UPGRADING PUNALUR TO PONKUNNAM ROAD (SH 8) ‐ PACKAGE 8C: KM 60+000 (PLACHERRY) TO KM 82+173 (PONKUNNAM) ON
ENGINEERING, PROCUREMENT, CONSTRUCTION (EPC)
GOOD FOR CONSTRUCTION DRAWINGS (BOX CULVERTS & PIPE CULVERTS – 40 Nos)
July‐2020
CLIENT:‐ KERALA STATE TRANSPORT PROJECT
EPC CONTRACTOR:‐ SREEDHANYA NATH JV.
PROOF CONSULTANT:‐ HABOG CONSULTANTS PVT. LTD.
DESIGN CONSULTANT:‐ ASIA INFRASTRUCTURE ADVISORY SERVICES PVT. LTD.