition and clearing of the 33.0 m x 42.0 m mezzanine area of the SM Main
Building.
 Demoliton of existing food court area.
 Demolition/Opening of 18.0 m x 15.0 m on every floor of the SM Main Building
for the provision of additional escalators.
 Demolition of the existing floor stairs, facilities room, floor slabs (duct chase/
partition walls, etc.
 Demolition of the perimeter concrete dropwall canopy of the SM Main
Building and Annex for the installation of the new composite panel.
 Pre-tensioned and post-tensioned structural beams/girders, de-tension
planning and implementation.
 Disposal of debris and demolition by-products.

ADMINISTRATION OFFICE

Location: Valle Verde 1 Park, Brgy. Ugong, Pasig City


Owner: First Valle Verde Home Owners Association
Project Duration: January 2004 – March 2004
Project cost: Php 500,000
Project Description:
 Construction of the Administration Office Extension, including detailed
finishes, painting, electrical, and plumbing works.

B C S 2 0 2 0 | 12
RENOVATION WORKS: 2-STOREY RESIDENTIAL

Location: 1 Suha St. Valle Verde 1, Brgy. Ugong, Pasig City


Owner: Mr. Nestor Tan
Project Duration: April 2004 – May 2004
Project Cost: Php 250,000
Project Description:
 Renovation of the 2-storey residential house.
 Interior repair/replacement/rehabilitation of every section of the
house as specified.
 Replacement of ceiling panels including wood cornice and mouldings.
 Repairs of wood/metal cabinet and table fixtures.
 Repair/Replacement of damaged TNG floors and marble components
(Floors/Counters/Sinks).
 General repainting works.
 Re-polishing works on TNG and marble floors.

ADMINISTRATION SECURITY OFFICE

Location: Valle Verde 1, Bgry. Ugong, Pasig City


Owner: First Valle Verde Home Owners Association
Project Duration: August 2004 – September 2004
Project Cost: Php 100,000
Project Description:
 Renovation works.
 Replacement of roof ceramic tile system and rehabilitation of truss/roofing
system components.
 Replacement of access doors and cabinet fixtures.
 Repairs on electrical and plumbing systems.
 Repainting works.
 Modified the design of Piña Access Gate into a two-way folding gate.

B C S 2 0 2 0 | 13
APARTMENT UNIT RENOVATION WORKS

Location: #7 Isarog St. Sampaloc, Manila


Client: Mr. Ronald Relos
Project Duration: June 2004 – August 2004
Project Cost: Php 250,000
Project Description:
 Renovation of the 4-unit apartment.
 Adjustment/Reconstruction of unit walls and unit wall components.
 Reconstruction of individual unit roofing system.

BADMINTON COURTS

Location: Valle Verde 1 Park, Brgy. Ugong, Pasig City


Owner: Speed Courts Incorporated
Project Duration: January 2005 - February 2005
Project Cost: Php 500,000
Project Description:
 Renovation works.
 Structural columns retrofit.
 Construction of court Comfort Rooms.
 Reconstruction of the roof and ceiling sections at the Lounge Area.
 General painting works.

B C S 2 0 2 0 | 14
2-STOREY RESIDENTIAL HOUSE

Location: 10 Macopa St. Valle Verde 1, Brgy. Ugong, Pasig City


Owner: Mrs. Gloria T. Barriero
Project Duration: April 2005 – October 2005
Project Cost: Php 2,500,000
Project Description:
 Renovation works.
 Interior repair/replacement/rehabilitation of every section of the unit as
specified.
 Roofing system components replacement.
 Architectural design revision (interior/exterior).
 Electrical/Plumbing/Landscaping works.

2-STOREY RESIDENTIAL HOUSE

Location: Unit 914 Parc Chateau Condominium, Ortigas, Pasig City


Owner: Mrs. Marina Cendana
Project Duration: December 2005 – January 2006
Project Cost: Php 250,000
Project Description:
 Renovation works.
 Interior repair/replacement/rehabilitation of every section of the unit as
specified.
 Architectural design revision (interior/exterior).
 Electrical/Plumbing works.

