MSS Mix Design Gradation

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 4

Four Laning of Reengus to Sikar Section From Km. 298.075 Near Madhopura Junction to Km. 341.

047 (After Sikar Town) of NH-11 (Proposed Chainage Km 298.075 to


Km. 341.962) (Design Length Km. 43.887) in The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase-III

NHAI CONCESSIONAIRE INDEPENDENT ENGINEER

CONTRACTOR : G R INFRAPROJECTS LTD.


MORTH Table - 500 - 26 (Type - B)
COMBINED GRADATION FOR MSS
Aggregates 0 0 0 13.2 11.2 5.600 2.800 0.09 Blend 0 0 0 13.2 11.2 5.600 2.800 0.09
10 mm 0.00 0.00 0.00 100.00 93.92 3.39 1.39 0.99 50% 0.00 0.00 0.00 50.00 46.96 1.70 0.70 0.50
6 mm 0.00 0.00 0.00 100.00 100.00 69.04 6.05 0.69 36% 0.00 0.00 0.00 36.00 36.00 24.85 2.18 0.25
Stone Dust 0.00 0.00 0.00 100.00 100.00 100.00 99.38 21.61 14% 0.00 0.00 0.00 14.00 14.00 14.00 13.91 3.03
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 100% 0 0.00 0.0 100 96.96 40.6 16.8 3.8
Mid Limit 0 0 0 100 94 41.5 15 2.5
Limits 0 0 0 100 88 - 100 31 - 52 5 - 25 0-5

Is sieves 45 37.5 26.5 13.2 4.75 2.360 0.300 0.075


Middle Limit 100 97.5 78 65 COMBINED
46 35 14
GRADATION 5
FOR MSS
Actual
120 0 0 0 100 97 41 17 4
Upper 100 100 93 75 54 42 21 8
%age Passing

Lower 100 95 63 55 38 28 7 2

100 166.0
83.00

80

60

40

20

0
0.01 0.1 1 10 100
Sieve Size (mm)

TESTED BY(GRIL) CHECKED/APPROVED BY(RSEL) REVIEWED BY(IE)

SIGN: SIGN: SIGN:

NAME: NAME: NAME:


Four Laning of Reengus to Sikar Section From Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) of
NH-11 (Proposed Chainage Km 298.075 to Km. 341.962) (Design Length Km. 43.887) in The State of Rajasthan on BOT
(Annuity) Project on DBFOT Pattern Under NHDP Phase-III

NHAI CONCESSIONAIRE INDEPENDENT ENGINEER

CONTRACTOR : G R INFRAPROJECTS LTD.


MORTH clause - 512.2.5 (Type - B)
Bitumien Content

1 Aggregate use Meter per 10 m2 Area 0.27 m3

2 Bitumien use Meter per 10 m2 Area 19 Kg.

3 All Mix Aggregate Compacted Density (g/cc) 1.871

4 Total use aggregate (10mm,6mm,Stone Dust) =( 0.27*1.871)*1000 (Kg) 505.17

5 Total wt. of mix (Kg) 524.17

6 Bitumien Binder Contant =( 19/524.17)*100 (%) 3.62

7 Bitumien Binder Contant (%) 3.62 3.60

Remarks

TESTED BY(GRIL) CHECKED/APPROVED BY(RSEL) REVIEWED BY(IE)

SIGN: SIGN: SIGN:

NAME: NAME: NAME:


Four Laning of Reengus to Sikar Section From Km. 298.075 Near Madhopura Junction to Km.
341.047 (After Sikar Town) of NH-11 (Proposed Chainage Km 298.075 to Km. 341.962) (Design
Length Km. 43.887) in The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under
NHDP Phase-III
NHAI CONCESSIONAIRE INDEPENDENT ENGINEER

CONTRACTOR : G R INFRAPROJECTS LTD.


AVERAGE OF ACTUAL GRADATION (MSS)
MORTH Limits
IS Sieve
TRAIL -1 TRAIL - 2 TRAIL - 3 AVERAGE 500 - 26
(mm)
(Type - B)

13.20 100.0 100.0 100.00 100.00 100

11.20 97.29 95.72 96.33 96.45 88 - 100

5.60 41.62 39.46 40.07 40.38 31 - 52

2.80 16.77 18.29 17.40 17.49 5 - 25.

0.090 3.82 3.17 3.69 3.56 0-5

120
COMBINED GRADATION FOR MSS

100

80
%age Passing

166.0
83.00

60

40

20

0
0.01 0.1 1 10 100

Sieve Size (mm)

TESTED BY(GRIL) CHECKED/APPROVED BY(RSEL) REVIEWED BY(IE)

SIGN: SIGN: SIGN:

NAME: NAME: NAME:


Four Laning of Reengus to Sikar Section From Km. 298.075 Near Madhopura Junction to Km. 341.047
(After Sikar Town) of NH-11 (Proposed Chainage Km 298.075 to Km. 341.962) (Design Length Km.
43.887) in The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase-III

NHAI CONCESSIONAIRE INDEPENDENT ENGINEER

CONTRACTOR : G R INFRAPROJECTS LTD.


SUMMARY OF MSS MIX DESIGN
SOURCE OF AGGREGATE:BALA JI
ACTUAL COMBIND GRADATION
MORTH Limits 500 - 26
IS Sieve
Average Passing (%) Mid Value (Type - B)
(mm)
COMBINED GRADATION FOR MSS
%age Passing

120
13.20 100.0 100.00 100
100

11.20
80
96.45 94.00 88 - 100
60
5.60 40.38 41.50 31 - 52
40

2.80
20
17.49 15.00 5 - 25.

0
0.090
0.01 0.1
3.56 Sieve Size (mm)
1 10
2.50
100
0-5

166.0
83.00

BLEND OF AGGREGATE
TYPE OF AGGREGATE % OF MATERIAL SOURCE OF AGGREGATE
10.0 MM 50.0 CHOUKDI
6.0 MM 36.0 CHOUKDI
STONE DUST 14.0 CHOUKDI
SUMMARY OF RESULTS
No. DESCRIPTION SPECIFIED LIMIT RESULTS
1 Optimam Binder Content 3.60%

2 Average AIV (%) ≤ 30.00 18.98


3 Flakiness & Elongation Index (%) ≤ 30.00 (%) 22.90
4 Polished Stone Value, PSV Min. 55 56.00.
5 Water Absorption (%) ≤ 2.00 0.82
6 Retained Coating Value (%) ≥ 95.00 97.75%

TESTED BY(GRIL) CHECKED/APPROVED BY(RSEL) REVIEWED BY(IE)


SIGN: SIGN: SIGN:
NAME: NAME: NAME: