BOQ Summary Page 1 of 1

BOQ SUMMARY

Project Name: A

Element :  Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C28 (cum) 3.88 70.00 271
Sub Total 3.88 271

2 Rebar Ø6 (Fe250) (kg) 76.93 50.00 3846


3 Rebar DB14 (Fe390) (kg) 358.72 1.00 359
Sub Total 435.65 4,205

4 Shuttering (sq.M) 38.78 7.00 271


Sub Total 271

Grand Total 4,748

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 112.34 kg/cum
2 Concrete % C28 = 100.00 % 
3 Shuttering  = 10.00 sqm/cum