B C S 2 0 2 0 | 15
RENOVATION WORKS: 2-STOREY RESIDENTIAL HOUSE

Location: 20 Macopa St. Valle Verde 1 Brgy. Ugong Pasig City MM Philippines
Owner: Mr. Eduardo Tintoc
Project Duration: October 2005 – December 2005
Project Cost: Php 200,000
Project Description:
 Renovation works.
 Interior repair/replacement/rehabilitation of every section of the house as
specified.
 Architectural design revisions (interior/exterior).
 Electrical/Plumbing works.

LEE TOWER CONDOMINIUM

Location: Gandara St., Binondo, Manila


General Contractor: HILMARC’S CONSTRUCTION CORPORATION
Project Duration: June 2004 – October 2006
Project Cost: Php 10,000,000
Project Description:
 Masonry works at condo units (CHB 6”and CHB 4”).
 Plastering of RC members, masonry walls, Hall way, and various areas like both
sides of fire escape from ground floor to 33rd floor.
 General tiling works (Condo units/ Toilets/ Corridors/ Ultility areas)
 Floor vinyl installations.
 Various demolition and labor works.

B C S 2 0 2 0 | 16
4-STOREY RESIDENTIAL HOUSE CONSTRUCTION

Location: 55 Victory Avenue Tatalon, Quezon City


Owner: Mr. and Mrs. Roel Salvador
Project Duration: August 2007 – December 2007
Project Cost: Php 1,500,000
Project Description:
 Demolition of the existing 2-storey residential house, clearing, hauling, and
disposal.
 Structural and architectural design.
 General construction from foundation to finishing of ground floor.

OLMA BLDG.

Location: Imus, Cavite


General Contractor: Building Beaver Corporation
Project Duration: September 2006 – January 2007
Project Cost: Php 4,000,000
Project Description:
 Renovation works.
 Masonry works (CHB 6” and CHB 4”).
 Plastering of RC members, masonry walls.
 General tiling works.
 Floor vinyl installations.
 Structural works (formworks, rebar, concreting, plastering of elevator shaft,
stairs, structural beams/columns, etc).

B C S 2 0 2 0 | 17
GMA ANNEX BUILDING

Location: Timog Ave. cor. Edsa, Quezon City


General Contractor: Hilmarc’s Construction Corporation
Project Duration: October 2006 – February 2007
Project Cost: Php 500,000
Project Description:
 Earthworks.
 Trimming of isolated footing, footing Tie-Beam, etc.

PROPOSED REHABILITATION OF RIZAL MUTLI-PURPOSE BUILDING

Location: Shaw Blvd., Mandaluyong City


General Contractor: Hilmarc’s Construction Corporation
Project Duration: February – July 2007
Project Cost: Php 1,000,000
Project Description:
 Various labor and earth works.
 Demolition of masonry walls, concrete, slab, topping.
 Dismantling of cyclone fence, ceiling and various carpentry fixtures.
 Excavation of isolated footing, trimming.

MAKATI BLISS BUILDING (28, 29,30)

Location: Guadalupe, Makati


General Contractor: Building Beaver Construction
Project Description:
 Excavation works.
 Civil/ Masonry works.
 Interior and Fitout Works

B C S 2 0 2 0 | 18
3-STOREY BLDG. at POLYTECHNIC UNIVERSITY OF THE PHILIPPINES (PUP)

Location: PUP Compound, Pureza St., Sta. Mesa, Manila


General Contractor: Building Beaver Corporation
Project Duration: March – October 2007
Project Cost: Php 1,500,000
Project Description:
 Earthworks
 Demolition works
 Civil/ Masonry Works
 Interior and Fitout works

BALIUAG STATE UNIVERSITY

Location: Baliuag, Bulacan


General Contractor: Building Beaver Construction
Project Duration: May – September 2007
Project Cost: Php 1, 800, 000
Project Description:
 Earthworks
 Demolition works
 Civil/ Masonry Works
 Interior and Fitout works

B C S 2 0 2 0 | 19
MARIUS ARCADIA BUILDING

Location: Pasig City


General Contractor: Building Beaver Construction
Project Duration: May – September 2007
Project Cost: Php 1, 800, 000
Project Description:
 Excavation works.
 Civil/ Masonry Works
 Interior and Fitout works

LEGISLATIVE, POLICE STATION AND SITE DEVELOPMENT


AT VALENZUELA CITY HALL (VALENZUELA CITY)

