Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

 

 
UPGRADING PUNALUR TO PONKUNNAM ROAD (SH 8) ‐ PACKAGE 8C: KM 60+000 (PLACHERRY) TO KM 82+173 (PONKUNNAM) ON 
ENGINEERING, PROCUREMENT, CONSTRUCTION (EPC) 
 
 
 
 
 
 
 
 
GOOD FOR CONSTRUCTION DRAWINGS (BOX CULVERTS & PIPE CULVERTS – 40 Nos) 
 
 
 
 
   July‐2020       
 
 
  
 
 
 
 
 
 
 
 
 
 
 
CLIENT:‐    KERALA STATE TRANSPORT PROJECT 
 

EPC CONTRACTOR:‐   SREEDHANYA NATH JV. 

PROOF CONSULTANT:‐   HABOG CONSULTANTS PVT. LTD. 
 
DESIGN CONSULTANT:‐    ASIA INFRASTRUCTURE ADVISORY SERVICES PVT. LTD. 

You might also like