Location: Mac- Arthur Highway, Valenzuela City


General Contractor: Building Beaver Corporation
Project Duration: October 2009 – May 2010
Project Cost: Php 7,000,000
Project Description:
 Earthworks
 Demolition works
 Civil/ Masonry Works
 Interior and Fitout works

B C S 2 0 2 0 | 20
RENOVATION AND REHABILITATION OF ONE (1) UNIT DENTAL CLINIC

Location: 507 President Tower, Timog Ave., cor Ybardolaza st., Quezon City
Owner: Dra. Maridin M. Lacson (Vice President of PDA).
Project Duration: October 2010 – December 2010
Project Cost: Php 1,000,000.00
Project Description:
 Demolition works
 Civil/ Masonry Works
 Interior and Fitout works
 Electrical works.
 Mechanical/ Air conditioning system works
 Plumbing and sanitary.

RENOVATION AND REHABILITATION OF TRINITAS COLLEGE

Location: Trinitas Complex, Pantoc rd., Pantoc Meycauayan Bulacan


Owner: Hilmarc’s Construction Corporation
Project Duration: April 2011 – May 2011
Project Cost: Php 1,000,000
Project Description:
 Earthworks
 Demolition works
 Civil/ Masonry Works
 Structural Rebar works
 Interior and Fitout works
 Electrical works
 Mechanical works
 Plumbing and sanitary

B C S 2 0 2 0 | 21
BANGUED ABRA PROVINCIAL HOSPITAL

Location: Brgy. Calaba, Bangued Province of Abra


General Contractor: Building Beaver Corporation
Project Duration: July 2010 – May 2011
Project Cost: Php 5,000,000
Project Description:
 Earthworks
 Demolition works
 Civil/ Masonry Works
 Interior and Fitout works

BATASAN COMPLEX SOUTH WING BUILDING

Location: Batasan Complex, Fairview Qc


General Contractor: Building Beaver Construction
Project Duration: June – August 2011
Project Cost: Php 1, 500, 000
Project Description:
 Earth works.
 Demolition works
 Site development works
 Masonry works.

B C S 2 0 2 0 | 22
VALENZUELA WEST EMERGENCY HOSPITAL

Location: Valenzuela City


General Contractor: Building Beaver Construction
Project Duration: February 2012 – November 2012
Project Cost: Php 3, 500, 000
Project Description:
 Earth works.
 Demolition works
 Site development works
 Masonry works.
 Road and Drainage works

BATASAN COMPLEX NORTH WING BUILDING

Location: Batasan Complex, Fairview Qc


General Contractor: Building Beaver Construction
Project Duration: June 2012 – August 2012
Project Cost: Php 1, 500, 000
Project Description:
 Earth works.
 Demolition works
 Site development works
 Masonry works.
 General Tiling works.

B C S 2 0 2 0 | 23
OUR LADY OF GUADALUPE SCHOOL

Location: Mexico, Pampanga


General Contractor: Bulusan Construction Services
Project Duration: August 2012– January 2013
Project Cost: Php 4, 500, 000
Project Description:
 Demolition works
 Civil/ Masonry Works
 Interior and Fitout works
 Masonry works.
 Painting Works

ELTRINITAS RESIDENCIAL SUBDIVISION

Location: San Pedro, Laguna


General Contractor: Hilmarc’s Land Development Corporation
Project Duration: September 2012 – November 2012
Project Cost: Php 1, 500, 000
Project Description:
 Bulk Excavation works.

TINAMBAC PUBLIC MARKET

Location: Tinambac, Brgy. Poblacion Camarines Sur


General Contractor: Building Beaver Construction
Project Duration: December 2013 – November 2014
Project Cost: Php 10, 500, 000
Project Description:
 Earth works.
 General Structural works.
 Architectural works.
 Design and build works.

B C S 2 0 2 0 | 24
MANILA BAY RESORT

Location: Brgy. Tambo, Don Galo, Manila


General Contractor: Building Beaver Construction
Project Duration: January 2012 – February 2013
Project Cost: Php 3, 500, 000
Project Description:
 Bulk Excavation works.
 Structural Rebar works.

PASIG DOCTOR’S MEDICAL CENTRE

Location: Manggahan St, Pasig City


General Contractor: Building Beaver Construction
Project Duration: January 2013 – February 2013
Project Cost: Php 1, 500, 000
Project Description:
 Bulk Excavation works.

UST-HOSPITAL EXTENSION

Location: España, Manila


General Contractor: Building Beaver Corporation
Project Duration: August 2013 – October 2013
Project Description:
 Excavation Works.
 Demolition works

B C S 2 0 2 0 | 25
CONSTRUCTION OF THREE (20) PRODUCTION UNITS MODEL CYPRESS 2G

Location: Corona Del Mar VI-Escala Talisay, Cebu


General Contractor: Filinvest Land Incorporated
Project Duration: August 2013 – February 2016
Project Cost: Php 35,000,000
Project Description:
 General Residential/ Building Works

CONSTRUCTION OF TWO (12) PRODUCTION UNITS MODEL MOLAVE SD

Location: Corona Del Mar VI – Escala, Talisay, Cebu


General Contractor: Filinvest Land Incorporated
Project Duration: August 2013 – February 2016
Project Cost: Php 10, 800, 000
Project Description:
 General Residential/ Building Works

CONSTRUCTION SEWER TREATMENT PLANT

Location: Corona Del Mar VI – Escala, Talisay, Cebu


General Contractor: Filinvest Land Incorporated
Project Duration: July 2014 – October 2015
Project Cost: Php 1,500,000.00
Project Description:
 Structural Works
 Plumbing/ Piping Works

B C S 2 0 2 0 | 26
ESCALA SITE DEVELOPMENT WORKS

Location: Corona Del Mar VI – Escala, Talisay, Cebu


General Contractor: Filinvest Land Incorporated
Project Duration: July 2015 – February 2016
Project Cost: Php 2,500,000.00
Project Description:
 Roadworks
 Drainage System
 Perimeter Fence

IL CORSO LAND DEVELOPMENT WORKS

Location: SRP, Cebu City Il Corso


Client: Asdec Builders Corporation
Project Duration: June 2015 – October 2016
Project Cost: Php 46,000,000.00
Project Description:
 Site Development Works
 MEPF

IL CORSO HARDCAPING WORKS

Location: SRP, Cebu City Il Corso


Client: Asdec Builders Corporation
Project Duration: July 2015 – February 2016
Project Cost: Php 15,000,000.00
Project Description:
 Decorative Concrete floor finishes
 Civil works/ Hardscaping works

B C S 2 0 2 0 | 27
IL CORSO CISTERN/ RAINWATER TANK

Location: SRP, Cebu City Il Corso


Client: Asdec Builders Corporation
Project Duration: October 2016 – March 2017
Project Cost: Php 2,500,000.00
Project Description:
 Structural Works
 MEPF Works

IL CORSO SEWER HOLDING TANKS

Location: SRP, Cebu City Il Corso


Client: Asdec Builders Corporation
Project Duration: October 2016 – March 2017
Project Cost: Php 3,000,000.00
Project Description:
 Structural Works
 MEPF Works

IL CORSO ROAD/ DRAINAGE REHABILIATION DPWH

Location: SRP, Cebu City Il Corso


Client: Asdec Builders Corporation
Project Duration: September 2016 – January 2017
Project Cost: Php 3,000,000.00
Project Description:
 Drainage System Works
 Road Works
 Civil Works

B C S 2 0 2 0 | 28
FUTURA HOMES MACTAN FULL LAND DEVELOPMENT WORKS

Location: Brgy Subabasbas, Mactan Cebu City


Client: Asdec Builders Corporation
Project Duration: November 2015 – November 2016
Project Cost: Php 26,000,000.00
Project Description:
 Road network.
 Drainage System
 Waterline System
 Sewerage System

FUTURA HOMES MACTAN – ENTRANCE GATE AND GUARDHOUSE

Location: Brgy Subabasbas, Mactan Cebu City


Client: Filinvest Land Inc.
Project Duration: June 2016 – November 2016
Project Cost: Php 1, 000, 000
Project Description:
 Construction of Entrance Gate and Guard House.

MARINA SPATIAL MODEL UNIT/ MARKETING OFFICE

Location: Dumaguete City


Client: Filinvest Land Inc.
Project Duration: October 2016 – December 2016
Project Cost: Php 3,000,000.00
Project Description:
 Construction of Model Unit.
 Civil works

B C S 2 0 2 0 | 29
FUTURA HOMES MACTAN - HOUSING PROJECT (96 units)

Location: Brgy Subabasbas, Mactan Cebu City


Client: Filinvest Land Inc.
Project Duration: April 2016 – May 30, 2017
Project Cost: Php 28, 800, 000.00
Project Description:
 Construction of 30sqm Socialize Housing Unit

FUTURA HOMES MACTAN – MARKETING OFFICE

Location: Brgy Subabasbas, Mactan Cebu City


Client: Filinvest Land Inc.
Project Duration: October 2016 – February 2017
Project Cost: Php 1, 800, 000
Project Description:
 Construction of Marketing Office.

FUTURA HOMES MACTAN – CISTERN TANK AND PUMP ROOM

Location: Brgy Subabasbas, Mactan Cebu City


Client: Filinvest Land Inc.
Project Cost: Php 3, 200, 000.00
Project Description:
 Construction of Cistern Tank and Pump Room.

B C S 2 0 2 0 | 30
FUTURA HOMES MACTAN - HOUSING PROJECT (15 units) (completed)

Location: Brgy Subabasbas, Mactan Cebu City


Client: Filinvest Land Inc.
Project Cost: Php 4,500,000.00
Project Description:
 Construction of 30sqm Socialize Housing Unit

IL CORSO FULL LAND DEVELOPMENT WORKS

Location: SRP, Cebu City


Client: Asdec Builders Corporation
Project Cost: Php 92, 000, 000
Project Description:
(Joint Venture w/ ASDEC BUILDERS CORP)
 Road network.
 Drainage System
 Waterline System
 Sewerage System

FUTURA HOMES MACTAN OPEN SPACE AND AMENETIES PROJECT

Location: Brgy Subabasbas, Mactan Cebu City


Client: Filinvest Land Inc.
Project Cost: Php 8, 000, 000
Project Description:
 Construction of Clubhouse/ Basketball Court/ Open space amenities.

B C S 2 0 2 0 | 31
FLI BACOLOD SALES AND MARKETING OFFICE

Location: Josmon Building Lascson Street Bacolod City


Client: Filinvest Land Inc.
Project Cost: Php 4,000,000.00
Project Description:
 Construction of Sales and Marketing Office.

FUTURA HOMES MACTAN – PHASE 2 HOUSING PROJECT (41 UNITS)

Location: Brgy Subabasbas, Mactan Cebu City


Client: Filinvest Land Inc.
Project Duration: April 2016 – May 30, 2017
Project Cost: Php 14,620,000.00
Project Description:
 Construction of 30sqm Socialize Housing Unit

B C S 2 0 2 0 | 32
On Going Projects

B C S 2 0 2 0 | 33
Basement Ramps One Oasis Cebu

Location: Mabolo, Cebu City


Client: Filinvest Land Inc.
Project Cost: Php 4,000,000.00
Project Description:
 Road network/ Basement Ramps
 Drainage System
 Waterline System
 Sewerage System

Filinvest Cyberzone Excavation and Slope Protection Works

Location: IT Park, Lahug Cebu City


Client: Asdec Builders Corp.
Project Cost: Php 45,000,000.00
Project Description:
 Slope Protection Works
 Excavation Works

Mandani Bay Sheet Pile Driving

Location: Mandaue City Cebu


Client: Asdec Builders Corp.
Project Cost: Php 20,000,000.00
Project Description:
 Slope Protection Works
 Excavation Works

B C S 2 0 2 0 | 34
8Starpark 3- Storey Commercial Building 8Starland

Location: Bgry Kalubihan, Cebu City


Client: 8Starland Development Corporation
Project Cost: Php 75,000,000.00
Project Description:
 General Building Works
 Site Development Works
 MEPF Works

Futura Homes Bacolod Site Development Works

Location: Silay Bacolod City


Client: Asdec Builders Corp.
Project Cost: Php 89,500,000.00
Project Description:
 Land Development Works
 Retaining Wall
 Waterline and Drainage works

B C S 2 0 2 0 | 35
Company Certificates

B C S 2 0 2 0 | 36
B C S 2 0 2 0 | 37
B C S 2 0 2 0 | 38
B C S 2 0 2 0 | 39
B C S 2 0 2 0 | 40
B C S 2 0 2 0 | 41
B C S 2 0 2 0 | 42

You might also like